Evidence record
Operator December 2025 release confirms energization and mining operations at the solar-linked Ector County site. September 2026 release separately describes proposed Project Genesis expansion and conditional grid classification; these are not proof that full planned AI capacity is live. County identity only, with no parcel geometry.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-30
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.