Iron City #1 and #2

This canonical record consolidates 8 source-backed observations without discarding aliases, limitations or unresolved dimensions.

proposed_or_reviewproject status
VERIFIED_PRIMARYbest evidence tier
8linked evidence rows
Project facts

Location and operating record

Operator / developerIron City Wells, LLC (applicant); data-center operator undisclosed
JurisdictionClearfield County, PA
Address208 W. Third St., Suite 101, Williamsport, PA 17701
Location precisionstreet address
Coordinatesnull, null
CapacityNot established
AliasesIron City #1 and #2
Evidence coverage

What has been researched

Project profile8 rows
Intent / permits0 rows
Civic / infrastructure0 rows
OWNERSHIP CHAIN / OPERATOR

Iron City #1 and #2: ownership chain / operator

CORROBORATED

Iron City Wells, LLC is the applicant on both projects; trade coverage ties the sites to gas-fired behind-the-meter generation for data centers, without naming a data-center operator.

Key data: Iron City Wells, LLC (applicant); data-center operator undisclosed

Limitation: Parent company/registered agent for Iron City Wells LLC not retrieved; end user unknown.

Open source →

POWER SUPPLIER

Iron City #1 and #2: power supplier

CORROBORATED

PA DEP issued an air-quality permit for 15 natural-gas-fired generators supplying the data center behind the meter (off-grid), using local Marcellus gas rather than a utility.

Key data: 15 gas-fired generators, behind-the-meter (no utility supply)

Limitation: Permit number not captured in fetched text; no PJM interconnection (off-grid design).

Open source →

WATER SUPPLIER

Iron City #1 and #2: water supplier

DISCOVERY_LEAD

NOT_FOUND. Searched DEP eNotice coverage, county agendas and trade press; no water supplier, withdrawal source or volume was published for either Iron City site.

Limitation: Rural township location suggests wells; unconfirmed.

Open source →

JURISDICTION STACK

Iron City #1 and #2: jurisdiction stack

VERIFIED_PRIMARY

Clearfield County Planning Commission reviewed the projects; Karthaus and Beccaria Townships are the municipal authorities; PA DEP North-central Regional Office issued the air-quality permit.

Key data: Clearfield County Planning Commission; Karthaus Twp; Beccaria Twp; PA DEP NCRO

Limitation: n.a.

Open source →

PLANNING ZONING CONTACT

Iron City #1 and #2: planning zoning contact

DISCOVERY_LEAD

NOT_FOUND for a named planner. The county planning commission agenda documents the review but names no staff contact, and township-level zoning contacts for Karthaus and Beccaria were not published in fetched sources.

Key data: Clearfield County Planning Commission (body only)

Limitation: County department directory not successfully fetched.

Open source →

ECON DEV CONTACT

Iron City #1 and #2: econ dev contact

DISCOVERY_LEAD

NOT_FOUND. No Clearfield County economic development officer or authority contact tied to the Iron City projects was found in fetched county or trade sources.

Limitation: n.a.

Open source →

GENERAL CONTACT

Iron City #1 and #2: general contact

CORROBORATED

The DEP North-central Regional Office air program contact who handled the permit is published with a direct phone and office address.

Key data: Muhammad Q. Zaman, PA DEP NCRO — 570-327-3648, 208 W. Third St., Suite 101, Williamsport, PA 17701

Limitation: Applicant-side contact not published.

Open source →

SURROUNDING INFRASTRUCTURE

Iron City #1 and #2: surrounding infrastructure

DISCOVERY_LEAD

The projects sit in Marcellus Shale gas country and are designed around local gas supply with on-site generation rather than transmission service; no substation, water or fiber infrastructure was described.

Key data: Marcellus gas supply; behind-the-meter generation, no grid tie described

Limitation: Pipeline names/routes not published.

Open source →