STACK South Dallas Campus

This record consolidates 9 research observations while retaining source distinctions, location precision and unresolved fields.

under_constructionproject status
VERIFIED_PRIMARYbest evidence tier
9linked evidence rows
Project facts

Location and operating record

Operator / developerSTACK Infrastructure
JurisdictionLancaster (South Dallas), TX
AddressNot published
Location precisionlocality centroid
Coordinates32.793333, -96.766513
CapacityNot established
AliasesSTACK South Dallas Campus · STACK South Dallas
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

STACK South Dallas Campus: source record

under_construction

220 MW flagship campus; Oncor committed power and a dedicated substation.

Key data: Oncor Electric Delivery | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

STACK South Dallas Campus: ownership and profile

under_construction

Developer: STACK Infrastructure | Owner: STACK Infrastructure | County: Dallas | Research region: Dallas-Fort Worth / North Texas

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

STACK South Dallas Campus: power and grid

under_construction

Key data: Utility: Oncor Electric Delivery | Grid area: ERCOT | Substations: Dedicated substation with power committed by Oncor

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

STACK South Dallas Campus: water and cooling

under_construction

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

STACK South Dallas Campus: permits and jurisdiction

under_construction

Key data: Jurisdictions: City of Lancaster | Dallas County | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

STACK South Dallas Campus: timeline

under_construction

Campus announced

Claim classification: Not yet assigned

Status date: 2024-04-29

Open source 1 →

under_construction

Targeted delivery

Claim classification: Not yet assigned

Status date: mid-2026

Open source 1 →

CAPACITY GROSS POWER

STACK South Dallas Campus: capacity gross power

under_construction

STACK announced a 220 MW South Dallas campus comprising six 36 MW data centers.

Key data: 220 MW; six 36 MW buildings

Claim classification: COMPANY_ANNOUNCEMENT · Verification: PRIMARY_SOURCE · Retrieved: 2026-09-05

Status date: 2024-04-29

Open source 1 →

POWER SUPPLIER

STACK South Dallas Campus: power supplier

under_construction

Oncor has committed power and a dedicated substation for the 100+ acre, 1.5M sq ft campus.

Key data: Oncor committed power; dedicated substation; 1.5M sq ft

Claim classification: REPORTED_FACT · Verification: PRIMARY_SOURCE · Retrieved: 2026-09-05

Status date: 2024-04-29

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

STACK South Dallas Campus Data Center Project | Lancaster (South Dallas) | Compute Equity Atlas