Goodnight Data Center

This canonical record consolidates 13 source-backed observations without discarding aliases, limitations or unresolved dimensions.

operationalproject status
VERIFIED_PRIMARYbest evidence tier
13linked evidence rows
Project facts

Location and operating record

Operator / developerGoogle partnering with Crusoe on the Armstrong County site
JurisdictionArmstrong County / Claude, TX
Address10001 Lima Road)
Location precisionstreet address
Coordinatesnull, null
Capacity933 MW
AliasesGoodnight Data Center · Goodnight Data Center (GN DC1 LLC, Crusoe)
Evidence coverage

What has been researched

Project profile8 rows
Intent / permits1 rows
Civic / infrastructure4 rows
EXACT LOCATION

Goodnight Data Center: exact location

CORROBORATED

Facility indexed in Armstrong County with a TCEQ wastewater permit; nearest named waterway is Dripping Springs Creek

Key data: TCEQ wastewater permit WQ0016881001; Dripping Springs Creek approximately 1.7 miles away

Limitation: No street address, parcel ID or lat-long was published on any page fetched for this site

Open source →

OWNERSHIP CHAIN

Goodnight Data Center: ownership chain

VERIFIED_PRIMARY

Air permittee is a single-purpose Crusoe affiliate; the county tax-abatement agreement is executed by a Crusoe officer

Key data: Permittee "GN DC1, LLC"; abatement agreement entity "GNDC1, LLC" signed by Jamey Seely, jseely@crusoe.ai

Limitation: Entity name is spelled both "GN DC1, LLC" and "GNDC1, LLC" across sources

Open source →

OPERATOR

Goodnight Data Center: operator

CORROBORATED

Crusoe develops and operates; reporting identifies Google as the partner taking the capacity

Key data: Google partnering with Crusoe on the Armstrong County site

Limitation: Contract structure between Crusoe and Google not disclosed

Open source →

POWER SUPPLIER

Goodnight Data Center: power supplier

CORROBORATED

Primary supply is an on-site gas plant operating off-grid, co-located behind the meter with an adjacent wind project; the distribution co-op of record is listed as Swisher Electric

Key data: 933 MW on-site gas generation; behind-the-meter with Goodnight Wind (265.5 MW, Serena Energy); utility listed "SWISHER ELECTRIC COOP, INC"

Limitation: The co-op listing comes from a permit-aggregation database, not from Swisher Electric or an interconnection agreement

Open source →

WATER SUPPLIER

Goodnight Data Center: water supplier

DISCOVERY_LEAD

Groundwater in this area is regulated by the Panhandle Groundwater Conservation District; a TCEQ wastewater permit covers discharge

Key data: Panhandle Groundwater Conservation District as the groundwater regulator; TCEQ WQ0016881001

Limitation: No well permit number, water supplier or supply agreement specific to GN DC1 was found

Open source →

JURISDICTION STACK

Goodnight Data Center: jurisdiction stack

VERIFIED_PRIMARY

Unincorporated Armstrong County with county commissioners court abatement, TCEQ state permits, and Panhandle GCD groundwater district

Key data: Armstrong County property tax abatement agreement, amended and restated consolidated second agreement, posted by the county

Limitation: School district participation in the abatement was not confirmed from the fetched text

Open source →

SURROUNDING INFRASTRUCTURE

Goodnight Data Center: surrounding infrastructure

CORROBORATED

Nearest high-voltage line and waterway distances are catalogued, and the site is adjacent to an operating wind farm

Key data: 345 kV transmission line approximately 3.3 miles away; Dripping Springs Creek approximately 1.7 miles

Limitation: Substation names, water/sewer mains, rail and fiber not stated

Open source →

ECON DEV CONTACT and GENERAL CONTACT

Goodnight Data Center: econ dev contact and general contact

VERIFIED_PRIMARY

The only named contact found is the Crusoe officer signing the county abatement

Key data: Jamey Seely, jseely@crusoe.ai

Limitation: No Armstrong County economic development office or public information line was published

Open source →

AIR PERMIT APPLICATION

Goodnight Data Center: air permit application

Application submitted and "determined administratively complete"; technical review to be conducted; processed on an expedited basis

Key data: n.a. (not stated in notice)

Status date: Application submitted 01/30/2026; amended notice issued 02/11/2026

Limitation: Notice does not state MW or building size. Also listed as pending on the TCEQ NSR pending report (received 01/30/2026).

Open source →

WATER WITHDRAWAL VOLUME

Goodnight Data Center: water withdrawal volume

Permit filed

A TCEQ wastewater permit (WQ0016881001) is on file for GN DC1 LLC, but no projected consumption is published; the site sits over the High Plains Aquifer in a basin rated "Extremely High" baseline water stress.

Key data: TCEQ permit WQ0016881001; baseline water stress "Extremely High (>80%)"; volume n.a.

Status date: 2026 (page as of mid-2026)

Limitation: Aggregator page; the TCEQ permit document itself was not fetched. Water-stress rating is a basin indicator, not measured facility use.

Open source →

UTILITY INTERCONNECTION QUEUE

Goodnight Data Center: utility interconnection queue

Under construction / PUCT review ongoing

Phase 1 tax-abatement documents describe up to 530 MW across four buildings (four 25 MW data halls each); planned capacity 933 MW matched by 933 MW of off-grid on-site gas generation with **no ERCOT grid connection for that generation asset**; a co-located 265.5 MW wind farm (Goodnight Wind) is proposed under an SB6 net-metering arrangement pending at PUCT.

Key data: 933 MW planned capacity, 933 MW off-grid gas; Phase 1 up to 530 MW; 265.5 MW co-located wind

Status date: 2026 (mid-2026)

Limitation: PUCT net-metering docket number not stated in the fetched page.

Open source →

AGRICULTURAL OR LAND USE CONVERSION

Goodnight Data Center: agricultural or land use conversion

Under construction

Site is 350 acres in rural Armstrong County; the aggregated record does not state prior farm/ranch use, and no agricultural mitigation condition appears in the abatement record.

Key data: 350 acres; prior use not stated

Status date: 2026

Limitation: Prior land use unverified; county appraisal records not accessible this session.

Open source →

FISCAL IMPACT LOCAL GOVERNMENT

Goodnight Data Center: fiscal impact local government

Executed / amended

Armstrong County granted a Chapter 312 ad valorem abatement (2024) of up to 10 years worth **$5.4 million per year per phase / $10.8 million per year at full build-out**, restructured in 2025 into per-building PILOTs of **$1.35 million per year per building once operational**; the county attorney said total dollars would not change. Both the 2024 abatement and the 2025 PILOT amendment were approved unanimously after public hearings. First county payment expected June/July 2026.

Key data: $5.4M/yr per phase; $10.8M/yr at full build-out; PILOT $1.35M/yr/building

Status date: 2025 (amendment); first payment 2026-06/07

Limitation: Underlying county agreement not fetched directly; a Chapter 313 application for "Claude ISD / FGE Goodnight II" also exists in Comptroller files but was not fetched.

Open source →

Sources

Evidence and provenance

  • Compute Atlas · CORROBORATED
    Limitation: No street address, parcel ID or lat-long was published on any page fetched for this site
  • Armstrong County, Texas · VERIFIED PRIMARY
    Limitation: Entity name is spelled both "GN DC1, LLC" and "GNDC1, LLC" across sources
  • The Energy Mag · CORROBORATED
    Limitation: Contract structure between Crusoe and Google not disclosed
  • datacenter.fyi · CORROBORATED
    Limitation: The co-op listing comes from a permit-aggregation database, not from Swisher Electric or an interconnection agreement
  • Panhandle Groundwater Conservation District · DISCOVERY LEAD
    Limitation: No well permit number, water supplier or supply agreement specific to GN DC1 was found
  • TCEQ · VERIFIED PRIMARY
    Limitation: Notice does not state MW or building size. Also listed as pending on the TCEQ NSR pending report (received 01/30/2026).
  • Compute Atlas · CORROBORATED
    Limitation: Aggregator page; the TCEQ permit document itself was not fetched. Water-stress rating is a basin indicator, not measured facility use.

Open TX state research →

Goodnight Data Center Data Center Project | Armstrong County / Claude | Compute Equity Atlas