Evidence record
Current operator confirms operating AT4. Operator sustainability address schedule identifies 450 Interstate North Parkway; Census adds an unverified Southeast suffix, so geometry stays held.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-29
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.