Source-backed project record · TX

Pacifico / BCG Cedar Creek Campus

This record consolidates 21 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
CORROBORATEDbest evidence tier
21linked evidence rows
Project facts

Location and operating record

Operator / developerNOT_FOUND
JurisdictionCedar Creek, TX
Address382 Earl Callahan Road
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity490 MW
AliasesPacifico / BCG Cedar Creek Campus · Cedar Creek Campus, 382 Earl Callahan Road · BCG Cedar Creek Campus · Pacifico Cedar Creek LLC · Pacifico Energy Cedar Creek · Earl Callahan Road campus
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure3 rows
SOURCE RECORD

Pacifico / BCG Cedar Creek Campus: source record

planned

A rare case where a developer voluntarily withdrew both county Chapter 312 abatements and its state JETI application, choosing to pay full property taxes (~$20M/year). Two distinct developer identities appear on filings: Pacifico Energy / Pacifico Cedar Creek LLC on the incentive applications and Black Chamber Partners (BlackChamber Group affiliate) on the TCEQ stormwater permits for a 304-acre portion — treated here as one campus with a shared address, flagged for further ownership verification.

Key data: On-site natural gas generation (710 MW) supporting ~490 MW of data center load | ERCOT South Central / Austin-Central Texas load zone | Aqua Texas (developer to fund a new water line) | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Pacifico / BCG Cedar Creek Campus: ownership and profile

planned

Developer: Pacifico Energy (Pacifico Cedar Creek LLC); Black Chamber Partners, an affiliate of BlackChamber Group | Property entity: Pacifico Cedar Creek LLC | Permit applicant: Pacifico Cedar Creek LLC (Comptroller JETI application; Bastrop County Chapter 312 applications, both withdrawn); Black Chamber Partners (TCEQ construction stormwater permits as 'BCG Cedar Creek Campus') | County: Bastrop | Research region: Austin / Central Texas | Tenants/customers: Not disclosed

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Pacifico / BCG Cedar Creek Campus: power and grid

planned

Key data: Utility: On-site natural gas generation (710 MW) supporting ~490 MW of data center load | Utility region: ERCOT | Grid area: ERCOT South Central / Austin-Central Texas load zone | Gross MW: 490 | Requested load MW: 490 | Onsite generation MW: 710

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Pacifico / BCG Cedar Creek Campus: water and cooling

planned

Key data: Water utility: Aqua Texas (developer to fund a new water line) | Water source: Aqua Texas | Cooling: Closed-loop cooling

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Pacifico / BCG Cedar Creek Campus: permits and jurisdiction

planned

Key data: Permit IDs: Two Bastrop County Chapter 312 abatement applications received June 18 (withdrawn),Comptroller JETI application filed June 24 for a 10-year Bastrop ISD agreement covering 2029-2038 (withdrawn),Two mass-grading permit applications,TCEQ construction stormwater permits filed mid-July on a 304-acre portion as 'BCG Cedar Creek Campus' | Two Bastrop County Chapter 312 abatement applications received June 18 (withdrawn) | Comptroller JETI application filed June 24 for a 10-year Bastrop ISD agreement covering 2029-2038 (withdrawn) | Two mass-grading permit applications | TCEQ construction stormwater permits filed mid-July on a 304-acre portion as 'BCG Cedar Creek Campus' | Jurisdictions: Bastrop County | Bastrop ISD (JETI) | TCEQ | Texas Comptroller | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Pacifico / BCG Cedar Creek Campus: civic and community

planned

Bastrop County residents formally challenged the TCEQ stormwater permits; county officials tabled a request for more regulatory authority

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Developer dropped all tax-break requests amid opposition and committed to paying ~$20M/year in property taxes

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Roughly 2,200 of the 2,842 acres are to be left undeveloped

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Pacifico / BCG Cedar Creek Campus: environment and site

planned

Closed-loop cooling committed by the developer

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Developer to fund a new Aqua Texas water line

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

710 MW of on-site gas generation raises air-quality and emissions questions subject to TCEQ permitting

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Pacifico / BCG Cedar Creek Campus: timeline

planned

Two Chapter 312 abatement applications received by Bastrop County

Claim classification: Not yet assigned

Status date: 2026-06-18

Open source 1 →

planned

Pacifico Cedar Creek LLC files a JETI application with the Comptroller for a 10-year Bastrop ISD agreement (2029-2038) covering ~$2.24B in a gas power facility, 710 MW of generation supporting ~490 MW of data center load; alternative site listed as Muhlenberg Township, Ohio

Claim classification: Not yet assigned

Status date: 2026-06-24

Open source 1 →

planned

TCEQ construction stormwater permits filed on a 304-acre portion under the name 'BCG Cedar Creek Campus', headed by Black Chamber Partners; neighbors challenge the permits

Claim classification: Not yet assigned

Status date: 2026-07-15

Open source 1 →

planned

Developer withdraws both Chapter 312 applications and the JETI application, stating it will instead pay roughly $20M per year in property taxes

Claim classification: Not yet assigned

Status date: 2026-08-01

Open source 1 →

TAX INCENTIVES

Pacifico / BCG Cedar Creek Campus: tax incentives

applications filed

Pacifico Cedar Creek LLC filed a JETI application with the Comptroller on June 24 seeking a 10-year Bastrop ISD agreement for 2029-2038 covering roughly $2.24 billion in a gas power facility, and Bastrop County received two Chapter 312 applications on June 18.

Key data: JETI: ~$2.24B gas power facility; Bastrop ISD 2029-2038

Claim classification: local_news_report · Verification: SOURCE_BACKED · Retrieved: 2026-09-05

Status date: 2026-06-24

Limitation: Applications were subsequently withdrawn.

Open source 1 →

ONSITE GENERATION

Pacifico / BCG Cedar Creek Campus: onsite generation

applications filed

The JETI filing describes 710 MW of on-site generation supporting roughly 490 MW of data center load, with an alternative site listed as Muhlenberg Township, Ohio (under a moratorium to February 2027).

Key data: 710 MW generation supporting ~490 MW data center load

Claim classification: local_news_report · Verification: SOURCE_BACKED · Retrieved: 2026-09-05

Status date: 2026-06-24

Limitation: The named alternative site is standard JETI competitive-siting framing.

Open source 1 →

TCEQ WATER PERMIT

Pacifico / BCG Cedar Creek Campus: tceq water permit

challenged

TCEQ construction stormwater permits were filed in mid-July on a 304-acre portion of the campus under the name 'BCG Cedar Creek Campus', headed by Black Chamber Partners, an affiliate of BlackChamber Group; neighbors formally challenged the permits while county officials tabled a request for more regulatory authority.

Key data: 304-acre TCEQ stormwater filing as 'BCG Cedar Creek Campus'

Claim classification: local_news_report · Verification: SOURCE_BACKED · Retrieved: 2026-09-05

Status date: 2026-07-15

Limitation: TCEQ permit numbers were not published in the report.

Open source 1 →

PUBLIC FINANCE IMPACT

Pacifico / BCG Cedar Creek Campus: public finance impact

withdrawn

The developer withdrew both Chapter 312 applications and the JETI application, stating it will instead pay roughly $20 million per year in property taxes — an unusual reversal in Texas data center incentive practice.

Key data: Withdrew all abatements; ~$20M/yr in property taxes

Claim classification: local_news_report · Verification: CORROBORATED · Retrieved: 2026-09-05

Status date: 2026-08-01

Limitation: None

Open source 1 →

EXACT LOCATION

Pacifico / BCG Cedar Creek Campus: exact location

planned

The Cedar Creek Campus spans 2,842 acres along Earl Callahan Road at 382 Earl Callahan Road, with roughly 2,200 acres to be left undeveloped.

Key data: 382 Earl Callahan Rd; 2,842 acres; ~2,200 acres undeveloped

Claim classification: local_news_report · Verification: SOURCE_BACKED · Retrieved: 2026-09-05

Status date: 2026-08-01

Limitation: None

Open source 1 →

WATER SUPPLIER

Pacifico / BCG Cedar Creek Campus: water supplier

committed

The developer committed to closed-loop cooling and to funding a new Aqua Texas water line to serve the campus.

Key data: Closed-loop cooling; developer-funded Aqua Texas water line

Claim classification: local_news_report · Verification: SOURCE_BACKED · Retrieved: 2026-09-05

Status date: 2026-08-01

Limitation: No gallons-per-day figure disclosed.