LEDA-owned industrial tracts with suspected data center use (Lubbock)

This record consolidates 3 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
DISCOVERY_LEADbest evidence tier
3linked evidence rows
Project facts

Location and operating record

Operator / developerNOT_FOUND
JurisdictionLubbock, TX
Address800 block of Drew Street (west of Lubbock airport, west of I-27), plus a north Lubbock tract near rail and a 52-acre tract near I-27
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesLEDA-owned industrial tracts with suspected data center use (Lubbock) · LEDA industrial land assemblage west of Lubbock airport and in north Lubbock
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

LEDA-owned industrial tracts with suspected data center use (Lubbock): source record

planned

Not a confirmed data center. Recorded because the annexations and rezonings were publicly contested specifically over data center speculation, and LEDA is the same agency behind Project Infrared. | Original status detail: "planned (land assembled, annexed and rezoned industrial; no data center project confirmed)"

Key data: Lubbock Power & Light (assumed for in-city tracts, not confirmed for a specific project) | ERCOT (LP&L) | City of Lubbock | City Council annexation and rezoning actions in July 2026 (single-family to industrial for the 52-acre tract); case numbers not published in the fetched reports

Claim classification: Not yet assigned

Status date: 2026-09-05