under_construction
Microsoft's ~2 GW figure describes added global capacity, not a stated Pecos site load, so gross_mw is left null rather than inferred. Power is supplied by the separately recorded Energy Forge One / Project Kilby generation project.
Key data: Co-located natural gas plant behind the meter at launch, with plans for eventual grid connection | Behind-the-meter at launch; ERCOT connection planned
Claim classification: Not yet assigned
Status date: 2026-09-05