Microsoft Pecos Datacenter Campus

This record consolidates 18 research observations while retaining source distinctions, location precision and unresolved fields.

under_constructionproject status
VERIFIED_PRIMARYbest evidence tier
18linked evidence rows
Project facts

Location and operating record

Operator / developerMicrosoft Corporation
JurisdictionPecos, TX
AddressNot published
Location precisionlocality
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesMicrosoft Pecos Datacenter Campus · Pecos · Microsoft Pecos
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure1 rows
SOURCE RECORD

Microsoft Pecos Datacenter Campus: source record

under_construction

Microsoft's ~2 GW figure describes added global capacity, not a stated Pecos site load, so gross_mw is left null rather than inferred. Power is supplied by the separately recorded Energy Forge One / Project Kilby generation project.

Key data: Co-located natural gas plant behind the meter at launch, with plans for eventual grid connection | Behind-the-meter at launch; ERCOT connection planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Microsoft Pecos Datacenter Campus: ownership and profile

under_construction

Developer: Microsoft Corporation | Owner: Microsoft Corporation | County: Reeves | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin | Tenants/customers: Microsoft (Azure / Microsoft AI)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Microsoft Pecos Datacenter Campus: power and grid

under_construction

Key data: Utility: Co-located natural gas plant behind the meter at launch, with plans for eventual grid connection | Utility region: ERCOT West | Grid area: Behind-the-meter at launch; ERCOT connection planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Microsoft Pecos Datacenter Campus: water and cooling

under_construction

Key data: Water source: Nonpotable water with closed-loop cooling | Water demand: Closed-loop cooling using nonpotable water | Cooling: Closed-loop cooling

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Microsoft Pecos Datacenter Campus: permits and jurisdiction

under_construction

Key data: Jurisdictions: Reeves County | City of Pecos | TCEQ | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Microsoft Pecos Datacenter Campus: civic and community

under_construction

More than 6,000 peak construction jobs and hundreds of permanent jobs claimed

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Microsoft Pecos Datacenter Campus: environment and site

under_construction

Co-located natural gas generation with selective catalytic reduction NOx controls

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Closed-loop cooling on nonpotable water

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Microsoft states it has contracted 4.7 GW of renewables in Texas

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Key data: Surrounding infrastructure: Permian Basin natural gas supply

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Key data: Surrounding infrastructure: Waha hub area gas infrastructure

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Microsoft Pecos Datacenter Campus: timeline

under_construction

Microsoft announces a new Pecos datacenter adding roughly 2 GW of global capacity, a multibillion-dollar investment over 5-7 years, with a co-located natural gas plant behind the meter at launch

Claim classification: Not yet assigned

Status date: 2026-06-22

Open source 1 →

under_construction

Reporting identifies Chevron subsidiary Energy Forge One as Microsoft's 20-year power supplier under 'Project Kilby'

Claim classification: Not yet assigned

Status date: 2026-06-23

Open source 1 →

PROJECT COST

Microsoft Pecos Datacenter Campus: project cost

under_construction

Microsoft announced a new datacenter in Pecos adding roughly 2 GW of capacity to its global fleet, representing a multibillion-dollar investment over five to seven years.

Key data: ~2 GW added global capacity; multibillion over 5-7 years

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-22

Limitation: The ~2 GW figure describes added global capacity, not a stated Pecos site load.

Open source 1 →

JOBS

Microsoft Pecos Datacenter Campus: jobs

under_construction

Microsoft projects more than 6,000 construction jobs at peak and hundreds of permanent positions at the Pecos campus.

Key data: >6,000 peak construction jobs; hundreds permanent

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-22

Open source 1 →

ONSITE GENERATION

Microsoft Pecos Datacenter Campus: onsite generation

under_construction

The Pecos campus launches with a co-located natural gas plant operating behind the meter, using selective catalytic reduction for NOx control, with plans to eventually connect to the grid.

Key data: Co-located gas plant behind the meter at launch; SCR NOx controls

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-22

Open source 1 →

WATER DEMAND

Microsoft Pecos Datacenter Campus: water demand

under_construction

Microsoft states the Pecos datacenter uses closed-loop cooling on nonpotable water, and that the company has contracted 4.7 GW of renewables in Texas.

Key data: Closed-loop cooling on nonpotable water; 4.7 GW Texas renewables contracted

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-22

Open source 1 →

POWER SUPPLIER

Microsoft Pecos Datacenter Campus: power supplier

approved

Trade reporting identifies Chevron subsidiary Energy Forge One as Microsoft's power supplier under a 20-year PPA for roughly 2.67 GW of co-located generation, referred to as Project Kilby, with first power expected in 2028 and FID expected later in 2026.

Key data: Energy Forge One 20-year PPA; ~2.67 GW; first power 2028

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-23

Open source 1 →