Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Accepted facility identity linked

University of Rhode Island Data Center - Tyler Hall

Kingston, RI · University of Rhode Island

Reported status: operational

Reported capacity: 0.16 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Kingston. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Read 1 source findings (2026-10-29)

Current university IT service confirms an on-campus Tyler Hall data center, distinct from its Warwick colocation. University building directory supplies 9 Greenhouse Road. Census returned no address match; geography is held. Evidence

Existing project record

research-final:RI:e1b170bd4b175b12dd2d
Existing facility identity linked

Crown Castle Providence - 235 Promenade Street (RI1)

Providence, RI · Crown Castle Fiber

Reported status: operational

Reported capacity: 4 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

Read 1 source findings

Lightower's own May 14, 2012 disclosure names its existing and expanded carrier-neutral colocation building at 235 Promenade Street, The Foundry, Providence. The supplier historical Crown Castle and Lightower Providence RI1 names describe the very same existing physical site, not a second building. This dated first-party record does not prove current Zayo operation, 2026 owner succession at that exact property, commissioned IT power, or surveyed geometry. Retain the original supplier status, MW and all provenance without operator promotion or new mapped location. Evidence

Existing project record

research-final:RI:95f04bbd970ee86ad2ef
Existing facility identity linked

Crown Castle Providence - 300 Carpenter Street

Providence, RI · Crown Castle Fiber

Reported status: operational

Reported capacity: 1 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

Read 1 source findings

Independent facility-property and service-provider documentation identifies the historic Lightower/Crown Castle Fiber RI2 colocation building at 300 Carpenter Street, Providence. This source name and the already admitted Crown Castle 300 Carpenter canonical root denote the same building, distinct from the 304 Carpenter Prov.net site and the 235 Promenade Foundry location. This historical property identity does not establish present operator, measured IT megawatts, ongoing operation or exact geometry; refuse secondary-provider coordinate adoption. Evidence

Existing project record

research-final:RI:c89a77e2b7eabe2cd078
Awaiting source review

Lumen Providence (375 Promenade St)

Providence, RI · Lumen Technologies

Reported status: operational

Source reference: address match (exact): 375 PROMENADE ST, PROVIDENCE, RI, 02908. Census Geocoder; not a verified facility pin.

Original source · 2026-10-26

research-final:RI:7b6e94bbe47d14a0d014
Awaiting source review

Lumen Providence 1

Providence, RI · Lumen Technologies

Reported status: operational

Approximate locality: address match (exact): 375 PROMENADE ST, PROVIDENCE, RI, 02908. Census Geocoder; not a verified facility pin.

Original source · 2026-06-15

research-final:RI:da4fc672933fa2303a93
Awaiting source review

MegaNet Rhode Island Datacenter

Providence, RI · MegaNet Communications

Reported status: operational

Approximate locality: address match (exact): 275 PROMENADE ST, PROVIDENCE, RI, 02908. Census Geocoder; not a verified facility pin.

Original source · 2026-07-18

research-final:RI:42bcd256e3fbefd6ae6a
Accepted facility identity linked

Prov.net Providence 1 - 935 Westminster Street

Providence, RI · Provdotnet, LLC

Reported status: operational

Exact location not published.

Original source · 2026-07-19

Read 1 source findings

Independent provider marketplace identifies Prov.net Providence 1 at 935 Westminster Street, Providence. The provider also offers Providence colocation. This is a distinct building from both 1155 Westminster and 304 Carpenter, but the available information does not independently establish 2026 commissioning or operating status, measured IT MW, exact geometry, or a second phase. Evidence

Existing project record

research-final:RI:91d98275c859e0c34230
Accepted facility identity linked

Prov.net Providence 2 - 1155 Westminster Street

Providence, RI · Provdotnet, LLC

Reported status: operational

Source reference: address match (exact): 1155 WESTMINSTER ST, PROVIDENCE, RI, 02909. Census Geocoder; not a verified facility pin.

Original source · 2026-07-19

Read 1 source findings

Contemporaneous May 14, 2007 reporting identifies the 1155 Westminster Street former Crest Craft jewelry factory, already hosting some web tenants as the Westminster Technology Center conversion was underway. A later independent directory names Prov.net Providence 2 at this address. This supports one historical physical building, distinct from the 935 Westminster and 304 Carpenter properties; ongoing operation and capacity in 2026 are not established. Evidence

Existing project record

research-final:RI:921c3323a519efb4a452
Existing facility identity linked

Prov.net Providence 3 - 304 Carpenter Street

Providence, RI · Provdotnet, LLC

Reported status: operational

Reported capacity: 1 MW (scope and operation unverified)

Approximate locality: address match (exact): 304 CARPENTER ST, PROVIDENCE, RI, 02909. Census Geocoder; not a verified facility pin.

Original source · 2026-06-15

Read 1 source findings

Hurricane Electric's own October 2021 point-of-presence announcement, reported by Providence Business News November 2, 2021, directly names the Prov.net PVD2 facility at 304 Carpenter Street, Providence. The older provider listing Prov.net Providence 3 at the same street address and PVD2 are aliases for one existing physical property, not two buildings. The 2021 critical power description is not measured operating IT load; the announcement does not independently demonstrate 2026 operating status, ownership, surveyed coordinates or a site at 1155 Westminster Street. Evidence

Existing project record

research-final:RI:9555a2a7894a309acbd5
Existing facility identity linked

Prov.net PVD1 (1155 Westminster)

Providence, RI · Provdotnet LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings

Independent directory places Prov.net Providence 2 at 1155 Westminster, matching the physical building historically converted from the Crest Craft factory. Supplier PVD1/PVD2 naming is inconsistent across provider directories, so retain the original as a historical alias and do not create another physical building from the site code. Current operation, capacity and exact point geometry remain unverified. Evidence

Existing project record

research-final:RI:9706370ace05ebbffd75
Existing facility identity linked

Prov.net PVD2 (304 Carpenter)

Providence, RI · Provdotnet LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings

Hurricane Electric's own October 2021 point-of-presence announcement, reported by Providence Business News November 2, 2021, directly names the Prov.net PVD2 facility at 304 Carpenter Street, Providence. The older provider listing Prov.net Providence 3 at the same street address and PVD2 are aliases for one existing physical property, not two buildings. The 2021 critical power description is not measured operating IT load; the announcement does not independently demonstrate 2026 operating status, ownership, surveyed coordinates or a site at 1155 Westminster Street. Evidence

Existing project record

research-final:RI:c1605e4fbb855039362a
Existing facility identity linked

Providence RI1 (former Crown Castle Fiber / Lightower), The Foundry, 235 Promenade St

Providence, RI · Zayo (formerly Crown Castle Fiber)

Reported status: operational

Source reference: address match (exact): 235 PROMENADE ST, PROVIDENCE, RI, 02908. Census Geocoder; not a verified facility pin.

Original source · 2026-10-26

Read 1 source findings

Lightower's own May 14, 2012 disclosure names its existing and expanded carrier-neutral colocation building at 235 Promenade Street, The Foundry, Providence. The supplier historical Crown Castle and Lightower Providence RI1 names describe the very same existing physical site, not a second building. This dated first-party record does not prove current Zayo operation, 2026 owner succession at that exact property, commissioned IT power, or surveyed geometry. Retain the original supplier status, MW and all provenance without operator promotion or new mapped location. Evidence

Existing project record

research-final:RI:6469632d2830ed3e5e4b
Existing facility identity linked

Providence RI2 (former Crown Castle Fiber / Lightower), 300 Carpenter St

Providence, RI · Zayo (formerly Crown Castle Fiber)

Reported status: operational

Source reference: address match (exact): 300 CARPENTER ST, PROVIDENCE, RI, 02909. Census Geocoder; not a verified facility pin.

Original source · 2026-10-26

Read 1 source findings

Independent facility-property and service-provider documentation identifies the historic Lightower/Crown Castle Fiber RI2 colocation building at 300 Carpenter Street, Providence. This source name and the already admitted Crown Castle 300 Carpenter canonical root denote the same building, distinct from the 304 Carpenter Prov.net site and the 235 Promenade Foundry location. This historical property identity does not establish present operator, measured IT megawatts, ongoing operation or exact geometry; refuse secondary-provider coordinate adoption. Evidence

Existing project record

research-final:RI:25687f04d77a1780ed8d
Existing facility identity linked

Westminster Technology Center - Former Crest Craft Factory

Providence, RI · Lindsay Ahlborg; Edward Schultz

Reported status: operational

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Providence. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-19

Read 1 source findings

Dated May 14, 2007 contemporary reporting identifies the former Crest Craft factory at 1155 Westminster Street and its conversion to the Westminster Technology Center, with preexisting hosting tenants. This is the same property as the separately titled Prov.net 1155 Westminster observations, not another facility. The historic report does not establish current operating service, electricity load or mapped coordinates. Evidence

Existing project record

research-final:RI:87fc7f6240a66091d4fa
Existing facility identity linked

Hanton City Business Park (data center anchor)

Smithfield, RI · Hanton City Investments LLC

Reported status: proposed

Exact location not published.

Original source · 2026-10-26

Read 1 source findings

Ocean State Media on May 13, 2026 identifies the Hanton City Investments LLC business-complex application, filed May 4, as containing data center and data-processing uses in Smithfield. The separately named Hanton City Business Park source is the same already accepted proposed Hanton City Investments Smithfield project, not an operating facility, an independently commissioned building or a second land parcel campus. The council's May 5 prohibition and the earlier filing create unresolved administrative and legal questions. The reporting does not establish construction, completed approval, MW, exact mapped geometry or a cancelled disposition. Evidence

Existing project record

research-final:RI:f79d615c4e24e672134d
Existing facility identity linked

Hanton City Investments Smithfield Data Center

Smithfield, RI · Hanton City Investments LLC; Revity Energy; RJB Properties; John Branca

Reported status: proposed

Approximate locality: approximate: Census 2024 Gazetteer county centroid for Providence County. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-18

Read 1 source findings

The September 30, 2026 local report identifies Hanton City Investments LLC and ROK LLC as the applicants for the Smithfield Corporate Complex at 364 George Washington Highway, with a proposed data center component. The town's June 11 certificate of incompleteness was appealed, and the October hearing was postponed to January 2027 amid litigation. This source names the same already admitted Hanton City Investments Smithfield proposed project as the companion business-park record, not a second data center campus. The unresolved legal and zoning dispute does not prove a final denial, construction, current operation, MW or precise source-rights-cleared geometry. Evidence

Existing project record

research-final:RI:135fa72dec387192cf3b
Accepted facility identity linked

Brightstar Lottery Enterprise Data Center (West Greenwich)

West Greenwich, RI · Brightstar Lottery PLC

Reported status: operational

Source reference: address match (exact): 47 TECHNOLOGY WAY, WEST GREENWICH, RI, 02817. Census Geocoder; not a verified facility pin.

Original source · 2026-10-26

Read 1 source findings (2026-10-30)

Issuer FY2025 Form 20-F property table as of February 19 2026 explicitly identifies owned enterprise data center with data-center and network-operations use at 100 percent utilization. Distinct from 55 Technology Way office and testing premises. Primary table omits ZIP; Census matches full street, city and state. Evidence

Existing project record

research-final:RI:c1dcb37144b38f343ae0
Awaiting source review

Aiken 5 Mw Data Center

Aiken, SC

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

research-final:SC:03c031bdbed113b5c0e5
Existing facility identity linked

Meta Sage Mill Industrial Park Data Center

Aiken, SC · Meta Platforms Inc.

Reported status: under construction

Reported capacity: 200 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-19

Read 1 source findings

South Carolina government first-party announcement of August 29 2024 identifies Meta's only new Aiken County data center at Sage Mill Industrial Park by Graniteville, establishing that these three separately named originals describe the same already admitted physical project. Spring 2027 opening is a forecast, not proof of completed construction, present operation, actual IT megawatts or exact independently authorized coordinates. Evidence

Existing project record

research-final:SC:a2b66dae8725a8a368d1
Accepted facility identity linked

Genesis Digital Assets Anderson Bitcoin Mining Data Center

Anderson, SC · Genesis Digital Assets

Reported status: operational

Reported capacity: 18 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-10

Read 1 source findings (2026-10-30)

Current operator facility portfolio identifies the built Anderson IWS mining data center. Phase-two archive row 4279 is not a separate facility. Exact geography held; no city centroid used. Evidence

Existing project record

research-final:SC:46b486e9564cab30debc
Awaiting source review

Iws Anderson Data Center Project Phase 2

Anderson, SC

Reported status: under construction (EPA site-work record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:SC:403a0b1fd8c296899d62
Awaiting source review

Terra Nexus Ventures Camden Data Center

Camden, SC · Terra Nexus Ventures

Reported status: cancelled

Exact location not published.

Original source · 2026-06-15

research-final:SC:e0924cabd33dd19c9e53
Accepted facility identity linked

DartPoints Columbia Data Center

Columbia, SC · DartPoints

Reported status: operational (expansion)

Reported capacity: 2.5 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Read 1 source findings (2026-10-29)

Current operator identifies staffed colocation at the SCRA Innovation Center, Suite 180. Expansion is not counted as another facility and electrical capacities are not promoted. Evidence

Existing project record

research-final:SC:abe91b1a4b3a8c49fabf
Awaiting source review

Sc Computer Data Center

Columbia, SC

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

research-final:SC:1ddc81d2bc7bc2c42e89
Accepted facility identity linked

Cogent Fairfax Data Center

Fairfax, SC · Cogent Communications

Reported status: operational

Reported capacity: 2.08 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-27

Read 1 source findings (2026-10-29)

Operator explicitly lists its Fairfax data center at 831 North Hampton Avenue. Its service locator confirms ZIP 29827, correcting the office page typo 29287. Census places the directional after Avenue rather than before Hampton; exact normalized street is unresolved and no point is admitted. Evidence

Existing project record

research-final:SC:cd11c1340747d1c5c506
Existing facility identity linked

Cielo Digital Infrastructure

Gaffney, SC

Reported status: proposed

Reported capacity: 300.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Read 1 source findings

South Carolina government's June 24 2025 announcement identifies a single proposed Cielo campus in Cherokee County near Gaffney on Ford Road. Its four planned future buildings plus substation are not separately completed data centers, and these three source names do not constitute separate physical campuses. Estimated 2028 operation does not prove present commissioning, operating load, exact cleared geometry or new buildings. Evidence

Existing project record

research-final:SC:39f7940a942924ea161c
Existing facility identity linked

Cielo Digital Infrastructure Cherokee County Campus

Gaffney, SC · Cielo Digital Infrastructure

Reported status: proposed

Reported capacity: 300 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Gaffney. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Read 1 source findings

South Carolina government's June 24 2025 announcement identifies a single proposed Cielo campus in Cherokee County near Gaffney on Ford Road. Its four planned future buildings plus substation are not separately completed data centers, and these three source names do not constitute separate physical campuses. Estimated 2028 operation does not prove present commissioning, operating load, exact cleared geometry or new buildings. Evidence

Existing project record

research-final:SC:3889444490a9a490a35f
Existing facility identity linked

Cielo Digital Infrastructure Gaffney Campus

Gaffney, SC · Cielo Digital Infrastructure, LLC

Reported status: proposed

Reported capacity: 300 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-27

Read 1 source findings

South Carolina government's June 24 2025 announcement identifies a single proposed Cielo campus in Cherokee County near Gaffney on Ford Road. Its four planned future buildings plus substation are not separately completed data centers, and these three source names do not constitute separate physical campuses. Estimated 2028 operation does not prove present commissioning, operating load, exact cleared geometry or new buildings. Evidence

Existing project record

research-final:SC:d46bd0841ce94a5dd615
Awaiting source review

Google

Goose Creek, SC · Google LLC

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:SC:139974ab16fdaf3097a8
Existing facility identity linked

Meta Aiken Data Center

Graniteville, SC · Meta

Reported status: under construction

Reported capacity: 200 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-27

Read 1 source findings

South Carolina government first-party announcement of August 29 2024 identifies Meta's only new Aiken County data center at Sage Mill Industrial Park by Graniteville, establishing that these three separately named originals describe the same already admitted physical project. Spring 2027 opening is a forecast, not proof of completed construction, present operation, actual IT megawatts or exact independently authorized coordinates. Evidence

Existing project record

research-final:SC:9bc62b18efc0c2a1a2e5
Research database | Compute Equity Atlas