LandBridge / NRG Delaware Basin Data Center Power Project

This record consolidates 12 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
SOURCE_BACKEDbest evidence tier
12linked evidence rows
Project facts

Location and operating record

Operator / developerNRG Energy, Inc. (prospective plant operator)
JurisdictionNOT_FOUND, TX
AddressNot published
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesLandBridge / NRG Delaware Basin Data Center Power Project · LandBridge Reeves County acreage adjacent to the Waha hub
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

LandBridge / NRG Delaware Basin Data Center Power Project: source record

planned

Power-first project with no FID as of the source date. The hyperscale data center customer is unnamed and it is not established whether this project is related to the Microsoft/Energy Forge One or Prometheus/Istmo Pecos projects.

Key data: Grid-connected ERCOT gas-fired generation | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

LandBridge / NRG Delaware Basin Data Center Power Project: ownership and profile

planned

Developer: LandBridge Company LLC with NRG Energy, Inc. | Owner: LandBridge Company LLC (landowner) | Permit applicant: Air permit applications and interconnection requests filed (applicant entity not named in the source) | County: Reeves | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin | Tenants/customers: Unnamed hyperscale data center

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

LandBridge / NRG Delaware Basin Data Center Power Project: power and grid

planned

Key data: Utility: Grid-connected ERCOT gas-fired generation | Utility region: ERCOT West | Grid area: ERCOT | Onsite generation MW: 1100 | Grid/market records: Interconnection requests filed (docket numbers not published in the source)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

LandBridge / NRG Delaware Basin Data Center Power Project: water and cooling

planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

LandBridge / NRG Delaware Basin Data Center Power Project: permits and jurisdiction

planned

Key data: Permit IDs: Air permit applications filed (permit numbers not published in the source) | Jurisdictions: Reeves County | TCEQ | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

LandBridge / NRG Delaware Basin Data Center Power Project: environment and site

planned

1,100 MW of new gas-fired generation proposed

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Waha natural gas hub

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

LandBridge / NRG Delaware Basin Data Center Power Project: timeline

planned

LandBridge and NRG announce a preliminary agreement for a potential 1,100 MW gas-fired plant on LandBridge land in Reeves County to power a hyperscale data center; air permit applications and interconnection requests filed; no final investment decision

Claim classification: Not yet assigned

Status date: 2025-09-25

Open source 1 →

planned

Commercial operation date target

Claim classification: Not yet assigned

Status date: 2029-12-31 (target)

Open source 1 →

ONSITE GENERATION

LandBridge / NRG Delaware Basin Data Center Power Project: onsite generation

planned

LandBridge Company and NRG Energy struck a preliminary agreement for a potential 1,100 MW gas-fired plant on LandBridge land in Reeves County adjacent to the Waha hub to power a hyperscale data center, with a grid-connected ERCOT design.

Key data: 1,100 MW gas-fired; LandBridge land adjacent to Waha hub

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2025-09-25

Open source 1 →

OTHER PERMITS

LandBridge / NRG Delaware Basin Data Center Power Project: other permits

planned

Air permit applications and interconnection requests have been filed for the project, but no final investment decision has been reached and the commercial operation date target is year-end 2029.

Key data: Air permits and interconnection requests filed; no FID; COD target end-2029

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2025-09-25

Limitation: Permit and docket numbers were not published in the source.

Open source 1 →

TENANT CUSTOMER

LandBridge / NRG Delaware Basin Data Center Power Project: tenant customer

planned

The hyperscale data center that would take the power is unnamed, and no source reviewed connects this project to the Microsoft/Energy Forge One or Prometheus/Istmo Pecos campuses.

Key data: Data center customer unnamed

Claim classification: SOURCED_FACT · Verification: UNVERIFIED · Retrieved: 2026-09-05

Status date: 2025-09-25

Open source 1 →