Source-backed project record · TX

Tract Caldwell Valley Technology Park

This record consolidates 16 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
CONFLICTINGbest evidence tier
16linked evidence rows
Project facts

Location and operating record

Operator / developerNOT_FOUND (land/master developer model; tenants operate their own facilities)
JurisdictionLockhart (north of Lockhart; near Uhland), TX
AddressNOT_FOUND
Location precisionlocality centroid
CoordinatesNot published; no coordinate inferred
Capacity2000 MW
AliasesTract Caldwell Valley Technology Park · Caldwell Valley Technology Park · Tract Caldwell County · Caldwell Valley
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure3 rows
SOURCE RECORD

Tract Caldwell Valley Technology Park: source record

planned

CONFLICT on scale: Tract's own May 2025 release states 1,515 acres and 'over 2 GW at full build-out', while Caldwell County's February and March 2026 commissioners court recaps describe a 3,000-acre campus with 'over 4GW capacity'. Both are recorded; acreage/MW fields use the company's audited figures and the county figures are preserved in the timeline. The discrepancy may reflect additional land assembly after May 2025.

Key data: Bluebonnet Electric Cooperative (Facility Design Agreement executed) | ERCOT South Central / Austin-Central Texas load zone | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Tract Caldwell Valley Technology Park: ownership and profile

planned

Developer: Tract (Tract Development / tract.com), CEO Grant van Rooyen | Owner: Tract | Property entity: Tract | County: Caldwell | Research region: Austin / Central Texas | Tenants/customers: Not disclosed (master-planned park marketed to hyperscale and AI tenants)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Tract Caldwell Valley Technology Park: power and grid

planned

Key data: Utility: Bluebonnet Electric Cooperative (Facility Design Agreement executed) | Utility region: Bluebonnet Electric Cooperative service territory within ERCOT | Grid area: ERCOT South Central / Austin-Central Texas load zone | Gross MW: 2000 | Requested load MW: 360 | Transmission: Facility Design Agreement with Bluebonnet Electric Cooperative; initial 360 MW energization targeted for 2028

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Tract Caldwell Valley Technology Park: water and cooling

planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Tract Caldwell Valley Technology Park: permits and jurisdiction

planned

Key data: Jurisdictions: Caldwell County | City of Uhland (adjacent/ETJ) | Bluebonnet Electric Cooperative | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Tract Caldwell Valley Technology Park: civic and community

planned

Residents repeatedly raised water use and pollution concerns at Caldwell County Commissioners Court

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

County Judge Hoppy Haden emphasized that counties cannot zone and have very limited authority to stop such developments, urging residents to lobby state legislators

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Tract co-investing in FM 2720 roadway expansion; Uhland Mayor Lacee Duke quoted in the company release

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Tract Caldwell Valley Technology Park: environment and site

planned

TCEQ, not the county, issues air-quality and related environmental permits for these facilities, per county statements

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: FM 2720 corridor expansion; Bluebonnet Electric Cooperative distribution and transmission

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Tract Caldwell Valley Technology Park: timeline

planned

Tract closes acquisition of 1,515 acres in Caldwell County for a multi-gigawatt data center technology park; announces Facility Design Agreement with Bluebonnet Electric Cooperative and a 2028 target for initial 360 MW energization

Claim classification: Not yet assigned

Status date: 2025-05-07

Open source 1 →

planned

Caldwell County Commissioners hear resident concerns and commit to a public data center workshop; county describes the Tract campus as ~3,000 acres with over 4 GW capacity

Claim classification: Not yet assigned

Status date: 2026-02-26

Open source 1 →

planned

Caldwell County holds a public data center workshop; county again describes the Tract campus as a 3,000-acre park with over 4 GW capacity

Claim classification: Not yet assigned

Status date: 2026-03-12

Open source 1 →

CAMPUS ACRES

Tract Caldwell Valley Technology Park: campus acres

closed acquisition

Tract announced it closed on 1,515 acres in Caldwell County for a multi-gigawatt data center technology park with over 2 GW at full build-out.

Key data: 1,515 acres; over 2 GW at full build-out

Claim classification: company_disclosure · Verification: VERIFIED_PRIMARY · Retrieved: 2026-09-05

Status date: 2025-05-07

Limitation: None

Open source 1 →

INTERCONNECTION

Tract Caldwell Valley Technology Park: interconnection

announced

Tract executed a Facility Design Agreement with Bluebonnet Electric Cooperative and targets energization of an initial 360 MW in 2028.

Key data: Initial 360 MW targeted for 2028; Bluebonnet FDA signed

Claim classification: company_disclosure · Verification: VERIFIED_PRIMARY · Retrieved: 2026-09-05

Status date: 2025-05-07

Limitation: None

Open source 1 →

CAPACITY GROSS POWER

Tract Caldwell Valley Technology Park: capacity gross power

conflicting

Caldwell County's own commissioners court recaps describe the Caldwell Valley Technology Park as a 3,000-acre campus with over 4 GW of capacity — materially larger than the company's May 2025 figures.

Key data: County: ~3,000 acres, over 4 GW vs company: 1,515 acres, over 2 GW

Claim classification: primary_government_record · Verification: CONFLICTING · Retrieved: 2026-09-05

Status date: 2026-03-12

Limitation: Two authoritative sources disagree; may reflect additional land assembly after May 2025.

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Tract Caldwell Valley Technology Park Data Center Project | Lockhart (north of Lockhart; near Uhland) | Compute Equity Atlas