Legacy Investing Data Center - 1000 Bolton Road

This record consolidates 14 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
SOURCE_BACKEDbest evidence tier
14linked evidence rows
Project facts

Location and operating record

Operator / developerNOT_FOUND
JurisdictionMarion / Cibolo, TX
Address1000 Bolton Road
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesLegacy Investing Data Center - 1000 Bolton Road · 1000 Bolton Road · Chicago Byte Exchange CBE1 · CBE1 · Cibolo data center
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Legacy Investing Data Center - 1000 Bolton Road: source record

planned

Marketed under both the developer name and the CBE1 / Chicago Byte Exchange brand; no permit, zoning case or utility record located this session, so the project remains a marketed plan rather than a permitted development.

Key data: NOT_FOUND | ERCOT | Green Valley Special Utility District | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Legacy Investing Data Center - 1000 Bolton Road: ownership and profile

planned

Developer: Legacy Investing | Owner: Legacy Investing | County: Guadalupe | Research region: San Antonio

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Legacy Investing Data Center - 1000 Bolton Road: power and grid

planned

Key data: Utility region: Guadalupe County; outside CPS Energy municipal territory | Grid area: ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Legacy Investing Data Center - 1000 Bolton Road: water and cooling

planned

Key data: Water utility: Green Valley Special Utility District | Cooling: direct-to-chip closed chilled water

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Legacy Investing Data Center - 1000 Bolton Road: permits and jurisdiction

planned

Key data: Jurisdictions: Guadalupe County | City of Cibolo / Marion area jurisdiction (extent not confirmed) | State of Texas | ERCOT | Green Valley SUD

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Legacy Investing Data Center - 1000 Bolton Road: environment and site

planned

Key data: Surrounding infrastructure: Redevelopment of the former San Antonio Karting Complex site

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Legacy Investing Data Center - 1000 Bolton Road: timeline

planned

Project announced for the former San Antonio Karting Complex site at 1000 Bolton Road

Claim classification: Not yet assigned

Status date: 2026-06

Open source 1 →

planned

Target delivery stated as the fourth quarter of 2027

Claim classification: Not yet assigned

Open source 1 →

STREET ADDRESS

Legacy Investing Data Center - 1000 Bolton Road: street address

planned

Directory and broker listings place the project at the former karting complex site.

Key data: 1000 Bolton Road, Marion/Cibolo, TX 78124

Claim classification: commercial_directory_listing · Verification: partially_verified · Retrieved: 2026-09-05

Status date: 2026-06

Limitation: Tier-3 directory; no permit record located.

Open source 1 →

CAPACITY IT LOAD

Legacy Investing Data Center - 1000 Bolton Road: capacity it load

planned

Listings describe an initial capacity with a stated expansion path.

Key data: 50 MW initial, expandable to 150 MW

Claim classification: commercial_directory_listing · Verification: partially_verified · Retrieved: 2026-09-05

Status date: 2026-06

Limitation: Marketing capacity; no interconnection evidence.

Open source 1 →

BUILDING SQFT

Legacy Investing Data Center - 1000 Bolton Road: building sqft

planned

Listings describe the building and data hall areas.

Key data: Approximately 243,000 sq ft with more than 100,000 sq ft of data hall

Claim classification: commercial_directory_listing · Verification: partially_verified · Retrieved: 2026-09-05

Status date: 2026-06

Open source 1 →

COOLING TECHNOLOGY

Legacy Investing Data Center - 1000 Bolton Road: cooling technology

planned

Project marketing describes the cooling design.

Key data: Direct-to-chip closed chilled water

Claim classification: commercial_directory_listing · Verification: partially_verified · Retrieved: 2026-09-05

Status date: 2026-06

Limitation: Water use volumes not disclosed.

Open source 1 →

WATER SUPPLIER

Legacy Investing Data Center - 1000 Bolton Road: water supplier

planned

Broker material identifies the water district serving the site.

Key data: Green Valley Special Utility District

Claim classification: broker_marketing_material · Verification: unverified · Retrieved: 2026-09-05

Status date: 2026-06

Limitation: Broker marketing; not confirmed with the utility district.

Open source 1 →

SURROUNDING INFRASTRUCTURE

Legacy Investing Data Center - 1000 Bolton Road: surrounding infrastructure

planned

Site is a redevelopment of a former motorsports facility.

Key data: Former San Antonio Karting Complex

Claim classification: broker_marketing_material · Verification: unverified · Retrieved: 2026-09-05

Status date: 2026-06

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Legacy Investing Data Center - 1000 Bolton Road Data Center Project | Marion / Cibolo | Compute Equity Atlas