under_construction
Developer BaRupOn is a medical equipment manufacturer that pivoted the site. 3GW is the stated ultimate on-campus capacity target; 240MW of generation is the near-term buildout. Behind-the-meter approach chosen because grid interconnection was quoted at 2029 with ~$35M in upgrade cost.
Key data: Behind-the-meter / off-grid on-site generation (grid interconnection deferred to 2029 with ~$35M in upgrade costs) | Off-grid / behind-the-meter | NOT_FOUND
Claim classification: Not yet assigned
Status date: 2026-09-05