Compute Equity Atlas
← National map
Source-backed project record · TX

FO Permian Partners / HiVolt Energy Midland County Campus

This record consolidates 9 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
SOURCE_BACKEDbest evidence tier
9linked evidence rows
Project facts

Location and operating record

Operator / developerHiVolt Energy (power operations)
JurisdictionNOT_FOUND, TX
AddressNot published
Location precisionlocality centroid
Coordinates32.024642, -102.113467
CapacityNot established
AliasesFO Permian Partners / HiVolt Energy Midland County Campus · FO Permian Midland site · FO Permian Partners off-grid gas campus
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

FO Permian Partners / HiVolt Energy Midland County Campus: source record

planned

Power-first / off-grid campus offering. The >5 GW figure is a total development ambition across a 3,200-acre tract; only 320 acres are secured and only 150 MW is described as near-term.

Key data: Off-grid: custom reciprocating gas engines operated by HiVolt Energy plus redundant battery | Off-grid / behind-the-meter

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

FO Permian Partners / HiVolt Energy Midland County Campus: ownership and profile

planned

Developer: FO Permian Partners | Owner: FO Permian Partners | County: Midland | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

FO Permian Partners / HiVolt Energy Midland County Campus: power and grid

planned

Key data: Utility: Off-grid: custom reciprocating gas engines operated by HiVolt Energy plus redundant battery | Utility region: Off-grid (Permian Basin) | Grid area: Off-grid / behind-the-meter | Requested load MW: 150 | Onsite generation MW: 5000

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

FO Permian Partners / HiVolt Energy Midland County Campus: water and cooling

planned

Key data: Water source: Industrial water reported available

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

FO Permian Partners / HiVolt Energy Midland County Campus: permits and jurisdiction

planned

Key data: Jurisdictions: Midland County

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

FO Permian Partners / HiVolt Energy Midland County Campus: environment and site

planned

Site described as being in an air-quality attainment zone

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

FO Permian Partners / HiVolt Energy Midland County Campus: timeline

planned

FO Permian Partners and HiVolt Energy unveil a more than 5 GW off-grid gas power solution for Texas data centers, with 320 acres secured in Midland County and a 150 MW 'ready-now' phase 1 potentially operational as early as 2026

Claim classification: Not yet assigned

Status date: NOT_FOUND (reported by DCD)

Open source 1 →

ONSITE GENERATION

FO Permian Partners / HiVolt Energy Midland County Campus: onsite generation

planned

FO Permian Partners and HiVolt Energy unveiled a more than 5 GW off-grid natural gas power solution for Texas data centers, with 320 acres secured within a 3,200-acre Midland County tract and a 150 MW 'ready-now' phase 1 potentially operational as early as 2026.

Key data: 320 acres secured of 3,200; >5 GW planned; 150 MW phase 1

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Open source 1 →

POWER SUPPLIER

FO Permian Partners / HiVolt Energy Midland County Campus: power supplier

planned

Power would come from custom reciprocating engines operated by HiVolt Energy with redundant battery backup, on a site described as being in an air-quality attainment zone with industrial water available.

Key data: Custom recip engines operated by HiVolt plus redundant battery

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

FO Permian Partners / HiVolt Energy Midland County Campus Data Center Project | NOT_FOUND | Compute Equity Atlas