Evidence record
Current US Signal facility page and 2026 specification confirm active Aurora colocation at the former DataBridge site address. June 2026 release describes expansion of this existing facility; future UPS and utility targets are not current measured load. DataBridge and Agile source identities represent the same facility, not new sites.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-30
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.