Compute Equity Atlas
← National map
Source-backed project record · TX

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd)

This record consolidates 25 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
CORROBORATEDbest evidence tier
25linked evidence rows
Project facts

Location and operating record

Operator / developerPeak Mining (Northern Data group); Texas Comptroller list identifies 1102 McKinzie LLC as operator/occupant
JurisdictionCorpus Christi, TX
Address1102 McKinzie Rd and 1242 McKinzie Rd (near Hwy 44, opposite Lyondell)
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
Capacity600 MW
AliasesSaxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd) · Saxet Energy Park · Bootstrap Energy Nueces County facility · 1102 McKinzie LLC Data Center · 1242 McKinzie LLC Data Center · Peak Mining · Data Center - Bldg A
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure2 rows
SOURCE RECORD

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): source record

operational

Crypto-to-AI conversion candidate. Two Comptroller registrations (1102 and 1242 McKinzie) treated as one campus; they may also be modeled as separate facilities. Acreage reported 114-115 acres.

Key data: San Patricio Electric Cooperative listed as grid operator for the Bldg A record | ERCOT (Coastal / South) | City of Corpus Christi | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): ownership and profile

operational

Developer: Bootstrap Energy LLC | Owner: 1102 McKinzie LLC; 1242 McKinzie LLC; 1242 McKinzie Owner LLC | Property entity: 1242 McKinzie Owner LLC | County: Nueces | Research region: East Texas / South Texas-RGV / Statewide Rural Gap Pass | Tenants/customers: Peak Mining (Northern Data)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): power and grid

operational

Key data: Utility: San Patricio Electric Cooperative listed as grid operator for the Bldg A record | Grid area: ERCOT (Coastal / South) | Gross MW: 600 | Requested load MW: 600 | Onsite generation MW: 300 | Substations: Two 300 MW substations

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): water and cooling

operational

Key data: Water utility: City of Corpus Christi | Water demand: ~3 million gallons/month (compared to ~500 homes) reported during Stage 3 drought restrictions | Cooling: liquid cooling (switched from air cooling)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): permits and jurisdiction

operational

Key data: Permit IDs: Industrial District Agreement No. 110B, assigned to 1242 McKinzie Owner LLC (document C2023-223, 2023-10-10) | Jurisdictions: City of Corpus Christi (industrial district agreement) | Nueces County | ERCOT | Tax incentives: [object Object],[object Object],[object Object] | {"agreement_name":"Texas Comptroller qualifying data center registration - 1102 McKinzie LLC Data Center","agreement_number":"NOT_FOUND","approval_date":"2024-02-23 (effective date)","estimated_value":"NOT_FOUND","government_entity":"Texas Comptroller of Public Accounts","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php","term":"NOT_FOUND"} | {"agreement_name":"Texas Comptroller qualifying data center registration - 1242 McKinzie LLC Data Center","agreement_number":"NOT_FOUND","approval_date":"2024-06-11 (effective date)","estimated_value":"NOT_FOUND","government_entity":"Texas Comptroller of Public Accounts","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php","term":"NOT_FOUND"} | {"agreement_name":"Industrial District Agreement No. 110B (in lieu of annexation; PILOT structure)","agreement_number":"110B / doc C2023-223","approval_date":"2023-10-10 (assignment)","estimated_value":"NOT_FOUND","government_entity":"City of Corpus Christi","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://www.texasenvironment.org/news-room/bitcoin-mining-site-quietly-begins-pulling-water-amid-corpus-christi-drought","term":"NOT_FOUND"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): civic and community

operational

Water draw during Stage 3 drought restrictions criticized locally

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

No PILOT payments reported received from Peak Mining

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): environment and site

operational

Municipal water consumption during regional drought

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

On-site gas generation and battery storage

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

Key data: Surrounding infrastructure: Adjacent to Lyondell industrial complex

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

Key data: Surrounding infrastructure: Highway 44 corridor

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

Key data: Surrounding infrastructure: Two 300 MW substations

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): timeline

operational

Bootstrap Energy announces $400M Saxet Energy Park with 300 MW generation plus battery storage

Claim classification: Not yet assigned

Status date: 2022

Open source 1 →

operational

Industrial District Agreement No. 110B assigned to 1242 McKinzie Owner LLC (doc C2023-223)

Claim classification: Not yet assigned

Status date: 2023-10-10

Open source 1 →

operational

Data Center - Bldg A recorded operational at 1102 McKinzie Rd

Claim classification: Not yet assigned

Status date: 2023

Open source 1 →

operational

Comptroller data center exemption effective (1102 McKinzie LLC)

Claim classification: Not yet assigned

Status date: 2024-02-23

Open source 1 →

operational

Comptroller data center exemption effective (1242 McKinzie LLC)

Claim classification: Not yet assigned

Status date: 2024-06-11

Open source 1 →

operational

Reporting that the bitcoin mining site began drawing water amid Corpus Christi drought; ~3M gal/month

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →

EXACT LOCATION

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): exact location

operational

Global Energy Monitor publishes coordinates 27.7847725, -97.5761225 for the Bootstrap Energy Nueces County facility on McKinzie Road.

Key data: 27.7847725, -97.5761225

Claim classification: third_party_dataset · Verification: single_source · Retrieved: 2026-09-05

Limitation: Coordinates are site-level from a wiki dataset; treated as bounded-site rather than exact building precision.

Open source 1 →

STREET ADDRESS

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): street address

operational

Interconnection records list 'Data Center - Bldg A' at 1102 McKinzie Rd, Corpus Christi, TX 78410, under the Saxet Energy Park development name, operational as of 2023 with San Patricio Electric Cooperative as grid operator.

Key data: 1102 McKinzie Rd Bldg A, 78410; operational 2023

Claim classification: third_party_dataset · Verification: single_source · Retrieved: 2026-09-05

Status date: 2023

Limitation: Permit type and ID withheld behind a paywall on the source page.

Open source 1 →

TAX INCENTIVES

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): tax incentives

operational

The Texas Comptroller list shows '1102 McKinzie LLC Data Center' effective February 23, 2024 and '1242 McKinzie LLC Data Center' effective June 11, 2024, with 1102 McKinzie LLC as operator.

Key data: Comptroller registrations effective 2024-02-23 and 2024-06-11

Claim classification: official_record · Verification: primary_record · Retrieved: 2026-09-05

Status date: 2024-06-11

Open source 1 →

CAPACITY GROSS POWER

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): capacity gross power

operational

The project was announced as up to 600 MW with $1.3 billion of investment, including a $400 million Saxet Energy Park phase with 300 MW of generation plus battery storage and two 300 MW substations.

Key data: 600 MW proposed; $1.3B; 300 MW generation + BESS

Claim classification: reported_fact · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2022

Limitation: Built-out capacity today is not confirmed.

Open source 1 →

WATER IMPACT

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): water impact

operational

Reporting found the bitcoin mining site quietly began pulling roughly 3 million gallons of water per month, comparable to about 500 homes, during Stage 3 drought restrictions after switching to liquid cooling.

Key data: ~3 million gallons/month during Stage 3 drought

Claim classification: advocacy_reporting · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026

Limitation: Advocacy-organization source; municipal water records not directly retrieved.

Open source 1 →

OWNERSHIP CHAIN

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): ownership chain

operational

Industrial District Agreement No. 110B was assigned to 1242 McKinzie Owner LLC by document C2023-223 on October 10, 2023; no PILOT payments were reported received from Peak Mining.

Key data: IDA No. 110B assigned to 1242 McKinzie Owner LLC (C2023-223)

Claim classification: advocacy_reporting · Verification: single_source · Retrieved: 2026-09-05

Status date: 2023-10-10

Limitation: City document not fetched directly this session.

Open source 1 →

TENANT CUSTOMER

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd): tenant customer

operational

Peak Mining, part of the Northern Data group, occupies the site, making it a crypto-to-AI conversion candidate.

Key data: Peak Mining (Northern Data)

Claim classification: reported_fact · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026

Limitation: Corporate relationship between Bootstrap, Peak Mining and Northern Data not documented from primary filings.

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Saxet Energy Park / Peak Mining Corpus Christi campus (1102 & 1242 McKinzie Rd) Data Center Project | Corpus Christi | Compute Equity Atlas