Soluna Project Annie

This record consolidates 10 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
SOURCE_BACKEDbest evidence tier
10linked evidence rows
Project facts

Location and operating record

Operator / developerSoluna Computing
JurisdictionParis area (per third-party trackers), TX
AddressNOT_FOUND
Location precisionlocality centroid
CoordinatesNot published; no coordinate inferred
Capacity75 MW
AliasesSoluna Project Annie · Project Annie, co-located with a 114 MW solar farm · Project Annie
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Soluna Project Annie: source record

planned

Rural gap find. The primary company release does not name the county; the Lamar County / Paris attribution comes from third-party trackers surfaced in search and was not independently verified from a primary record this session. Project model stated as BTC plus AI/HPC hosting; status 'Development'.

Key data: NOT_FOUND | ERCOT (ERCOT planning underway) | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Soluna Project Annie: ownership and profile

planned

Developer: Soluna Holdings, Inc. (NASDAQ: SLNH) | Owner: Soluna Holdings, Inc. | County: Lamar (per third-party trackers; not stated in the company release) | Research region: East Texas / South Texas-RGV / Statewide Rural Gap Pass

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Soluna Project Annie: power and grid

planned

Key data: Grid area: ERCOT (ERCOT planning underway) | Gross MW: 75 | IT load MW: 75 | Onsite generation MW: 114

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Soluna Project Annie: water and cooling

planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Soluna Project Annie: permits and jurisdiction

planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Soluna Project Annie: environment and site

planned

Designed to convert underutilized/curtailed solar energy into compute

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Soluna Project Annie: timeline

planned

Soluna announces Project Annie, its first solar-powered data center: 75 MW co-located with a 114 MW solar farm; power term sheet signed; next steps are definitive PPAs, land agreements and ERCOT planning

Claim classification: Not yet assigned

Status date: 2025-05-22

Open source 1 →

CAPACITY GROSS POWER

Soluna Project Annie: capacity gross power

planned

Soluna Holdings announced Project Annie, a 75 MW data center co-located with a 114 MW solar farm in northeast Texas, for Bitcoin and AI/HPC hosting.

Key data: 75 MW DC; 114 MW solar

Claim classification: company_announcement · Verification: primary_source · Retrieved: 2026-09-05

Status date: 2025-05-22

Limitation: The announcement does not name the county or city; Lamar County / Paris placement comes from third-party directories not treated as authoritative here.

Open source 1 →

PROJECT STATUS

Soluna Project Annie: project status

planned

Soluna reported signing a term sheet for power and stated it would move to definitive power purchase agreements, land agreements and ERCOT planning; the project is listed at the Development stage.

Key data: Term sheet for power signed; status Development

Claim classification: company_announcement · Verification: primary_source · Retrieved: 2026-09-05

Status date: 2025-05-22

Limitation: No ERCOT queue record retrieved.

Open source 1 →

DEVELOPER

Soluna Project Annie: developer

planned

The project is developed by Soluna Holdings, Inc. (NASDAQ: SLNH) with an unnamed leading U.S. renewable energy operator as partner, within a pipeline exceeding 773 MW.

Key data: Soluna Holdings; unnamed renewable partner

Claim classification: company_announcement · Verification: primary_source · Retrieved: 2026-09-05

Status date: 2025-05-22

Limitation: Partner and site owner not identified.

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Soluna Project Annie Data Center Project | Paris area (per third-party trackers) | Compute Equity Atlas