Compute Equity Atlas
← National map
Source-backed project record · TX

Serverfarm CTX1 (Cutten Data Center)

This record consolidates 13 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
CORROBORATEDbest evidence tier
13linked evidence rows
Project facts

Location and operating record

Operator / developerServerfarm
JurisdictionHouston, TX
Address15555 Cutten Road
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity100 MW
AliasesServerfarm CTX1 (Cutten Data Center) · Serverfarm Cutten Road Campus · Serverfarm CTX2 · HOU2 · CTX1 · Cutten Data Center · former DXC/Compaq Cypress Creek site · Project Longhorn
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Serverfarm CTX1 (Cutten Data Center): source record

operational

Two-building campus of almost 500,000 sq ft. Located close to the former Compaq/HP headquarters in Cypress Creek.

Key data: CenterPoint Energy (Houston Electric service territory) | ERCOT | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Serverfarm CTX1 (Cutten Data Center): ownership and profile

operational

Developer: Serverfarm | Owner: Serverfarm (parent: Manulife) | Property entity: SF HOUC, LLC (Texas Comptroller data center registrant) | County: Harris | Research region: Houston / Gulf Coast

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Serverfarm CTX1 (Cutten Data Center): power and grid

operational

Key data: Utility: CenterPoint Energy (Houston Electric service territory) | Utility region: ERCOT Houston (Coast) load zone | Grid area: ERCOT | Gross MW: 100 | Substations: On-site substation with unused available capacity

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Serverfarm CTX1 (Cutten Data Center): water and cooling

operational

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Serverfarm CTX1 (Cutten Data Center): permits and jurisdiction

operational

Key data: Permit IDs: Texas Comptroller data center registration LD357799 (eff. 10/10/2024) - registrant SF HOUC, LLC | Jurisdictions: Harris County | City of Houston | State of Texas (Comptroller data center program)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Serverfarm CTX1 (Cutten Data Center): timeline

operational

Serverfarm announces acquisition; campus has secured capacity to scale to 100MW on existing grid power

Claim classification: Not yet assigned

Status date: 2024-09-12

Open source 1 →

operational

Texas Comptroller data center registration effective for SF HOUC, LLC

Claim classification: Not yet assigned

Status date: 2024-10-10

Open source 1 →

EXACT LOCATION

Serverfarm CTX1 (Cutten Data Center): exact location

operational

Serverfarm's second acquired Houston campus is at 15555 Cutten Road, described as two buildings totaling almost 500,000 sq ft near the former Compaq/HP headquarters in Cypress Creek.

Key data: 15555 Cutten Road; two buildings; ~500,000 sq ft

Claim classification: REPORTED_FACT · Verification: CORROBORATED · Retrieved: 2026-09-05

Status date: 2024-09-12

Open source 1 →

CAPACITY GROSS POWER

Serverfarm CTX1 (Cutten Data Center): capacity gross power

operational

Serverfarm said the Cutten Road campus has secured capacity to scale to 100MW using available existing grid power.

Key data: 100MW scalable on existing grid power

Claim classification: COMPANY_CLAIM · Verification: SINGLE_SOURCE · Retrieved: 2026-09-05

Status date: 2024-09-12

Open source 1 →

OWNERSHIP CHAIN

Serverfarm CTX1 (Cutten Data Center): ownership chain

operational

The Texas Comptroller data center registry lists SF HOUC, LLC (registration LD357799, effective 10/10/2024) as the entity for the Cutten Road site.

Key data: SF HOUC, LLC; LD357799 eff. 2024-10-10

Claim classification: OFFICIAL_RECORD · Verification: PRIMARY_SOURCE · Retrieved: 2026-09-05

Status date: 2024-10-10

Open source 1 →

OTHER PERMITS

Serverfarm CTX1 (Cutten Data Center): other permits

under_construction

TDLR project TABS2025014250 records a second Serverfarm new-construction data center at 15555 Cutten Road: 438,000 sq ft, $137M, start 7/11/2025, completion 7/10/2026.

Key data: TDLR TABS2025014250; 438,000 sq ft; $137,000,000

Claim classification: OFFICIAL_RECORD · Verification: PRIMARY_SOURCE · Retrieved: 2026-09-05

Status date: 2025-03-14

Open source 1 →

PROJECT TIMELINE

Serverfarm CTX1 (Cutten Data Center): project timeline

under_construction

TDLR lists the Cutten Road new-build with a construction start of 7/11/2025 and completion of 7/10/2026, mirroring the Betka Road project schedule.

Key data: Start 2025-07-11; completion 2026-07-10

Claim classification: OFFICIAL_RECORD · Verification: PRIMARY_SOURCE · Retrieved: 2026-09-05

Status date: 2025-07-11

Limitation: Scheduled dates, not verified completion.

Open source 1 →

DEVELOPER

Serverfarm CTX1 (Cutten Data Center): developer

under_construction

Trade coverage reported Serverfarm filing to build two more Houston data centers, the pair of TDLR projects at Betka Road and Cutten Road.

Key data: Two new Serverfarm Houston builds filed

Claim classification: REPORTED_FACT · Verification: CORROBORATED · Retrieved: 2026-09-05

Status date: 2025

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Serverfarm CTX1 (Cutten Data Center) Data Center Project | Houston | Compute Equity Atlas