operational
Only the Comptroller registrations could be verified from fetched primary sources this session. Widely reported capacity figures for Cortex (~130 MW) and Cortex 2 (~500 MW, phase 1 ~250 MW) appear only in secondary/tertiary outlets that were not fetched and verified, so no MW value is recorded here.
Key data: Austin Energy / on-site Megapack storage (reported) | ERCOT South Central / Austin-Central Texas load zone | NOT_FOUND | NOT_FOUND
Claim classification: Not yet assigned
Status date: 2026-09-05