Compute Equity Atlas
← National map
Source-backed project record · TX

IREN Childress Data Center Campus

This record consolidates 2 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
FIRST_PARTY_IDENTITY_GEOGRAPHY_HELDbest evidence tier
2linked evidence rows
Project facts

Location and operating record

Operator / developerIREN
JurisdictionChildress, TX
AddressNot published
Location precisionlocality
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesIREN Childress Data Center Campus
Evidence coverage

What has been researched

Project profile— rows
Intent / permits— rows
Civic / infrastructure0 rows
SITE IDENTITY

IREN Childress Data Center Campus: site identity

Evidence record

August 2026 issuer update confirms Horizon 1 delivered to Microsoft at Childress, while Horizon 2 commissioning and Horizon 3-4 construction remain distinct future stages. One operating campus identity includes ongoing development; no claim all planned AI buildings are live. Archive row 4590 is the same campus. Exact facility address remains unresolved in this pass.

Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-30

Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.

Open source 1 →

Sources

Evidence and provenance

  • IREN ↗ · Retrieved 2026-10-30 · FIRST PARTY
    Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.
  • IREN ↗ · Retrieved 2026-10-30 · FIRST PARTY
    Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.

Open TX state research →

IREN Childress Data Center Campus Data Center Project | Childress | Compute Equity Atlas