planned
Power-first campus with on-site natural gas generation and no disclosed grid interconnection. Cooling source (reclaimed water) and water provider (County Line SUD) are explicitly flagged unverified by the tracker.
Key data: On-site natural gas generation; no grid connection disclosed | ERCOT South Central / Austin-Central Texas load zone | County Line Special Utility District (unverified) | NOT_FOUND
Claim classification: Not yet assigned
Status date: 2026-09-05