planned
POSSIBLE DUPLICATE: this 200 MW Terrell project may be the same campus reported as sited between Talty and Post Oak Bend. Source is a Tier-3 directory.
Key data: ERCOT
Claim classification: Not yet assigned
Status date: 2026-09-05
This record consolidates 10 research observations while retaining source distinctions, location precision and unresolved fields.
| Operator / developer | Prometheus Hyperscale |
|---|---|
| Jurisdiction | Terrell, TX |
| Address | 6998 Farm to Market 987 |
| Location precision | street address |
| Coordinates | Not published; no coordinate inferred |
| Capacity | Not established |
| Aliases | Prometheus TX-1 Terrell · TX-1 |
| Project profile | 0 rows |
|---|---|
| Intent / permits | 0 rows |
| Civic / infrastructure | 0 rows |
POSSIBLE DUPLICATE: this 200 MW Terrell project may be the same campus reported as sited between Talty and Post Oak Bend. Source is a Tier-3 directory.
Key data: ERCOT
Claim classification: Not yet assigned
Status date: 2026-09-05
Developer: Prometheus Hyperscale | County: Kaufman | Research region: Dallas-Fort Worth / North Texas
Claim classification: Not yet assigned
Status date: 2026-09-05
Key data: Grid area: ERCOT | Substations: Existing 200 MW grid-tied substation on site
Claim classification: Not yet assigned
Status date: 2026-09-05
Claim classification: Not yet assigned
Status date: 2026-09-05
Key data: Jurisdictions: City of Terrell | Kaufman County | ERCOT
Claim classification: Not yet assigned
Status date: 2026-09-05
Key data: Surrounding infrastructure: Zayo fiber approximately 8,000 ft away
Claim classification: Not yet assigned
Status date: 2026-09-05
Key data: Surrounding infrastructure: Lumen long-haul fiber to the Dallas internet exchange
Claim classification: Not yet assigned
Status date: 2026-09-05
A directory record lists Prometheus TX-1 at 6998 Farm to Market 987, Terrell, TX 75160 with 200 MW and an existing 200 MW grid-tied substation.
Key data: 6998 FM 987, Terrell TX 75160; 200 MW; existing substation
Claim classification: DIRECTORY_LISTING · Verification: SINGLE_SOURCE · Retrieved: 2026-09-05
Limitation: Tier-3 directory; may describe the same project reported by the Dallas Morning News as between Talty and Post Oak Bend.
The site is described as co-located with ENGIE renewable generation and battery storage, with Conduit supplying hybrid bridge power.
Key data: ENGIE renewables + BESS; Conduit bridge power
Claim classification: DIRECTORY_LISTING · Verification: SINGLE_SOURCE · Retrieved: 2026-09-05
Zayo fiber runs about 8,000 feet from the site and Lumen provides long-haul fiber to the Dallas internet exchange.
Key data: Zayo ~8,000 ft; Lumen long-haul to Dallas IX
Claim classification: DIRECTORY_LISTING · Verification: SINGLE_SOURCE · Retrieved: 2026-09-05