Skybox Old Settlers PUD

This canonical record consolidates 12 source-backed observations without discarding aliases, limitations or unresolved dimensions.

approved_or_permittedproject status
VERIFIED_PRIMARYbest evidence tier
12linked evidence rows
Project facts

Location and operating record

Operator / developerNot established in current evidence
JurisdictionWilliamson County / Round Rock, TX
Address69 acres east of N. A.W. Grimes Blvd and south of E. Old Settlers Blvd
Location precisionstreet address
Coordinatesnull, null
Capacity75 MW
AliasesSkybox Old Settlers PUD
Evidence coverage

What has been researched

Project profile7 rows
Intent / permits0 rows
Civic / infrastructure5 rows
EXACT LOCATION

Skybox Old Settlers PUD: exact location

VERIFIED_PRIMARY

The city's dedicated data center page identifies the PUD case and the site's bounding streets and acreage

Key data: Case PUD25-00009; approximately 29.69 acres east of N. A.W. Grimes Blvd and south of E. Old Settlers Blvd

Limitation: Parcel IDs and lat-long not published on the city page

Open source →

POWER SUPPLIER

Skybox Old Settlers PUD: power supplier

VERIFIED_PRIMARY

The city page names the wires utility and the load cap written into the PUD

Key data: Oncor as distribution utility on the ERCOT grid; 75 MW cap

Limitation: No interconnection agreement number published

Open source →

WATER SUPPLIER

Skybox Old Settlers PUD: water supplier

VERIFIED_PRIMARY

Cooling is specified as closed-loop, limiting municipal water draw; the city is the utility provider for the in-city site

Key data: Closed-loop cooling required

Limitation: The city page does not state a gallons-per-day figure or a separate water service agreement

Open source →

JURISDICTION STACK

Skybox Old Settlers PUD: jurisdiction stack

VERIFIED_PRIMARY

Overlapping districts include a municipal utility district, the school district, and extraterritorial jurisdiction areas

Key data: Chandler Creek MUD; Round Rock ISD; portions in the city's ETJ; no incentives granted

Limitation: Air permitting status through TCEQ not addressed on this page

Open source →

PLANNING ZONING CONTACT

Skybox Old Settlers PUD: planning zoning contact

VERIFIED_PRIMARY

The city documents the review sequence through the Planning and Zoning Commission and City Council readings

Key data: Planning and Zoning Commission review 2025-11-05; Council first reading 2025-12-04; final reading 2026-02-12

Limitation: No named planner, phone or email published for case PUD25-00009

Open source →

GENERAL CONTACT

Skybox Old Settlers PUD: general contact

VERIFIED_PRIMARY

The developer operates a project-specific public inbox for the Round Rock site

Key data: roundrockdatacenter@skyboxdatacenters.com

Limitation: No phone number published on the project site

Open source →

DATA INTEGRITY NOTE

Skybox Old Settlers PUD: data integrity note

CORROBORATED

A separate Skybox project in Hutto must not be conflated with the Round Rock PUD

Key data: Hutto project is 159 acres at U.S. 79 and CR 132 under Hutto Data Center LLC, with Oncor purchasing 62 acres and Bob Farley as Hutto economic development director

Limitation: Same county and same developer, different city, case and site; keep as separate database records

Open source →

UTILITY INTERCONNECTION QUEUE

Skybox Old Settlers PUD: utility interconnection queue

Approved (PUD)

The PUD caps the project at 75 MW of grid-interconnected power; Oncor must confirm capacity exists and the operator must sign a binding take-and-pay contract before proceeding. Grid capacity determinations rest with Oncor and ERCOT, not the City.

Key data: Cap of 75 MW grid-interconnected power

Status date: 2026 (page current)

Limitation: No ERCOT queue position/status disclosed for this load.

Open source →

COMMUNITY OPPOSITION OR LITIGATION

Skybox Old Settlers PUD: community opposition or litigation

Approved over opposition

Council approved the rezoning after residents packed City Hall; opposition organized at protectroundrock.org and via a Change.org petition, and Public Citizen called the unanimous approval "a stunning betrayal of the public trust." Planning & Zoning had recommended approval 7-0 on Nov 5, 2025 with no public speakers at that hearing; the council hearings then drew over an hour of comment on water, low-frequency noise, air, and grid concerns.

Key data: P&Z 7-0 recommendation (2025-11-05); Council approved unanimously; organized opposition site + petition

Status date: 2025-11-05 (P&Z) / council vote thereafter

Limitation: Exact council vote date/tally not captured in the fetched city record; no litigation found. (confidence detail: VERIFIED_PRIMARY (city record) + DISCOVERY_LEAD (advocacy))

Open source →

AGRICULTURAL OR LAND USE CONVERSION

Skybox Old Settlers PUD: agricultural or land use conversion

Approved

Not agricultural conversion: the 29.69-acre tract was zoned LI (Light Industrial) in 2023, has remained undeveloped, and is designated for industrial use on the 2030 Future Land Use Map.

Key data: 29.69 acres, LI since 2023, undeveloped

Status date: 2025-11-05

Limitation:

Open source →

FISCAL IMPACT LOCAL GOVERNMENT

Skybox Old Settlers PUD: fiscal impact local government

Disclosed

The City's own comparison: an existing data center pays roughly **$800,000/year** in city property tax while using about the water of 15 homes, versus ~$21,000 in city property tax from 15 homes at current median taxable value.

Key data: ~$800,000/yr city property tax vs ~$21,000 for 15 homes

Status date: 2026 (page current)

Limitation: City framing, not an independent fiscal-impact study; no abatement disclosed for Skybox.

Open source →

NOISE OR TRAFFIC IMPACT

Skybox Old Settlers PUD: noise or traffic impact

Approved

No variance was sought: noise must comply with the City Noise Ordinance on the same terms as neighboring industrial users, and mitigation is structural — an 80-foot setback, 25-foot landscape buffer, and masonry compatibility wall toward the Chandler Creek MUD neighborhood. Traffic is limited to a maximum of three driveways on Old Settlers Blvd with no connection to Chandler View Trail; **no traffic study requirement is stated**. Neighborhood-meeting concerns included audible and low-frequency noise and generator testing frequency.

Key data: 80-ft setback, 25-ft buffer, masonry wall; max 3 driveways; no decibel limit and no traffic study in the record

Status date: 2025-11-05

Limitation: No predicted operational dB levels, no low-frequency limit, no monitoring requirement in the record.