Homer City Generation Site Redevelopment

This canonical record consolidates 11 source-backed observations without discarding aliases, limitations or unresolved dimensions.

approved_or_permittedproject status
VERIFIED_PRIMARYbest evidence tier
11linked evidence rows
Project facts

Location and operating record

Operator / developerCEO Corey Hessen; VP Robin Gorman; Amazon reported as customer
JurisdictionIndiana County, PA
AddressNot published
Location precisionlocality
Coordinatesnull, null
Capacity4500 MW
AliasesHomer City Generation Site Redevelopment
Evidence coverage

What has been researched

Project profile9 rows
Intent / permits1 rows
Civic / infrastructure1 rows
OWNERSHIP CHAIN

Homer City Generation Site Redevelopment: ownership chain

VERIFIED_PRIMARY

The site is controlled by Homer City Redevelopment LLC, whose parent is Knighthead Capital Management; the air permit holder is Homer City Generation, L.P.

Key data: Homer City Redevelopment LLC ← Knighthead Capital Management; permittee Homer City Generation, L.P.

Limitation: Data-center tenant/owner structure (Amazon reported) not confirmed in the primary release.

Open source →

OPERATOR

Homer City Generation Site Redevelopment: operator

CORROBORATED

Homer City Redevelopment leads the campus with CEO Corey Hessen; Post-Gazette reporting identifies Amazon as the anticipated data-center customer at the site.

Key data: CEO Corey Hessen; VP Robin Gorman; Amazon reported as customer

Limitation: Amazon has not confirmed publicly in fetched primary sources.

Open source →

POWER SUPPLIER

Homer City Generation Site Redevelopment: power supplier

VERIFIED_PRIMARY

On-site self-generation: seven GE Vernova 7HA.02 combined-cycle turbines totaling ~4.4–4.5 GW under PA DEP plan approval 32-00457A, fueled by EQT natural gas, with interconnection to PJM (and interest from NYISO markets).

Key data: 7× GE Vernova 7HA.02, ~4.5 GW; DEP plan approval 32-00457A; EQT gas supply; PJM

Limitation: PJM interconnection queue number not published in fetched sources.

Open source →

WATER SUPPLIER

Homer City Generation Site Redevelopment: water supplier

DISCOVERY_LEAD

NOT_FOUND for a named water utility or withdrawal permit. The legacy plant used cooling infrastructure on site (Two Lick Creek reservoir area is referenced in GEM's plant history), but no data-center-era supplier, allocation or DEP water permit was located.

Limitation: Legacy cooling water rights presumed to transfer; unconfirmed.

Open source →

JURISDICTION STACK

Homer City Generation Site Redevelopment: jurisdiction stack

CORROBORATED

Center Township and Indiana County handle local land use; PA DEP (Southwest/air quality program) issued plan approval 32-00457A; a 5.8-mile gas pipeline crosses Burrell Township; PJM governs interconnection.

Key data: Center Township; Indiana County; PA DEP; Burrell Township (pipeline); PJM

Limitation: n.a.

Open source →

PLANNING ZONING CONTACT

Homer City Generation Site Redevelopment: planning zoning contact

DISCOVERY_LEAD

NOT_FOUND. Searched Center Township and Indiana County sources; no township planning/zoning officer or county planning contact for this project was published in fetched pages — the project has advanced primarily through state permitting.

Limitation: Indiana County Office of Planning & Development page not retrieved.

Open source →

ECON DEV CONTACT

Homer City Generation Site Redevelopment: econ dev contact

DISCOVERY_LEAD

NOT_FOUND for a named economic-development officer. Coverage references state-level support and the Indiana County Development Corporation ecosystem generally, but no named contact appeared in the fetched sources.

Limitation: n.a.

Open source →

GENERAL CONTACT

Homer City Generation Site Redevelopment: general contact

VERIFIED_PRIMARY

The developer publishes a press mailbox, and its releases route media through an outside firm.

Key data: press@homercityredevelopment.com; HomerCity@longacresquare.com

Limitation: n.a.

Open source →

SURROUNDING INFRASTRUCTURE

Homer City Generation Site Redevelopment: surrounding infrastructure

CORROBORATED

The campus reuses an existing 1,884 MW-class coal plant footprint with high-voltage transmission and rail legacy; a new 5.8-mile, 30-inch natural gas lateral runs from Marco Road in Burrell Township to the site.

Key data: 5.8-mile 30-inch gas pipeline from Marco Road, Burrell Twp; legacy transmission from 1,884 MW coal plant

Limitation: Transmission voltages and fiber routes not documented.

Open source →

NEW BUILD UNDERWAY

Homer City Generation Site Redevelopment: new build underway

"Final Plan Approval" (32-00457A); TVOP "Renewal"; DEP "issued a second GP-11 Air Quality General Permit ... to construct and operate diesel-fired nonroad engines"; several blasting addenda "Approved"

Key data: Site >3,200 acres; former plant 2 GW; campus MW not stated on the DEP page

Status date: 32-00457A: November 18, 2025; TVOP 32-00055 renewal: February 26, 2026; GP11-32-00461A: January 3, 2026; GP11-32-00461B: PA Bulletin April 18, 2026

Limitation: Blasting/demolition permits confirm active site work; the campus's own data-center building permits are municipal and were not located.

Open source →

RATEPAYER OR GRID IMPACT

Homer City Generation Site Redevelopment: ratepayer or grid impact

Awarded

The project received a $5 million state grant for pipeline interconnection, a direct public subsidy to a private data center power project.

Key data: $5 million state grant for pipeline interconnection

Status date: 2026

Limitation: Grant program and award date not specified

Open source →

Sources

Evidence and provenance

Open PA state research →

Homer City Generation Site Redevelopment Data Center Project | Indiana County | Compute Equity Atlas