Rowan Moriah Data Center

This record consolidates 15 research observations while retaining source distinctions, location precision and unresolved fields.

unknownproject status
CORROBORATEDbest evidence tier
15linked evidence rows
Project facts

Location and operating record

Operator / developerRowan Digital Infrastructure
JurisdictionTemple, TX
Address2810 Bob White Road
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesRowan Moriah Data Center · Moriah Data Center, Synergy Industrial Park · Moriah DC · Temple Green Data Center (Comptroller registry)
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Rowan Moriah Data Center: source record

decommissioned

Crypto-to-AI adjacent case: built for a bitcoin-mining-linked occupant (Rhodium Renewables), vacated in 2024, and now slated for warehouse conversion while its power infrastructure supports Rowan's new AI campus next door. Capacity was never publicly disclosed in fetched sources.

Key data: Oncor Electric Delivery | ERCOT | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Rowan Moriah Data Center: ownership and profile

decommissioned

Developer: Rowan Digital Infrastructure | Owner: Rowan Moriah LLC (Comptroller Owner/Operator codes DC362659-OW2 / -OP2) | Property entity: Rowan Moriah LLC | County: Bell | Research region: Temple-Killeen-Waco / Bryan-College Station / Texoma | Tenants/customers: Rhodium Renewables LLC (Comptroller-listed occupant DC362659-OC1; vacated the property in 2024)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Rowan Moriah Data Center: power and grid

decommissioned

Key data: Utility: Oncor Electric Delivery | Utility region: Oncor / ERCOT North-Central | Grid area: ERCOT | Substations: Existing Moriah substation/interconnection infrastructure now supports Rowan's adjacent Project Temple campus

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Rowan Moriah Data Center: water and cooling

decommissioned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Rowan Moriah Data Center: permits and jurisdiction

decommissioned

Key data: Jurisdictions: State of Texas | Bell County | City of Temple | ERCOT / Oncor service territory | Tax incentives: [object Object] | {"agreement_name":"Texas Qualifying Data Center registration 'Temple Green Data Center'","agreement_number":"DC362659-OW2 / DC362659-OP2 (Rowan Moriah LLC); DC362659-OC1 (Rhodium Renewables LLC)","approval_date":"2021-07-23 (effective date)","estimated_value":"NOT_FOUND","government_entity":"Texas Comptroller of Public Accounts","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php","term":"NOT_FOUND"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Rowan Moriah Data Center: environment and site

decommissioned

Key data: Surrounding infrastructure: Adjacent to Rowan's Project Temple campus at 1707/2351 Bob White Road

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Rowan Moriah Data Center: timeline

decommissioned

Project announced

Claim classification: Not yet assigned

Status date: 2021

Open source 1 →

decommissioned

Qualifying data center registration effective (Temple Green Data Center)

Claim classification: Not yet assigned

Status date: 2021-07-23

Open source 1 →

decommissioned

Facility completed

Claim classification: Not yet assigned

Status date: 2023

Open source 1 →

decommissioned

Tenant vacated the property

Claim classification: Not yet assigned

Status date: 2024

Open source 1 →

decommissioned

Rowan shifts plans to convert the building into a warehouse

Claim classification: Not yet assigned

Status date: 2024-2026

Open source 1 →

PROJECT STATUS

Rowan Moriah Data Center: project status

decommissioned

The Moriah data center was announced in 2021, completed in 2023, vacated by its tenant in 2024, and is being converted to a warehouse.

Key data: Completed 2023; tenant vacated 2024; warehouse conversion

Claim classification: REPORTED_FACT · Verification: VERIFIED_SINGLE_SOURCE · Retrieved: 2026-09-05

Status date: 2024

Open source 1 →

OWNERSHIP CHAIN

Rowan Moriah Data Center: ownership chain

decommissioned

The Comptroller qualifying data center list records 'Temple Green Data Center' with Rowan Moriah LLC as owner/operator and Rhodium Renewables LLC as occupant, effective 2021-07-23.

Key data: Rowan Moriah LLC / Rhodium Renewables LLC; DC362659

Claim classification: REPORTED_FACT · Verification: VERIFIED_SINGLE_SOURCE · Retrieved: 2026-09-05

Status date: 2021-07-23

Open source 1 →

STREET ADDRESS

Rowan Moriah Data Center: street address

decommissioned

Trade reporting places the Moriah facility at 2810 Bob White Road in Temple's Synergy Park, adjacent to the new Rowan campus.

Key data: 2810 Bob White Road, Temple

Claim classification: REPORTED_FACT · Verification: SINGLE_SECONDARY_SOURCE · Retrieved: 2026-09-05

Status date: 2026-09-05

Open source 1 →

INTERCONNECTION

Rowan Moriah Data Center: interconnection

decommissioned

Existing electrical infrastructure serving Moriah is why Rowan's adjacent 300 MW campus needs no new transmission or substation.

Key data: Moriah infrastructure reused for Project Temple

Claim classification: REPORTED_FACT · Verification: VERIFIED_SINGLE_SOURCE · Retrieved: 2026-09-05

Status date: 2026-01-05

Open source 1 →