Texas A&M West Campus Data Center (WCDC)

This record consolidates 9 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
VERIFIED_PRIMARYbest evidence tier
9linked evidence rows
Project facts

Location and operating record

Operator / developerTexas A&M University Technology Services (Infrastructure Operations Group)
JurisdictionCollege Station, TX
AddressTexas A&M University West Campus (street address not published)
Location precisionlocality centroid
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesTexas A&M West Campus Data Center (WCDC) · Texas A&M University West Campus · WCDC
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Texas A&M West Campus Data Center (WCDC): source record

operational

University enterprise/research data center, distinct from the commercial projects in this region. Availability designed between 99.982% and 99.995%.

Key data: NOT_FOUND | ERCOT | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Texas A&M West Campus Data Center (WCDC): ownership and profile

operational

Developer: Texas A&M University | Owner: Texas A&M University | County: Brazos | Research region: Temple-Killeen-Waco / Bryan-College Station / Texoma | Tenants/customers: Texas A&M University Central Texas | Dwight Look College of Engineering Cloud | Texas A&M System enterprise applications

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Texas A&M West Campus Data Center (WCDC): power and grid

operational

Key data: Utility region: ERCOT | Grid area: ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Texas A&M West Campus Data Center (WCDC): water and cooling

operational

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Texas A&M West Campus Data Center (WCDC): permits and jurisdiction

operational

Key data: Jurisdictions: State of Texas | Texas A&M University System | Brazos County | City of College Station | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Texas A&M West Campus Data Center (WCDC): environment and site

operational

Key data: Surrounding infrastructure: Serves as an off-site recovery location for A&M's Galveston and Qatar campuses

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

Key data: Surrounding infrastructure: Contracted 24x7 armed security through the University Police Department

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Texas A&M West Campus Data Center (WCDC): timeline

operational

Brought online with 8,400 sq ft commissioned in Phase 1

Claim classification: Not yet assigned

Status date: 2019

Open source 1 →

BACKUP GENERATION

Texas A&M West Campus Data Center (WCDC): backup generation

operational

The West Campus Data Center is described as a 50,000 sq ft facility with up to 30,000 sq ft of raised floor, supported by two 2.5 MW generator sets in a 2N configuration serving a 1.5 MW IT load, with contracted 24x7 armed security from the University Police Department.

Key data: Two 2.5 MW gensets (2N) supporting 1.5 MW IT load

Claim classification: REPORTED_FACT · Verification: VERIFIED_PRIMARY_INSTITUTIONAL · Retrieved: 2026-09-05

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Texas A&M West Campus Data Center (WCDC) Data Center Project | College Station | Compute Equity Atlas