Microsoft Pecos Datacenter Campus

This record consolidates 3 research observations while retaining source distinctions, location precision and unresolved fields.

under_constructionproject status
VERIFIED_PRIMARYbest evidence tier
3linked evidence rows
Project facts

Location and operating record

Operator / developerMicrosoft Corporation
JurisdictionPecos, TX
AddressNot published
Location precisionlocality
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesMicrosoft Pecos Datacenter Campus · Pecos
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Microsoft Pecos Datacenter Campus: source record

under_construction

Microsoft's ~2 GW figure describes added global capacity, not a stated Pecos site load, so gross_mw is left null rather than inferred. Power is supplied by the separately recorded Energy Forge One / Project Kilby generation project.

Key data: Co-located natural gas plant behind the meter at launch, with plans for eventual grid connection | Behind-the-meter at launch; ERCOT connection planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1

Sources

Evidence and provenance

Open TX state research →

Microsoft Pecos Datacenter Campus Data Center Project | Pecos | Compute Equity Atlas