Compute Equity Atlas
← National map
Source-backed project record · TX

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus)

This record consolidates 17 research observations while retaining source distinctions, location precision and unresolved fields.

under_constructionproject status
CORROBORATEDbest evidence tier
17linked evidence rows
Project facts

Location and operating record

Operator / developerNOT_FOUND
JurisdictionHubbard, TX
Address357 HCR 3372 (also reported as 880 State Highway 171)
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity612 MW
AliasesNexus Apex DFW HB1 (Nexus Data Centers Hubbard campus) · Nexus Hubbard behind-the-meter energy and data center campus · Nexus Data Centers · Nexus Apex DFW HB1 · Hubbard data center campus
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): source record

under_construction

Rural gap find in Hill County. Capacity reported as 600 MW in the TDLR-derived filing and 612 MW in other tracking; both figures retained (gross_mw set to 612). Anthropic appears as the occupant on the Texas Comptroller registration, which corroborates trade reporting. | Likely duplicate of TX-0044 (Nexus Hubbard Data Center Campus, Hill County) discovered independently during the statewide rural gap pass; both records retained per dedup rules with possible_duplicate_of set rather than merged.

Key data: NOT_FOUND (behind-the-meter, natural gas fired on-site generation) | Behind-the-meter campus; ERCOT region | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1

OWNERSHIP AND PROFILE

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): ownership and profile

under_construction

Developer: Nexus Data Centers | Owner: Nexus Apex Holdings, LLC; Texas Comptroller list shows multiple 'Nexus Hubbard' LLC registrations | Property entity: Nexus Apex Holdings, LLC | Permit applicant: Nexus Data Centers (TDLR filing) | County: Hill | Research region: East Texas / South Texas-RGV / Statewide Rural Gap Pass | Tenants/customers: Anthropic, PBC (occupant on Comptroller registration; reported end user) | Google reported as financial backer

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1

POWER AND GRID

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): power and grid

under_construction

Key data: Utility: NOT_FOUND (behind-the-meter, natural gas fired on-site generation) | Grid area: Behind-the-meter campus; ERCOT region | Gross MW: 612 | Requested load MW: 612

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1

WATER AND COOLING

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): water and cooling

under_construction

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1

PERMITS AND JURISDICTION

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): permits and jurisdiction

under_construction

Key data: Jurisdictions: Hill County | Texas Department of Licensing and Regulation | Texas Comptroller | Tax incentives: {"agreement_name":"Texas Comptroller qualifying large data center registrations - Nexus Data Centers (multiple Nexus Hubbard LLCs; occupant Anthropic, PBC)","agreement_number":"NOT_FOUND","approval_date":"2025-07-21 (effective date)","estimated_value":"NOT_FOUND","government_entity":"Texas Comptroller of Public Accounts","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php","term":"NOT_FOUND"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1

ENVIRONMENT AND SITE

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): environment and site

under_construction

Key data: Surrounding infrastructure: Behind-the-meter natural gas generation on a 2,900-acre energy campus

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1

TIMELINE

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): timeline

under_construction

Comptroller data center exemption effective for Nexus Data Centers registrations (occupant Anthropic, PBC)

Claim classification: Not yet assigned

Status date: 2025-07-21

Open source 1

under_construction

Senior secured credit financings from Eagle Point Credit Management LLC secured for Nexus Apex Holdings, LLC

Claim classification: Not yet assigned

Status date: 2026-03

Open source 1

under_construction

TDLR filing reported: $400M, 491,380 sq ft, 600 MW, 2,900 acres, construction January 2026 to October 2027

Claim classification: Not yet assigned

Status date: 2026-06-24

Open source 1

under_construction

Reported advanced talks to secure about $15 billion for the Google-backed Anthropic data center

Claim classification: Not yet assigned

Status date: 2026-07-30

Open source 1

STREET ADDRESS

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): street address

planned

Nexus Data Centers filed to develop Nexus Apex DFW HB1 at 357 HCR 3372, Hubbard, on a 2,900-acre site.

Key data: 357 HCR 3372, Hubbard; 2,900 acres

Claim classification: reported_fact · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-06-24

Limitation: Underlying TDLR project number not published.

Open source 1

CAPACITY GROSS POWER

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): capacity gross power

planned

The project is described as 600 MW, 491,380 sq ft, and $400 million, with construction from January 2026 to October 2027.

Key data: 600 MW; 491,380 sq ft; $400M

Claim classification: reported_fact · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-06-24

Limitation: Cited MW figure conflicts with the 612 MW figure reported elsewhere.

Open source 1

ONSITE GENERATION

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): onsite generation

planned

The campus is structured as a natural gas-fired behind-the-meter energy campus generating its own power rather than drawing exclusively from the grid.

Key data: Behind-the-meter natural gas generation

Claim classification: reported_fact · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-06-24

Limitation: Generation capacity in MW not stated.

Open source 1

OWNERSHIP CHAIN

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): ownership chain

planned

Nexus Apex Holdings, LLC is the named corporate entity and secured two senior secured credit facilities from Eagle Point Credit Management LLC in March 2026 for the 2,900-acre campus.

Key data: Nexus Apex Holdings, LLC; Eagle Point Credit financing

Claim classification: reported_fact · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-03

Limitation: Financing amounts not disclosed.

Open source 1

TENANT CUSTOMER

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): tenant customer

planned

The facility is reported to serve Anthropic, with Google reportedly providing financial backing that the parties have not formally confirmed.

Key data: Tenant Anthropic; Google backing reported

Claim classification: unconfirmed_report · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-06-24

Limitation: Not confirmed by Anthropic or Google.

Open source 1

TAX INCENTIVES

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): tax incentives

planned

The Texas Comptroller's qualifying large data center list registers 'Nexus Data Centers' effective July 21, 2025, with multiple Nexus Hubbard LLC owner entities and Anthropic, PBC as occupant.

Key data: Comptroller registration eff. 2025-07-21; occupant Anthropic, PBC

Claim classification: official_record · Verification: primary_source · Retrieved: 2026-09-05

Status date: 2025-07-21

Limitation: Confirms the tenant relationship the trade press reported as unconfirmed.

Open source 1

PUBLIC FINANCE IMPACT

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus): public finance impact

planned

Morgan Stanley was reported in advanced talks to lend $15 billion to Nexus Data Centers to build out the Hubbard, Texas campus serving Anthropic.

Key data: $15B financing talks led by Morgan Stanley

Claim classification: unconfirmed_report · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-07-30

Limitation: Financing was not closed at publication.

Open source 1

Sources

Evidence and provenance

Open TX state research →

Nexus Apex DFW HB1 (Nexus Data Centers Hubbard campus) Data Center Project | Hubbard | Compute Equity Atlas