Pacifico Energy FM 67 site (Blum)

This record consolidates 6 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
DISCOVERY_LEADbest evidence tier
6linked evidence rows
Project facts

Location and operating record

Operator / developerNOT_FOUND
JurisdictionBlum, TX
AddressFM 67 near Blum
Location precisionlocality centroid
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesPacifico Energy FM 67 site (Blum) · FM 67 site near Blum
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Pacifico Energy FM 67 site (Blum): source record

announced

Discovery lead only. The tracker describes Pacifico Energy buying land along FM 67 near Blum; no project scope, capacity or filings were located. The same tracker also lists unconfirmed rumors of projects at Peoria/Hillsboro and Malone/Pelham, which are recorded as evidence rather than facility records.

Key data: NOT_FOUND | ERCOT | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Pacifico Energy FM 67 site (Blum): ownership and profile

announced

Developer: Pacifico Energy | County: Hill | Research region: Temple-Killeen-Waco / Bryan-College Station / Texoma

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Pacifico Energy FM 67 site (Blum): power and grid

announced

Key data: Grid area: ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Pacifico Energy FM 67 site (Blum): water and cooling

announced

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Pacifico Energy FM 67 site (Blum): permits and jurisdiction

announced

Key data: Jurisdictions: State of Texas | Hill County | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Pacifico Energy FM 67 site (Blum): timeline

announced

Listed as land acquisition in progress by Pacifico Energy on an advocacy tracking page

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Pacifico Energy FM 67 site (Blum) Data Center Project | Blum | Compute Equity Atlas