Rowan Project Temple Data Center Campus

This record consolidates 21 research observations while retaining source distinctions, location precision and unresolved fields.

under_constructionproject status
VERIFIED_PRIMARYbest evidence tier
21linked evidence rows
Project facts

Location and operating record

Operator / developerRowan Digital Infrastructure
JurisdictionTemple, TX
Address1707 and 2351 Bob White Road (South Temple / Synergy Industrial Park)
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesRowan Project Temple Data Center Campus · Project Temple (Stampede, Ranger, Lasso buildings) · Project Temple · Rowan Temple campus · Temple Data Center (Comptroller registry)
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure2 rows
SOURCE RECORD

Rowan Project Temple Data Center Campus: source record

under_construction

Building count reporting is inconsistent: Rowan's January 2026 release and local coverage describe a 300 MW campus; KWTX reported in August 2026 that six buildings are contemplated with four under construction and five approved. Rowan has not named its customer; the Comptroller registry pairing of Rowan Temple LLC (owner/operator) with Polmer LLC (occupant) is the strongest public signal of tenancy.

Key data: Oncor Electric Delivery | ERCOT | City of Temple | Voluntary annexation from Temple ETJ plus site plan approvals; sixth-building case heard by P&Z 2026-08-17

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Rowan Project Temple Data Center Campus: ownership and profile

under_construction

Developer: Rowan Digital Infrastructure (portfolio company of Quinbrook Infrastructure Partners; formed 2021 with Birch Infrastructure) | Owner: Rowan Temple LLC (Comptroller Owner/Operator codes LD294727-OW1 / -OP2) | Property entity: Rowan Temple LLC | Permit applicant: Rowan Digital Infrastructure (City of Temple annexation, zoning and site plan applicant) | County: Bell | Research region: Temple-Killeen-Waco / Bryan-College Station / Texoma | Tenants/customers: Unnamed top-tier global technology company (long-term customer per Rowan) | Polmer LLC is listed as Occupant of the Comptroller 'Temple Data Center' large project (LD294727-OC1), which suggests a Meta-affiliated tenancy

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Rowan Project Temple Data Center Campus: power and grid

under_construction

Key data: Utility: Oncor Electric Delivery | Utility region: Oncor / ERCOT North-Central | Grid area: ERCOT | Substations: No new substation required; project uses existing infrastructure serving Rowan's adjacent Moriah facility | Transmission: No new transmission lines required per Rowan/City of Temple

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Rowan Project Temple Data Center Campus: water and cooling

under_construction

Key data: Water utility: City of Temple | Water demand: One-time cooling loop fill of ~1-2 million gallons; development agreement caps domestic water use at 4,000 gallons/day | Cooling: Closed-loop cooling; Rowan states no additional water needed below 84F

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Rowan Project Temple Data Center Campus: permits and jurisdiction

under_construction

Key data: Zoning case: Voluntary annexation from Temple ETJ plus site plan approvals; sixth-building case heard by P&Z 2026-08-17 | Jurisdictions: State of Texas | Bell County | City of Temple | ERCOT / Oncor service territory | Tax incentives: [object Object],[object Object] | {"agreement_name":"City of Temple tax abatement agreement for Rowan Project Temple","agreement_number":"NOT_FOUND","approval_date":"2025-10-31 (agreement signed)","estimated_value":"50% city property tax abatement for 10 years per phase","government_entity":"City of Temple","investment_commitment":"Minimum $700 million","jobs_commitment":"30 FT phase 1; +10 by end of 2029","source_url":"https://templetxhomes.net/data-center-impact/","term":"10 years per construction phase"} | {"agreement_name":"Texas Large Data Center Project registration 'Temple Data Center'","agreement_number":"LD294727-OW1 / LD294727-OP2 (Rowan Temple LLC)","approval_date":"2026-01-21","estimated_value":"NOT_FOUND","government_entity":"Texas Comptroller of Public Accounts","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php","term":"NOT_FOUND"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Rowan Project Temple Data Center Campus: civic and community

under_construction

Sixth building (Lasso) relocated on the site because the City of Temple wanted landfill expansion on Rowan's western land

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Residents and Bell County officials debating tax abatement policy for data centers during build-out

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Rowan Project Temple Data Center Campus: environment and site

under_construction

More than 85% of construction waste recycled (Rowan claim)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Closed-loop cooling with capped domestic water use

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Key data: Surrounding infrastructure: Adjacent to Rowan's earlier Moriah data center at 2810 Bob White Road

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Key data: Surrounding infrastructure: Synergy Industrial Park, South Temple

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Key data: Surrounding infrastructure: Near Robinson Family Farm

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Rowan Project Temple Data Center Campus: timeline

under_construction

Temple City Council unanimously approves project and voluntary annexation

Claim classification: Not yet assigned

Status date: 2025-09

Open source 1 →

under_construction

Tax abatement agreement signed with City of Temple

Claim classification: Not yet assigned

Status date: 2025-10-31

Open source 1 →

under_construction

Construction/site work begins

Claim classification: Not yet assigned

Status date: 2025-12 to 2026-01

Open source 1 →

under_construction

Rowan announces construction start on 300 MW campus, minimum $700M

Claim classification: Not yet assigned

Status date: 2026-01-05

Open source 1 →

under_construction

Official groundbreaking celebrated

Claim classification: Not yet assigned

Status date: 2026-03-02

Open source 1 →

under_construction

Rowan secures nearly $3B green financing for the campus (reported)

Claim classification: Not yet assigned

Status date: 2026-05-28

Open source 1 →

under_construction

Rowan seeks approval for sixth and final building (Lasso); P&Z hearing

Claim classification: Not yet assigned

Status date: 2026-08-17

Open source 1 →

under_construction

City Council action on sixth building expected

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1 →

under_construction

Substantial completion / operations target

Claim classification: Not yet assigned

Status date: 2027

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Rowan Project Temple Data Center Campus Data Center Project | Temple | Compute Equity Atlas