Compute Equity Atlas
← National map
Source-backed project record · TX

Project Big Pine

This record consolidates 24 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
CORROBORATEDbest evidence tier
24linked evidence rows
Project facts

Location and operating record

Operator / developerNOT_FOUND (seeking hyperscale/AI-HPC/neocloud anchor offtaker)
JurisdictionNew Boston (TexAmericas Center, Texarkana region), TX
AddressNOT_FOUND
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
Capacity800 MW
AliasesProject Big Pine · TexAmericas Center behind-the-meter industrial park, New Boston · Big Pine · TexAmericas Center data center campus
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure1 rows
SOURCE RECORD

Project Big Pine: source record

planned

Notable as a non-ERCOT (SPP/SWEPCO) Texas data center site. Initial power via islanded on-site generation; energization targeted 20-30 months after an anchor offtaker signs. Partners cited: Schneider Electric, JLL, Submer, Quanta, Solvenz. Scott Norton is TexAmericas Center CEO.

Key data: Southwestern Electric Power Company (SWEPCO), an AEP subsidiary | Southwest Power Pool (SPP) - outside ERCOT | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Project Big Pine: ownership and profile

planned

Developer: Potentia Development LLC (The Woodlands, TX; CEO Carl Quesinberry) | Owner: TexAmericas Center (site); Potentia Development holds site control | County: Bowie | Research region: East Texas / South Texas-RGV / Statewide Rural Gap Pass

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Project Big Pine: power and grid

planned

Key data: Utility: Southwestern Electric Power Company (SWEPCO), an AEP subsidiary | Utility region: AEP-SWEPCO | Grid area: Southwest Power Pool (SPP) - outside ERCOT | Gross MW: 800 | Requested load MW: 800 | Transmission: Adjacent 345 kV transmission line with headroom identified in AEP-SWEPCO screening

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Project Big Pine: water and cooling

planned

Key data: Water source: Access to existing regional water infrastructure (stated, unquantified)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Project Big Pine: permits and jurisdiction

planned

Key data: Jurisdictions: TexAmericas Center (single permitting authority, heavy-industrial zoning) | Bowie County | Foreign Trade Zone No. 258 | Opportunity Zone | Southwest Power Pool study process | Tax incentives: [object Object] | {"agreement_name":"Texas large data center sales-and-use tax exemption (eligibility cited by developer)","agreement_number":"NOT_FOUND","approval_date":"NOT_FOUND","estimated_value":"NOT_FOUND","government_entity":"State of Texas","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://www.einpresswire.com/article/934804903/potentia-development-brings-project-big-pine-to-market-with-a-btm-first-strategy-bounded-risk-buy-right-development","term":"NOT_FOUND"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Project Big Pine: civic and community

planned

One of two large Bowie County data center projects drawing organized opposition per local reporting

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Project Big Pine: environment and site

planned

Key data: Surrounding infrastructure: Multiple fiber carrier routes

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Interstate natural gas pipeline delivery concepts (multi-gigawatt)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: 345 kV line adjacent

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Battery storage planned with BTM generation

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Project Big Pine: timeline

planned

TexAmericas Center announces advancement of Project Big Pine, ~500-acre data center campus

Claim classification: Not yet assigned

Status date: 2026-04-28

Open source 1 →

planned

Potentia Development brings Project Big Pine to market with behind-the-meter-first strategy

Claim classification: Not yet assigned

Status date: 2026-08-17

Open source 1 →

planned

Coverage confirms 450-acre BTM site, 800 MW phased utility path via SWEPCO

Claim classification: Not yet assigned

Status date: 2026-08-17

Open source 1 →

planned

Planned utility capacity phase: 300 MW

Claim classification: Not yet assigned

Status date: 2032-Q2

Open source 1 →

planned

Planned utility capacity phase: +200 MW

Claim classification: Not yet assigned

Status date: 2034-Q2

Open source 1 →

planned

Planned utility capacity phase: +300 MW

Claim classification: Not yet assigned

Status date: 2036-Q2

Open source 1 →

PROJECT COST

Project Big Pine: project cost

planned

Project Big Pine is a 500-acre data center campus announced by TexAmericas Center with $3.5 billion of investment at full buildout and about 120 permanent jobs.

Key data: $3.5B full buildout; ~120 permanent jobs; 500 acres

Claim classification: reported_fact · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2026-04-28

Limitation: Acreage later described as ~450 acres in developer materials.

Open source 1 →

DEVELOPER

Project Big Pine: developer

planned

Potentia Development, headquartered in The Woodlands, Texas, is the developer and holds site control; CEO Carl Quesinberry.

Key data: Potentia Development LLC; CEO Carl Quesinberry

Claim classification: reported_fact · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2026-08-17

Limitation: No anchor tenant identified.

Open source 1 →

POWER SUPPLIER

Project Big Pine: power supplier

planned

A permanent utility pathway is being pursued through AEP subsidiary SWEPCO, placing the site in the Southwest Power Pool rather than ERCOT.

Key data: SWEPCO / AEP; SPP footprint

Claim classification: reported_fact · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2026-08-17

Limitation: Subject to SPP study processes and definitive agreements.

Open source 1 →

INTERCONNECTION

Project Big Pine: interconnection

planned

Utility service is planned in phases of 300 MW in Q2 2032, 200 MW more by Q2 2034 and a further 300 MW in Q2 2036, for up to 800 MW.

Key data: 800 MW phased: 300/200/300 MW (2032/2034/2036)

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-08-17

Limitation: No queue position number published.

Open source 1 →

TRANSMISSION

Project Big Pine: transmission

planned

An AEP-SWEPCO screening identified transmission headroom on an adjacent 345 kV line.

Key data: Adjacent 345 kV line with headroom

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-08-17

Limitation: Screening study not public.

Open source 1 →

ONSITE GENERATION

Project Big Pine: onsite generation

planned

Initial power is planned through islanded on-site generation, with multi-gigawatt natural gas delivery concepts advanced with interstate pipeline operators; energization targeted 20 to 30 months after an anchor offtaker signs.

Key data: Islanded BTM generation; energization 20-30 months post-offtaker

Claim classification: developer_claim · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2026-08-17

Limitation: On-site generation capacity in MW not stated.

Open source 1 →

TAX INCENTIVES

Project Big Pine: tax incentives

planned

Marketing materials cite Foreign Trade Zone No. 258, Opportunity Zone status and the Texas large data center sales-and-use tax exemption, with TexAmericas Center as a single permitting authority under heavy-industrial zoning.

Key data: FTZ No. 258; Opportunity Zone; TX large DC exemption

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-08-17

Limitation: No executed abatement agreement located.

Open source 1 →

SURROUNDING INFRASTRUCTURE

Project Big Pine: surrounding infrastructure

planned

Site is described as having multiple fiber carrier routes and access to existing regional water infrastructure; partners include Schneider Electric, JLL, Submer, Quanta and Solvenz.

Key data: Multiple fiber routes; regional water access

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-08-17

Limitation: Water volumes not quantified.

Open source 1 →

Sources

Evidence and provenance

Open TX state research →