Compute Equity Atlas
← National map
Source-backed project record · LA

Hut 8 "River Bend"

This canonical record consolidates 9 source-backed observations without discarding aliases, limitations or unresolved dimensions.

approved_or_permittedproject status
VERIFIED_PRIMARYbest evidence tier
9linked evidence rows
Project facts

Location and operating record

Operator / developerHut 8 (operator); Fluidstack (tenant)
JurisdictionWest Feliciana Parish, LA
Address964 near St. Francisville, and requires ~$16 million of parish water infrastructure upgrades plus a new Entergy substation and switchyard.
Location precisionstreet address
Coordinatesnull, null
Capacity330 MW
AliasesHut 8 "River Bend"
Evidence coverage

What has been researched

Project profile9 rows
Intent / permits0 rows
Civic / infrastructure0 rows
OWNERSHIP CHAIN

Hut 8 "River Bend": ownership chain

CORROBORATED

Hut 8 acquired the site in February and structured the deal so the land is donated to the parish Industrial Development Board, which leases it back to the company — a payment-in-lieu structure projected to yield roughly $90 million/year to the parish.

Key data: Hut 8 → West Feliciana Parish Industrial Development Board (donation + leaseback)

Limitation: Lease/PILOT instrument numbers not published.

Open source →

OPERATOR

Hut 8 "River Bend": operator

CORROBORATED

Hut 8 develops and operates the campus; Fluidstack (Google-supported, with an Anthropic lease reported) is the announced tenant for the AI capacity.

Key data: Hut 8 (operator); Fluidstack (tenant)

Limitation: Tenant/lease terms are press-reported; not confirmed in a primary filing fetched here.

Open source →

POWER SUPPLIER

Hut 8 "River Bend": power supplier

VERIFIED_PRIMARY

Entergy Louisiana will serve the campus with about 330 MW of utility capacity (245 MW IT), scalable toward 1,000 MW, and is building a dedicated substation and switchyard; Entergy announced the selection publicly.

Key data: Entergy Louisiana; 330 MW utility / 245 MW IT, scalable to ~1,000 MW; new substation + switchyard

Limitation: LPSC docket number for the service agreement not identified in fetched sources.

Open source →

WATER SUPPLIER

Hut 8 "River Bend": water supplier

CORROBORATED

Hut 8 committed about $16 million toward parish water infrastructure upgrades; the regional supply is the Coastal Lowlands aquifer system, with no state withdrawal permit required in Louisiana.

Key data: ~$16M Hut 8 commitment to parish water upgrades; Coastal Lowlands aquifer

Limitation: Parish utility entity and volumes not specified; no permit record exists to verify.

Open source →

JURISDICTION STACK

Hut 8 "River Bend": jurisdiction stack

VERIFIED_PRIMARY

The West Feliciana Parish Planning & Zoning Commission approved the project 6-0, with the Parish Council and Industrial Development Board handling the land/PILOT structure; Entergy service is regulated by the LPSC and LDEQ permits emissions.

Key data: WF Parish P&Z Commission (6-0); Parish Council; Industrial Development Board; LPSC; LDEQ

Limitation: n.a.

Open source →

PLANNING ZONING CONTACT

Hut 8 "River Bend": planning zoning contact

VERIFIED_PRIMARY

The parish publishes its Development Services director with direct email and phone as the planning and zoning contact.

Key data: Gary Mego, Director of Development Services — gmego@wfparish.org, 225-784-3725

Limitation: n.a.

Open source →

ECON DEV CONTACT

Hut 8 "River Bend": econ dev contact

CORROBORATED

Louisiana Economic Development handled the state-level package, with a named LED contact in project materials; the parish president is the local lead.

Key data: LED contact Emma Wagner, 912-467-2117; Parish President Kenny Havard

Limitation: Contact details aggregated by tracker from project materials; not verified on an LED page this session.

Open source →

GENERAL CONTACT

Hut 8 "River Bend": general contact

VERIFIED_PRIMARY

Company and utility spokespeople are named in coverage of the announcement.

Key data: Gautier Lemyze-Young (Hut 8); Brandon Scardigli (Entergy)

Limitation: No phone/email published for either spokesperson.

Open source →

SURROUNDING INFRASTRUCTURE

Hut 8 "River Bend": surrounding infrastructure

CORROBORATED

The site adjoins the River Bend nuclear station with 230 kV transmission ~0.2 miles away, sits on LA Highway 964 near St. Francisville, and requires ~$16 million of parish water infrastructure upgrades plus a new Entergy substation and switchyard.

Key data: River Bend Nuclear Station adjacency; 230 kV ~0.2 mi; LA 964; new substation/switchyard

Limitation: Fiber routes and sewer capacity not documented.

Open source →

Sources

Evidence and provenance

  • Government Technology · CORROBORATED
    Limitation: Lease/PILOT instrument numbers not published.
  • Louisiana AI · CORROBORATED
    Limitation: Tenant/lease terms are press-reported; not confirmed in a primary filing fetched here.
  • Entergy · VERIFIED PRIMARY
    Limitation: LPSC docket number for the service agreement not identified in fetched sources.
  • Technical.ly · CORROBORATED
    Limitation: Parish utility entity and volumes not specified; no permit record exists to verify.
  • West Feliciana Parish, LA · VERIFIED PRIMARY
    Limitation: n.a.
  • DataCenterDynamics · CORROBORATED
    Limitation: Fiber routes and sewer capacity not documented.

Open LA state research →

Hut 8 "River Bend" Data Center Project | West Feliciana Parish | Compute Equity Atlas