Source-backed project record · TX

Rowan Digital Infrastructure Project Cinco

This record consolidates 16 research observations while retaining source distinctions, location precision and unresolved fields.

under_constructionproject status
CORROBORATEDbest evidence tier
16linked evidence rows
Project facts

Location and operating record

Operator / developerNOT_FOUND (build-to-suit for an unnamed technology customer)
JurisdictionLytle area, unincorporated Medina County, TX
AddressNOT_FOUND
Location precisionlocality centroid
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesRowan Digital Infrastructure Project Cinco · Project Cinco · Rowan Cinco · Rowan Medina
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure1 rows
SOURCE RECORD

Rowan Digital Infrastructure Project Cinco: source record

under_construction

Quinbrook-backed developer; the end customer is described only as a top-five US technology company and is not named in any source located this session. Serving utility is AEP Texas, confirming that the region's data center load is not exclusively on CPS Energy.

Key data: AEP Texas | ERCOT | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Rowan Digital Infrastructure Project Cinco: ownership and profile

under_construction

Developer: Rowan Digital Infrastructure | Owner: Rowan Digital Infrastructure | Property entity: Rowan Digital Infrastructure (Quinbrook Infrastructure Partners portfolio company) | County: Medina | Research region: San Antonio | Tenants/customers: Unnamed top-five United States technology company (identified only by category in developer and press materials)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Rowan Digital Infrastructure Project Cinco: power and grid

under_construction

Key data: Utility: AEP Texas | Utility region: AEP Texas service territory (not CPS Energy) | Grid area: ERCOT | Substations: On-site substations planned as part of the campus development

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Rowan Digital Infrastructure Project Cinco: water and cooling

under_construction

Key data: Water source: Developer commitment to offset 250% of the water the project consumes

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Rowan Digital Infrastructure Project Cinco: permits and jurisdiction

under_construction

Key data: Jurisdictions: Medina County | State of Texas | ERCOT | AEP Texas | Tax incentives: [object Object] | {"agreement_name":"Medina County tax abatement for Project Cinco","agreement_number":"NOT_FOUND","approval_date":"NOT_FOUND","estimated_value":"NOT_FOUND","government_entity":"Medina County","investment_commitment":"approximately $900,000,000","jobs_commitment":"approximately 40 permanent positions","source_url":"https://insider.govtech.com/texas/news/denver-company-building-900m-data-center-west-of-san-antonio","term":"NOT_FOUND"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Rowan Digital Infrastructure Project Cinco: civic and community

under_construction

Medina Stands Together, a local group, organised in response to data center development in the county

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Rowan Digital Infrastructure Project Cinco: environment and site

under_construction

Developer states a commitment to replenish 250% of project water consumption

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Rowan Digital Infrastructure Project Cinco: timeline

under_construction

Project Cinco publicly announced: approximately 440 acres, 300 MW, roughly $900 million investment north of Lytle

Claim classification: Not yet assigned

Status date: 2025-08-07

Open source 1 →

under_construction

Developer states the project is targeted to be operational in 2027

Claim classification: Not yet assigned

Open source 1 →

CAPACITY GROSS POWER

Rowan Digital Infrastructure Project Cinco: capacity gross power

under_construction

Developer and press describe the planned campus power capacity.

Key data: 300 MW

Claim classification: press_report_corroborating_developer_disclosure · Verification: verified · Retrieved: 2026-09-05

Status date: 2025-08-07

Limitation: No ERCOT interconnection record retrieved.

Open source 1 →

PROJECT COST

Rowan Digital Infrastructure Project Cinco: project cost

under_construction

Press reporting states the announced investment.

Key data: Approximately $900,000,000

Claim classification: press_report_of_announcement · Verification: verified · Retrieved: 2026-09-05

Status date: 2025-08-07

Limitation: Announced figure, not an audited commitment.

Open source 1 →

CAMPUS ACRES

Rowan Digital Infrastructure Project Cinco: campus acres

under_construction

Developer materials describe the site size and location relative to Lytle and I-35.

Key data: Approximately 440 acres north of I-35 near Lytle

Claim classification: developer_self_disclosure · Verification: partially_verified · Retrieved: 2026-09-05

Status date: 2025-08-07

Limitation: No parcel identifiers or survey boundary located.

Open source 1 →

POWER SUPPLIER

Rowan Digital Infrastructure Project Cinco: power supplier

under_construction

Project materials identify the serving electric utility.

Key data: AEP Texas

Claim classification: developer_self_disclosure · Verification: partially_verified · Retrieved: 2026-09-05

Status date: 2025-08-07

Limitation: Interconnection study status unknown.

Open source 1 →

JOBS

Rowan Digital Infrastructure Project Cinco: jobs

under_construction

Announcement describes construction and permanent employment.

Key data: Approximately 600 construction jobs; approximately 40 permanent positions

Claim classification: press_report_of_announcement · Verification: verified · Retrieved: 2026-09-05

Status date: 2025-08-07

Limitation: Jobs figures are projections.

Open source 1 →

WATER IMPACT

Rowan Digital Infrastructure Project Cinco: water impact

under_construction

Developer states a water replenishment commitment for the project.

Key data: Commitment to offset 250% of water consumed

Claim classification: developer_self_disclosure · Verification: partially_verified · Retrieved: 2026-09-05

Status date: 2025-08-07

Limitation: Mechanism, verification and baseline consumption not disclosed.

Open source 1 →

COMMUNITY RESPONSE

Rowan Digital Infrastructure Project Cinco: community response

under_construction

A local group organised in Medina County in response to data center development.

Key data: Medina Stands Together campaign

Claim classification: advocacy_group_self_publication · Verification: partially_verified · Retrieved: 2026-09-05

Status date: 2025-08-07

Limitation: Advocacy source; claims not independently verified.

Open source 1 →