Source-backed project record · TX

Lancium Clean Campus Abilene (Stargate 1)

This record consolidates 27 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
VERIFIED_PRIMARYbest evidence tier
27linked evidence rows
Project facts

Location and operating record

Operator / developerCrusoe Energy Systems LLC (data center operator); Lancium LLC / Lancium Abilene, LLC (campus operator per Texas Comptroller registry)
JurisdictionAbilene, TX
AddressNot published
Location precisionlocality centroid
Coordinates32.454514, -99.738147
Capacity1200 MW
AliasesLancium Clean Campus Abilene (Stargate 1) · Lancium Clean Campus - Abilene · Stargate 1 · Abilene Clean Campus · Crusoe Abilene AI Factory · Lancium Abilene Clean Campus I-X · Longhorn Data Center
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure2 rows
SOURCE RECORD

Lancium Clean Campus Abilene (Stargate 1): source record

operational

Flagship 'Stargate 1' site. Comptroller registry shows ten separate campus registrations (Lancium Abilene Clean Campus I-X) with Abilene DC 1-10, LLC as owners and Oracle America Cloud Services, LLC as occupant. datacenter.fyi separately lists a 224.9 MW 'LONGHORN DATA CENTER' under Abilene DC I, LLC (not independently verified). No source in this session gave latitude/longitude.

Key data: NOT_FOUND | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Lancium Clean Campus Abilene (Stargate 1): ownership and profile

operational

Developer: Crusoe Energy Systems LLC with Lancium LLC (site/energy campus developer) | Owner: Abilene DC 1-10, LLC (per Texas Comptroller data center registry); Lancium LLC | Property entity: Abilene DC 1, LLC; Abilene DC 3 LLC; Abilene DC 4, LLC; Abilene DC 5 LLC; Abilene DC 6 LLC; Abilene DC 7 LLC; Abilene DC 8 LLC; Abilene DC 9, LLC; Abilene DC 10, LLC | County: Taylor | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin | Tenants/customers: Oracle America Cloud Services, LLC (registered occupant) | Oracle Cloud Infrastructure | OpenAI (Stargate)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Lancium Clean Campus Abilene (Stargate 1): power and grid

operational

Key data: Utility region: ERCOT West | Grid area: ERCOT | Gross MW: 1200 | Requested load MW: 1200 | Grid/market records: 1.2 GW interconnect approved by ERCOT (per Lancium locations page)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Lancium Clean Campus Abilene (Stargate 1): water and cooling

operational

Key data: Water source: Closed-loop, water-neutral / zero-water-evaporation cooling system | Water demand: Effectively zero evaporative water use (closed loop) | Cooling: Direct-to-chip liquid cooling, closed-loop zero-water-evaporation

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Lancium Clean Campus Abilene (Stargate 1): permits and jurisdiction

operational

Key data: Permit IDs: SWPPP (stormwater pollution prevention plan) referenced by Lancium | Jurisdictions: Taylor County | City of Abilene (pending annexation as of 2021) | Development Corporation of Abilene | ERCOT | Texas Comptroller of Public Accounts | Tax incentives: [object Object],[object Object] | {"agreement_name":"Texas Comptroller Qualifying Large Data Center Project registration - Lancium Abilene Clean Campus I through X","agreement_number":"LD565448 / LD131731 / LD090472 / LD382318 / LD579814 / LD522306 / LD760309 / LD655815 / LD184807 / LD826063","approval_date":"2022-05-26 through 2026-06-17","estimated_value":"State sales-and-use tax exemption","government_entity":"Texas Comptroller of Public Accounts","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php","term":"NOT_FOUND"} | {"agreement_name":"Taylor County / City of Abilene / Development Corporation of Abilene partnership with Lancium","agreement_number":"NOT_FOUND","approval_date":"2021-12-21","estimated_value":"$2.4 billion projected investment; $993.4 million projected economic impact","government_entity":"Taylor County, City of Abilene, Development Corporation of Abilene","investment_commitment":"200 MW initial, expandable beyond 1 GW","jobs_commitment":"57 full-time jobs","source_url":"https://abilenetx.gov/DocumentCenter/View/16123/DCOA-Lancium-news-release","term":"20 years"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Lancium Clean Campus Abilene (Stargate 1): civic and community

operational

Projected $993.4M economic impact over 20 years (2021 announcement)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

Thousands of construction workers in the Abilene labor market

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Lancium Clean Campus Abilene (Stargate 1): environment and site

operational

Closed-loop, zero-water-evaporation cooling avoids evaporative water consumption

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

On-site natural gas turbines used for backup power

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

BESS and solar integrated on campus

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

Key data: Surrounding infrastructure: On-site battery energy storage (BESS)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

Key data: Surrounding infrastructure: On-site solar

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

Key data: Surrounding infrastructure: Natural gas turbines for backup generation

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Lancium Clean Campus Abilene (Stargate 1): timeline

operational

Taylor County, City of Abilene and DCOA announce partnership with Lancium for Abilene Clean Campus; ~800 acres, 200 MW initial

Claim classification: Not yet assigned

Status date: 2021-12-21

Open source 1 →

operational

Registered as Qualifying Large Data Center Project with Texas Comptroller (Lancium Abilene Clean Campus)

Claim classification: Not yet assigned

Status date: 2022-05-26

Open source 1 →

operational

Construction of phase 1 (2 buildings, ~980,000 sq ft, >200 MW) begins

Claim classification: Not yet assigned

Status date: 2024-06

Open source 1 →

operational

Crusoe announces expansion of Abilene campus to 1.2 GW / 8 buildings / ~4M sq ft

Claim classification: Not yet assigned

Status date: 2025-03-18

Open source 1 →

operational

First two buildings officially live, >200 MW IT capacity serving Oracle Cloud Infrastructure for OpenAI's Stargate

Claim classification: Not yet assigned

Status date: 2025-09-30

Open source 1 →

operational

Comptroller registrations added for Lancium Abilene Clean Campus IX and X

Claim classification: Not yet assigned

Status date: 2026-06-17

Open source 1 →

PROJECT TIMELINE

Lancium Clean Campus Abilene (Stargate 1): project timeline

announced

Taylor County, the City of Abilene and the Development Corporation of Abilene announced a partnership with Lancium to build the Abilene Clean Campus on roughly 800 acres, with groundbreaking targeted for Q1 2022 and annexation pending.

Key data: ~800 acres; 200 MW initial; groundbreaking Q1 2022

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2021-12-21

Open source 1 →

TAX INCENTIVES

Lancium Clean Campus Abilene (Stargate 1): tax incentives

announced

The 2021 partnership release quantified the deal at $2.4 billion of investment over 20 years with 57 full-time jobs and a projected $993.4 million economic impact.

Key data: $2.4B / 20 years; 57 FT jobs; $993.4M economic impact

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2021-12-21

Open source 1 →

CAPACITY GROSS POWER

Lancium Clean Campus Abilene (Stargate 1): capacity gross power

operational

Lancium states the Abilene Clean Campus has an ERCOT-approved 1.2 GW interconnect and is its flagship 'Stargate 1' site.

Key data: 1.2 GW ERCOT-approved interconnect

Claim classification: COMPANY_CLAIM · Verification: VERIFIED · Retrieved: 2026-09-05

Limitation: Company self-reported; no ERCOT filing reviewed.

Open source 1 →

BUILDING SQFT

Lancium Clean Campus Abilene (Stargate 1): building sqft

under_construction

Crusoe's expansion announcement describes phase 1 as two buildings totalling about 980,000 sq ft at over 200 MW, and phase 2 as six additional buildings for eight total and roughly 4 million sq ft at 1.2 GW.

Key data: 8 buildings; ~4,000,000 sq ft; 1.2 GW

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2025-03-18

Open source 1 →

COOLING TECHNOLOGY

Lancium Clean Campus Abilene (Stargate 1): cooling technology

under_construction

The campus uses direct-to-chip liquid cooling in a zero-water-evaporation closed loop, paired with on-site BESS, solar and natural gas turbines for backup.

Key data: Direct-to-chip liquid cooling; zero-water-evaporation closed loop

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2025-03-18

Open source 1 →

TENANT CUSTOMER

Lancium Clean Campus Abilene (Stargate 1): tenant customer

operational

The first two buildings went live serving Oracle Cloud Infrastructure for OpenAI's Stargate at more than 200 MW of IT capacity, with the expansion targeted for completion in mid-2026.

Key data: >200 MW IT live; Oracle Cloud Infrastructure for OpenAI

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2025-09-30

Open source 1 →

OWNERSHIP CHAIN

Lancium Clean Campus Abilene (Stargate 1): ownership chain

operational

The Texas Comptroller registry lists ten separate registrations, Lancium Abilene Clean Campus I through X, owned by Abilene DC 1 through 10, LLC with Oracle America Cloud Services, LLC as the registered occupant and Lancium and Oracle entities as operators.

Key data: Abilene DC 1-10, LLC; occupant Oracle America Cloud Services, LLC

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-17

Open source 1 →

JOBS

Lancium Clean Campus Abilene (Stargate 1): jobs

under_construction

Crusoe reported roughly 2,000 daily construction workers during phase 1 rising to about 5,000 during the expansion.

Key data: ~2,000 rising to ~5,000 daily construction workers

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2025-03-18

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Lancium Clean Campus Abilene (Stargate 1) Data Center Project | Abilene | Compute Equity Atlas