Evidence record
Operator confirms operating DC1 at Broderick. DC2 at Randolph is still labeled under construction even though the page also gives a Q2 2026 target; the elapsed target does not establish commissioning. One campus identity with DC1 as anchor.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-30
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.