Compute Equity Atlas
← National map
Source-backed project record · TX

TAMU West Campus Data Center - 2B

This record consolidates 8 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
SOURCE_BACKEDbest evidence tier
8linked evidence rows
Project facts

Location and operating record

Operator / developerTexas A&M University
JurisdictionCollege Station, TX
Address474 Agronomy Road
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesTAMU West Campus Data Center - 2B · 474 Agronomy Road · West Campus Data Center Phase 2B
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

TAMU West Campus Data Center - 2B: source record

planned

Likely an expansion phase of the existing West Campus Data Center rather than a standalone facility. The listed utility (Navasota Valley Electric Cooperative) is derived by the aggregator and is inconsistent with a College Station campus location, so treat it as unverified.

Key data: Navasota Valley Electric Cooperative (per record) | ERCOT | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

TAMU West Campus Data Center - 2B: ownership and profile

planned

Developer: Texas A&M University | Owner: Texas A&M University | County: Brazos | Research region: Temple-Killeen-Waco / Bryan-College Station / Texoma

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

TAMU West Campus Data Center - 2B: power and grid

planned

Key data: Utility: Navasota Valley Electric Cooperative (per record) | Utility region: ERCOT | Grid area: ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

TAMU West Campus Data Center - 2B: water and cooling

planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

TAMU West Campus Data Center - 2B: permits and jurisdiction

planned

Key data: Permit IDs: Architectural Barriers compliance record, application date 2025-05-23, status Project Registered | Jurisdictions: State of Texas | Texas A&M University System | Brazos County | City of College Station | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

TAMU West Campus Data Center - 2B: timeline

planned

Permit record application date

Claim classification: Not yet assigned

Status date: 2025-05-23

Open source 1 →

planned

Proposed operational date

Claim classification: Not yet assigned

Status date: 2025-12-31

Open source 1 →

OTHER PERMITS

TAMU West Campus Data Center - 2B: other permits

planned

An aggregated public-record entry derived from a Texas architectural-barriers filing lists a proposed 6,505 sq ft 'TAMU West Campus Data Center - 2B' at 474 Agronomy Road, College Station, with Texas A&M University as developer, owner and operator; application date 2025-05-23, proposed operational date 2025-12-31.

Key data: 6,505 sq ft; application 2025-05-23; proposed operational 2025-12-31

Claim classification: REPORTED_FACT · Verification: SINGLE_SOURCE_AGGREGATOR · Retrieved: 2026-09-05

Status date: 2025-05-23

Limitation: Tier-3 aggregator record; underlying TDLR filing not independently opened this session. Aggregator-derived utility (Navasota Valley Electric Cooperative) appears inconsistent with the College Station campus location.

Open source 1 →

Sources

Evidence and provenance

Open TX state research →