This record consolidates 17 research observations while retaining source distinctions, location precision and unresolved fields.

approved_or_permittedproject status
VERIFIED_PRIMARYbest evidence tier
17linked evidence rows
Project facts

Location and operating record

Operator / developerCarlyle Group (conditionally selected private partner)
JurisdictionEl Paso (far east El Paso, on Fort Bliss land), TX
AddressNear Loop 375 and Montana Avenue, east of Camp East Montana, near El Paso Electric's Montana Power Station
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesFort Bliss hyperscale data center campus (U.S. Army / Carlyle Group) · Fort Bliss Enhanced Use Lease data center site · Project Jupiter (referenced in coverage) · Fort Bliss hyperscaled data centers
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure2 rows
SOURCE RECORD

Fort Bliss hyperscale data center campus (U.S. Army / Carlyle Group): source record

approved

No definitive agreement has been signed as of the sources reviewed; capacity figures are Army and press projections, not contracted load. | Original status detail: "approved (conditional selection and exclusive negotiations; no definitive agreement signed)"

Key data: El Paso Electric (regional utility; the project is expected to rely largely on new on-site generation) | Western Interconnection / WECC - NOT ERCOT | Fort Bliss Water, with El Paso Water as backup | Not applicable - federal land

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Fort Bliss hyperscale data center campus (U.S. Army / Carlyle Group): ownership and profile

approved

Developer: Carlyle Group under an Enhanced Use Lease with the U.S. Army | Owner: United States Army (federal land, leased under 10 U.S.C. 2667) | Permit applicant: U.S. Army Corps of Engineers handles lease negotiation and environmental review | County: El Paso | Research region: Amarillo-Panhandle / Lubbock-South Plains / El Paso-Far West | Tenants/customers: NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Fort Bliss hyperscale data center campus (U.S. Army / Carlyle Group): power and grid

approved

Key data: Utility: El Paso Electric (regional utility; the project is expected to rely largely on new on-site generation) | Utility region: El Paso Electric service territory | Grid area: Western Interconnection / WECC - NOT ERCOT | Substations: Near El Paso Electric's Montana Power Station | Transmission: El Paso Electric system, with about 2.9 GW of capacity against a 2.3 GW peak in summer 2023

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Fort Bliss hyperscale data center campus (U.S. Army / Carlyle Group): water and cooling

approved

Key data: Water utility: Fort Bliss Water, with El Paso Water as backup | Water source: Fort Bliss water system with El Paso Water backup | Water demand: Claimed water neutral; no quantified demand published

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Fort Bliss hyperscale data center campus (U.S. Army / Carlyle Group): permits and jurisdiction

approved

Key data: Zoning case: Not applicable - federal land | Permit IDs: Enhanced Use Lease under 10 U.S.C. 2667 (in negotiation),Army Corps of Engineers environmental review (pending) | Enhanced Use Lease under 10 U.S.C. 2667 (in negotiation) | Army Corps of Engineers environmental review (pending) | Jurisdictions: U.S. Army / Fort Bliss | U.S. Army Corps of Engineers | El Paso County (surrounding) | El Paso Electric

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Fort Bliss hyperscale data center campus (U.S. Army / Carlyle Group): civic and community

approved

Public listening session in April 2026 raised water and electricity concerns; the projected load is roughly three times Meta's El Paso electricity use

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

El Paso County Commissioners Court asked Gov. Abbott on Aug 17, 2026 to pause data center development in the region

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Fort Bliss hyperscale data center campus (U.S. Army / Carlyle Group): environment and site

approved

Army Corps of Engineers environmental review pending

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Likely combined-cycle gas turbine generation on federal land

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Key data: Surrounding infrastructure: Loop 375

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Key data: Surrounding infrastructure: Montana Avenue

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Key data: Surrounding infrastructure: El Paso Electric Montana Power Station

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Key data: Surrounding infrastructure: Camp East Montana

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Fort Bliss hyperscale data center campus (U.S. Army / Carlyle Group): timeline

approved

Army issues an RFP for hyperscaled data centers on Army land

Claim classification: Not yet assigned

Status date: 2025-12

Open source 1 →

approved

Army announces a conditional agreement and exclusive negotiations with private industry

Claim classification: Not yet assigned

Status date: 2026-03-26

Open source 1 →

approved

Public listening session held in El Paso

Claim classification: Not yet assigned

Status date: 2026-04

Open source 1 →

approved

Initial Operating Capability targeted for FY2027, with the Army aiming to operate by late 2027

Claim classification: Not yet assigned

Status date: 2027

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Fort Bliss hyperscale data center campus (U.S. Army / Carlyle Group) Data Center Project | El Paso (far east El Paso, on Fort Bliss land) | Compute Equity Atlas