TRG Houston One (HOU1)

This record consolidates 12 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
CORROBORATEDbest evidence tier
12linked evidence rows
Project facts

Location and operating record

Operator / developerTRG Datacenters
JurisdictionSpring, TX
Address2626 Spring Cypress Road
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity6 MW
AliasesTRG Houston One (HOU1) · TRG Houston Campus · TRG Houston Two & Three (HOU2 & HOU3) · HOU1 · TRG Houston One
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

TRG Houston One (HOU1): source record

operational

Key data: CenterPoint Energy | ERCOT | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-08-22

Open source 1 →

OWNERSHIP AND PROFILE

TRG Houston One (HOU1): ownership and profile

operational

Developer: TRG Datacenters | Owner: Tallvine Partners | County: Harris | Research region: Houston / Gulf Coast

Claim classification: Not yet assigned

Status date: 2026-08-22

Open source 1 →

POWER AND GRID

TRG Houston One (HOU1): power and grid

operational

Key data: Utility: CenterPoint Energy | Utility region: ERCOT Houston (Coast) load zone | Grid area: ERCOT | Gross MW: 6 | Substations: Four different area substations supply power to the TRG Houston campus

Claim classification: Not yet assigned

Status date: 2026-08-22

Open source 1 →

WATER AND COOLING

TRG Houston One (HOU1): water and cooling

operational

Claim classification: Not yet assigned

Status date: 2026-08-22

Open source 1 →

PERMITS AND JURISDICTION

TRG Houston One (HOU1): permits and jurisdiction

operational

Key data: Jurisdictions: Harris County | City of Houston ETJ

Claim classification: Not yet assigned

Status date: 2026-08-22

Open source 1 →

ENVIRONMENT AND SITE

TRG Houston One (HOU1): environment and site

operational

Key data: Surrounding infrastructure: 16 carriers on-net

Claim classification: Not yet assigned

Status date: 2026-08-22

Open source 1 →

operational

Key data: Surrounding infrastructure: Four supplying substations

Claim classification: Not yet assigned

Status date: 2026-08-22

Open source 1 →

operational

Key data: Surrounding infrastructure: Physically separated dual power distribution buses

Claim classification: Not yet assigned

Status date: 2026-08-22

Open source 1 →

TIMELINE

TRG Houston One (HOU1): timeline

operational

HOU1 goes live

Claim classification: Not yet assigned

Status date: 2018

Open source 1 →

CAPACITY GROSS POWER

TRG Houston One (HOU1): capacity gross power

operational

TRG lists HOU1 with 6MW of utility power across 45,000 GSF.

Key data: 6MW; 45,000 GSF

Claim classification: COMPANY_CLAIM · Verification: CORROBORATED · Retrieved: 2026-09-05

Status date: 2026-08-22

Open source 1 →

SURROUNDING INFRASTRUCTURE

TRG Houston One (HOU1): surrounding infrastructure

operational

TRG's HOU1 is described with 2N+1 distributed redundancy, a 100% uptime track record since opening in 2018, and 16 on-site campus carriers.

Key data: 2N+1 redundancy; 16 on-campus carriers; live since 2018

Claim classification: AGGREGATOR_LISTING · Verification: SINGLE_SOURCE · Retrieved: 2026-09-05

Status date: 2026-09-05

Open source 1 →