Compute Equity Atlas
← National map
Source-backed project record · TX

San Angelo Data Center Campus (Skybox / Emergent)

This record consolidates 26 research observations while retaining source distinctions, location precision and unresolved fields.

approved_or_permittedproject status
VERIFIED_PRIMARYbest evidence tier
26linked evidence rows
Project facts

Location and operating record

Operator / developerSkybox Datacenters
JurisdictionSan Angelo, TX
AddressNear the intersection of US-67 North and City Farm Road, northeast of San Angelo
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
Capacity250 MW
AliasesSan Angelo Data Center Campus (Skybox / Emergent) · San Angelo Data Center Campus · Skybox San Angelo · Emergent San Angelo campus
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure5 rows
SOURCE RECORD

San Angelo Data Center Campus (Skybox / Emergent): source record

approved

First phase reported at 100-250 MW; each building ~18-24 months to build. Building sq ft derived as 6 x 248,000 from DCD reporting. Emergent is described as Skybox's parent by the citizen coalition site (Tier-3 for that specific claim).

Key data: AEP Texas | ERCOT | City of San Angelo | Zone change from Ranch & Estate to Light Manufacturing with comprehensive plan amendment to Industrial (approved 6-1, 2026-01-13); 345.27 acres

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

San Angelo Data Center Campus (Skybox / Emergent): ownership and profile

approved

Developer: Skybox Datacenters (parent: Emergent) | Owner: City of San Angelo (land seller/lessor) | Property entity: San Angelo Data Center Campus Power, LLC / Data Center Campus Power, LLC (lease entity) | Permit applicant: Skybox Datacenters (zone change applicant) | County: Tom Green | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

San Angelo Data Center Campus (Skybox / Emergent): power and grid

approved

Key data: Utility: AEP Texas | Utility region: ERCOT West | Grid area: ERCOT | Gross MW: 250 | Requested load MW: 250 | Substations: AEP Texas Red Creek Substation (city currently uses roughly 10% of its capacity)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

San Angelo Data Center Campus (Skybox / Emergent): water and cooling

approved

Key data: Water utility: City of San Angelo | Wastewater: City of San Angelo; sewer/discharge ordinance adopted 5-1 on 2026-06-02

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

San Angelo Data Center Campus (Skybox / Emergent): permits and jurisdiction

approved

Key data: Zoning case: Zone change from Ranch & Estate to Light Manufacturing with comprehensive plan amendment to Industrial (approved 6-1, 2026-01-13); 345.27 acres | Jurisdictions: City of San Angelo | Tom Green County | AEP Texas | ERCOT | Tax incentives: [object Object] | {"agreement_name":"Chapter 380 economic development agreement (required; draft terms reported)","agreement_number":"NOT_FOUND","approval_date":"NOT_FOUND (draft as of mid-2026)","estimated_value":"Draft reported to include $11.7M in water-line extensions, $2.1M sewer extension, and city-paid roads and a deceleration lane","government_entity":"City of San Angelo","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://www.sanangelodccc.com/","term":"NOT_FOUND"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

San Angelo Data Center Campus (Skybox / Emergent): civic and community

approved

Site is ~3.6 miles from the PaulAnn residential area

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

55 dB noise limit imposed

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Councilman Patrick Keeley cast the dissenting rezoning vote

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Organized citizen coalition (sanangelodccc.com) opposing/scrutinizing the project

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Workforce partnerships announced with Howard College and Angelo State University

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

San Angelo Data Center Campus (Skybox / Emergent): environment and site

approved

Noise limit of 55 dB adopted

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

City adopted a sewer/discharge ordinance specific to data centers

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Key data: Surrounding infrastructure: AEP Texas Red Creek Substation adjacent

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Key data: Surrounding infrastructure: US-67 North corridor

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

San Angelo Data Center Campus (Skybox / Emergent): timeline

approved

San Angelo City Council approves rezoning 345.27 acres from Ranch & Estate to Light Manufacturing, 6-1

Claim classification: Not yet assigned

Status date: 2026-01-13

Open source 1 →

approved

Lease signed with San Angelo Data Center Campus Power, LLC covering 347 acres; no vested rights conveyed

Claim classification: Not yet assigned

Status date: 2026-03-30

Open source 1 →

approved

City Council approves data center land use regulations, 6-0

Claim classification: Not yet assigned

Status date: 2026-05-19

Open source 1 →

approved

City Council approves sewer/discharge ordinance, 5-1

Claim classification: Not yet assigned

Status date: 2026-06-02

Open source 1 →

approved

Reporting details six four-story buildings of 248,000 sq ft each on ~350 city-owned acres at $50,000/acre

Claim classification: Not yet assigned

Status date: 2026-07-09

Open source 1 →

ZONING LAND USE

San Angelo Data Center Campus (Skybox / Emergent): zoning land use

approved

The San Angelo City Council approved a zone change from Ranch & Estate to Light Manufacturing on 345.27 acres with a comprehensive plan amendment to Industrial, by a 6-1 vote, with Councilman Patrick Keeley dissenting.

Key data: 345.27 acres rezoned; 6-1 vote

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-01-13

Open source 1 →

SUBSTATION

San Angelo Data Center Campus (Skybox / Emergent): substation

approved

The City of San Angelo states the project sits on city-owned land northeast of the city near US-67 North and City Farm Road, adjacent to the AEP Texas Red Creek Substation, with a first phase of 100-250 MW.

Key data: Adjacent to AEP Texas Red Creek Substation; phase 1 100-250 MW

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-02

Open source 1 →

JOBS

San Angelo Data Center Campus (Skybox / Emergent): jobs

approved

The city projects 30-60 permanent jobs in year one growing to 120-200 at full buildout over ten years, at wages of $75,000-$110,000, with workforce partnerships involving Howard College and Angelo State University.

Key data: 30-60 jobs year 1 to 120-200 at buildout; $75k-$110k wages

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-02

Open source 1 →

BUILDING SQFT

San Angelo Data Center Campus (Skybox / Emergent): building sqft

approved

DatacenterDynamics reports six four-story buildings of 248,000 sq ft each on roughly 350 acres of city-owned land sold at $50,000 per acre for about $17.4 million, using spare Red Creek substation capacity the city currently taps at roughly 10%.

Key data: 6 buildings x 248,000 sq ft; ~350 acres at $50,000/acre (~$17.4M)

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-07-09

Open source 1 →

OWNERSHIP CHAIN

San Angelo Data Center Campus (Skybox / Emergent): ownership chain

approved

A local citizen coalition documents that Emergent is Skybox's parent and that the lease entity is San Angelo Data Center Campus Power, LLC (also referenced as Data Center Campus Power, LLC), with a lease signed 30 March 2026 covering 347 acres and conveying no vested rights.

Key data: Lease entity: San Angelo Data Center Campus Power, LLC; signed 2026-03-30; 347 acres

Claim classification: ADVOCACY_SOURCE · Verification: PARTIALLY_VERIFIED · Retrieved: 2026-09-05

Status date: 2026-03-30

Limitation: Advocacy group source; lease terms not independently confirmed against city records.

Open source 1 →

PUBLIC FINANCE IMPACT

San Angelo Data Center Campus (Skybox / Emergent): public finance impact

approved

The citizen coalition reports the draft Chapter 380 agreement would commit the city to $11.7 million in water-line extensions, a $2.1 million sewer extension, and city-paid roads and a deceleration lane.

Key data: Draft 380 agreement: $11.7M water lines, $2.1M sewer, city-paid roads

Claim classification: ADVOCACY_SOURCE · Verification: PARTIALLY_VERIFIED · Retrieved: 2026-09-05

Limitation: Draft terms per advocacy group; final agreement not reviewed.

Open source 1 →

COMMUNITY RESPONSE

San Angelo Data Center Campus (Skybox / Emergent): community response

approved

The site is about 3.6 miles from the PaulAnn residential area and the council imposed a 55 dB noise limit; the city later adopted data center land use regulations 6-0 on 19 May 2026 and a sewer discharge ordinance 5-1 on 2 June 2026.

Key data: 3.6 miles from PaulAnn; 55 dB noise limit; land use regs 6-0; sewer ordinance 5-1

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-02

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

San Angelo Data Center Campus (Skybox / Emergent) Data Center Project | San Angelo | Compute Equity Atlas