MDC Data Centers Laredo LDO-1

This record consolidates 7 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
SOURCE_BACKEDbest evidence tier
7linked evidence rows
Project facts

Location and operating record

Operator / developerMDC Data Centers
JurisdictionLaredo, TX
Address13619 Cabezut Dr
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity0.65 MW
AliasesMDC Data Centers Laredo LDO-1 · LDO-1, Unitec Industrial Park · MDC Laredo · LDO1
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

MDC Data Centers Laredo LDO-1: source record

operational

650 kW of critical load; 1000 kVA standby generation stated by operator. Carrier-neutral colocation serving the Laredo border trade corridor.

Key data: NOT_FOUND | NOT_FOUND | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

MDC Data Centers Laredo LDO-1: ownership and profile

operational

Owner: MDC Data Centers | County: Webb | Research region: East Texas / South Texas-RGV / Statewide Rural Gap Pass

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

MDC Data Centers Laredo LDO-1: power and grid

operational

Key data: IT load MW: 0.65

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

MDC Data Centers Laredo LDO-1: water and cooling

operational

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

MDC Data Centers Laredo LDO-1: permits and jurisdiction

operational

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

STREET ADDRESS

MDC Data Centers Laredo LDO-1: street address

operational

MDC lists LDO-1 at 13619 Cabezut Drive in Laredo's Unitec Industrial Park.

Key data: 13619 Cabezut Dr, Laredo, TX 78045

Claim classification: operator_claim · Verification: single_source · Retrieved: 2026-09-05

Open source 1 →

CAPACITY IT LOAD

MDC Data Centers Laredo LDO-1: capacity it load

operational

The facility is listed with 650 kW of critical power and a 1000 kVA standby generator.

Key data: 650 kW critical load; 1000 kVA standby

Claim classification: operator_claim · Verification: single_source · Retrieved: 2026-09-05

Open source 1 →