This record consolidates 13 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
SOURCE_BACKEDbest evidence tier
13linked evidence rows
Project facts

Location and operating record

Operator / developerONMINE
JurisdictionKilleen, TX
Address6509 South Fort Hood Street
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesONMINE Killeen Data Center · 6509 South Fort Hood Street site · ONMINE data center Killeen · Case Z26-07
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure1 rows
SOURCE RECORD

ONMINE Killeen Data Center: source record

planned

Small urban infill data center. No MW, square footage, utility, water or cooling details were located. Docket aggregator sources the underlying Killeen zoning case; the city agenda packet itself was not retrieved.

Key data: NOT_FOUND | ERCOT | NOT_FOUND | Z26-07 (conditional use permit; existing zoning UD)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

ONMINE Killeen Data Center: ownership and profile

planned

Developer: ONMINE | Owner: 4 Lazy J Properties, LLC (property owner of record) | Permit applicant: Belton Engineering, Inc., on behalf of 4 Lazy J Properties, LLC | County: Bell | Research region: Temple-Killeen-Waco / Bryan-College Station / Texoma | Parcel IDs: ~2.615 acres out of the M.T. Martin Survey, Abstract No. 963

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

ONMINE Killeen Data Center: power and grid

planned

Key data: Grid area: ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

ONMINE Killeen Data Center: water and cooling

planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

ONMINE Killeen Data Center: permits and jurisdiction

planned

Key data: Zoning case: Z26-07 (conditional use permit; existing zoning UD) | Jurisdictions: State of Texas | Bell County | City of Killeen | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

ONMINE Killeen Data Center: civic and community

planned

P&Z rejected the recommendation despite a favorable staff report, reflecting local opposition

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

ONMINE Killeen Data Center: timeline

planned

Conditional use permit application filed (Case Z26-07) for a data center on ~2.615 acres

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →

planned

Killeen Planning & Zoning Commission votes against recommending approval despite staff recommendation of approval

Claim classification: Not yet assigned

Status date: 2026-04-27

Open source 1 →

planned

No City Council action recorded as of late August 2026

Claim classification: Not yet assigned

Status date: 2026-08-29

Open source 1 →

ZONING LAND USE

ONMINE Killeen Data Center: zoning land use

planned

Zoning case Z26-07 sought a conditional use permit for a data center on ~2.615 acres at 6509 South Fort Hood Street; the P&Z Commission voted against it on 2026-04-27 despite a staff recommendation for approval.

Key data: Case Z26-07; P&Z denied recommendation 2026-04-27

Claim classification: REPORTED_FACT · Verification: SINGLE_SECONDARY_SOURCE · Retrieved: 2026-09-05

Status date: 2026-04-27

Limitation: Aggregator summary of the city case; original agenda packet not retrieved.

Open source 1 →

OWNERSHIP CHAIN

ONMINE Killeen Data Center: ownership chain

planned

Belton Engineering, Inc. filed on behalf of property owner 4 Lazy J Properties, LLC, with ONMINE named as the data center operator.

Key data: Applicant Belton Engineering; owner 4 Lazy J Properties, LLC; operator ONMINE

Claim classification: REPORTED_FACT · Verification: SINGLE_SECONDARY_SOURCE · Retrieved: 2026-09-05

Status date: 2026-04-27

Open source 1 →

PROJECT COST

ONMINE Killeen Data Center: project cost

planned

The project is described as a $30 million data center investment.

Key data: $30,000,000

Claim classification: REPORTED_FACT · Verification: SINGLE_SECONDARY_SOURCE · Retrieved: 2026-09-05

Status date: 2026-04-27

Open source 1 →

EXACT LOCATION

ONMINE Killeen Data Center: exact location

proposed

The Killeen conditional use permit case covers roughly 2.615 acres out of the M.T. Martin Survey, Abstract No. 963, at 6509 South Fort Hood Street in the UD zoning district, with Belton Engineering, Inc. applying on behalf of 4 Lazy J Properties, LLC.

Key data: 6509 South Fort Hood Street; ~2.615 acres; Case Z26-07

Claim classification: REPORTED_FACT · Verification: SINGLE_SOURCE_DOCKET_TRACKER · Retrieved: 2026-09-05

Status date: 2026-04-27

Limitation: Case details read from a docket-tracking site rather than the City of Killeen agenda packet itself.