Source-backed project record · TX

Provident Hillsboro Data Center

This record consolidates 18 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
VERIFIED_PRIMARYbest evidence tier
18linked evidence rows
Project facts

Location and operating record

Operator / developerNOT_FOUND
JurisdictionHillsboro, TX
AddressNorth Hillsboro, near the former municipal airport (site marketed at 1000 Airport Blvd per third-party listings)
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesProvident Hillsboro Data Center · North Hillsboro EDC site (~300 acres) · Provident Data Centers Hillsboro campus · North Hillsboro data center
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure1 rows
SOURCE RECORD

Provident Hillsboro Data Center: source record

planned

The City of Hillsboro maintains an official project page, which is the primary source here. No MW, cost, jobs, utility or cooling details have been published. The site is inside the city, so the county's May 2026 moratorium on unincorporated-area projects did not apply to it.

Key data: NOT_FOUND | ERCOT | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Provident Hillsboro Data Center: ownership and profile

planned

Developer: Provident (Provident Realty Advisors; president Jay Hawes) | Owner: Hillsboro Economic Development Corporation (current landowner; land under contract to Provident) | Permit applicant: Provident (purchaser under contract with the Hillsboro EDC) | County: Hill | Research region: Temple-Killeen-Waco / Bryan-College Station / Texoma

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Provident Hillsboro Data Center: power and grid

planned

Key data: Grid area: ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Provident Hillsboro Data Center: water and cooling

planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Provident Hillsboro Data Center: permits and jurisdiction

planned

Key data: Jurisdictions: State of Texas | Hill County | City of Hillsboro | Hillsboro EDC | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Provident Hillsboro Data Center: civic and community

planned

A public meeting in April 2026 drew significant resident opposition to the land sale

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Provident Hillsboro Data Center: environment and site

planned

City engineers reviewing water and wastewater capacity for the proposed build-out

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Heavy industrial zoned EDC land in north Hillsboro near the former airport

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Hill County Judge Shane Brassell said he is aware of at least eight data center projects 'in the works' in the county

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Provident Hillsboro Data Center: timeline

planned

Site placed under contract with Provident

Claim classification: Not yet assigned

Status date: 2024-09

Open source 1 →

planned

Public meeting on 2026-04-24 draws opposition; EDC approves a four-month pre-sale extension

Claim classification: Not yet assigned

Status date: 2026-04-24

Open source 1 →

planned

Hill County commissioners approve a one-year data center moratorium in unincorporated areas (3-2)

Claim classification: Not yet assigned

Status date: 2026-05-12

Open source 1 →

planned

Contract runs through November 2026 with paid extensions; due diligence ongoing

Claim classification: Not yet assigned

Status date: 2026-11

Open source 1 →

DEVELOPER

Provident Hillsboro Data Center: developer

planned

The City of Hillsboro states it is considering a data center project developed by Provident on roughly 300 acres owned by the Hillsboro EDC, zoned heavy industrial and under contract since September 2024.

Key data: Developer Provident; ~300 acres of EDC land

Claim classification: REPORTED_FACT · Verification: VERIFIED_SINGLE_SOURCE · Retrieved: 2026-09-05

Status date: 2026-09-05

Open source 1 →

PROJECT TIMELINE

Provident Hillsboro Data Center: project timeline

planned

The purchase contract runs through November 2026 with paid extensions while the project remains in due diligence and city engineers review water and wastewater capacity.

Key data: Contract through Nov 2026; 12-building eventual build-out

Claim classification: REPORTED_FACT · Verification: VERIFIED_SINGLE_SOURCE · Retrieved: 2026-09-05

Status date: 2026-11

Open source 1 →

COMMUNITY RESPONSE

Provident Hillsboro Data Center: community response

planned

A public meeting on 2026-04-24 drew opposition to the proposed 300-acre sale, after which the EDC approved a four-month pre-sale extension.

Key data: April 2026 public meeting; 4-month extension

Claim classification: REPORTED_FACT · Verification: VERIFIED_SINGLE_SOURCE · Retrieved: 2026-09-05

Status date: 2026-04-24

Open source 1 →

ZONING LAND USE

Provident Hillsboro Data Center: zoning land use

proposed

The City of Hillsboro states the roughly 300-acre site belongs to the Hillsboro Economic Development Corporation, is zoned heavy industrial, and has been under contract with Provident since September 2024, with the contract running through November 2026 subject to paid extensions while the project remains in due diligence.

Key data: ~300 acres, heavy industrial zoning, contract through Nov 2026

Claim classification: REPORTED_FACT · Verification: VERIFIED_PRIMARY_CITY_PUBLICATION · Retrieved: 2026-09-05

Open source 1 →

PROJECT STATUS

Provident Hillsboro Data Center: project status

proposed

The city's project page describes an eventual build-out of 12 buildings, with city engineers reviewing water and wastewater capacity; no construction approval has been issued.

Key data: Eventual build-out of 12 buildings (city statement)

Claim classification: REPORTED_FACT · Verification: VERIFIED_PRIMARY_CITY_PUBLICATION · Retrieved: 2026-09-05

Limitation: Building count is a build-out concept, not a permitted plan; no megawatt figure is published by the city.

Open source 1 →