Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Awaiting source review

Amazon Data Services Creekside Campus

Cedar Creek area, TX · Amazon Data Services; Amazon Web Services

Reported status: proposed

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Cedar Creek. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

research-final:TX:eab29490cda4db484254
Awaiting source review

Childress Data Center

Childress, TX · IREN Limited

Reported status: operational

Reported capacity: 750.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:a8d5ada60bbb9399dc62
Awaiting source review

Crusoe and Lancium Childress AI data center campus

Childress, TX · Crusoe

Reported status: proposed

Exact location not published.

Original source · 2026-07-15

research-final:TX:44d5ca0f8a7293e53389
Awaiting source review

Crusoe Childress Data Center (Meta)

Childress, TX · Crusoe

Reported status: proposed

Exact location not published.

Original source · 2026-06-21

research-final:TX:0a80fcb05237439f5381
Accepted facility identity linked

IREN Childress data center campus

Childress, TX · IREN

Reported status: operational

Exact location not published.

Original source · 2026-08-27

Read 1 source findings (2026-10-30)

August 2026 issuer update confirms Horizon 1 delivered to Microsoft at Childress, while Horizon 2 commissioning and Horizon 3-4 construction remain distinct future stages. One operating campus identity includes ongoing development; no claim all planned AI buildings are live. Archive row 4590 is the same campus. Exact facility address remains unresolved in this pass. Evidence

Existing project record

research-final:TX:5adaa13f5f645dce66f8
Awaiting source review

IREN Horizon — Childress, TX

Childress, TX · IREN (Iris Energy)

Reported status: under construction

Reported capacity: 750 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

research-final:TX:55612e6e4934819e342f
Awaiting source review

Soluna Project Fei

Childress, TX · Soluna Holdings

Reported status: proposed

Reported capacity: 100 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-08-03

research-final:TX:75d65c43640847a2d8ff
Awaiting source review

Goodnight Campus

Claude, TX · Crusoe

Reported status: under construction

Reported capacity: 1030 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-24

research-final:TX:5c4eb48097c53921c198
Accepted facility identity linked

Crosspoint Data College Station

College Station, TX · Crosspoint Data, LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings (2026-10-30)

Current operator confirms active colocation in College Station and its street address. Carrier announcement independently confirms this former central office was converted into a data-center campus. Census returned no match, so no map point is admitted. Evidence

Existing project record

research-final:TX:6f4dba4133b4c0a7b79d
Awaiting source review

Project Aggie

College Station, TX · Priority Power Management (PPM Data LLC)

Reported status: rejected/denied

Reported capacity: 600 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-23

research-final:TX:ca06a92605bf176c70cf
Awaiting source review

Cipher Barber Lake Campus

Colorado City, TX · Cipher Digital

Reported status: under construction

Reported capacity: 300 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

research-final:TX:a0aee82b1bb7bef6b83a
Awaiting source review

Fluidstack

Colorado City, TX

Reported status: operational

Reported capacity: 300.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:484d91643aaa9058bc51
Awaiting source review

Digital Realty DFW44 — data hall 4 shell addition (Project Gold Phase 2)

Coppell, TX · Digital Realty

Reported status: proposed

Exact location not published.

Original source · 2026-09-24

research-final:TX:432a191c74da8d078712
Awaiting source review

Foremost Corpus Christi

Corpus Christi, TX · Foremost Telecommunications Corporation

Reported status: operational

Exact location not published.

Original source · 2025-09-26

research-final:TX:9c22c80eb9fedfb2a2a1
Awaiting source review

Peak Mining Texas 1 (Saxet Energy Park)

Corpus Christi, TX · Peak Mining

Reported status: operational

Reported capacity: 300 MW planned; 100 MW operational (scope and operation unverified)

Source reference: address match (exact): 1102 MCKINZIE RD, CORPUS CHRISTI, TX, 78410. Census Geocoder; not a verified facility pin.

Original source · 2026-08-05

research-final:TX:e14e98ddefddfb915e2c
Awaiting source review

Peak Mining Texas 2

Corpus Christi, TX · Peak Mining

Reported status: under construction

Reported capacity: 300 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-08-05

research-final:TX:c1d35a3516354f8ad095
Awaiting source review

RIOT

Corsicana, TX

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:TX:2246216affafc8421bce
Awaiting source review

Riot Platforms Corsicana Facility

Corsicana, TX · Riot Platforms

Reported status: operational

Reported capacity: 1000 MW planned; 400 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-07-06

research-final:TX:d503e4e2cae3b803d98d
Awaiting source review

Fort Hood data base

Coryell, TX

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

research-final:TX:a2d87c5bdf32b2790164
Awaiting source review

Cipher Reveille HPC Data Center

Cotulla, TX · Cipher Digital

Reported status: proposed

Reported capacity: 70 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

research-final:TX:ffd4341db06903ae9073
Awaiting source review

3HCloud - DFW-1

Dallas, TX · 3HCLOUD LLC

Reported status: operational

Exact location not published.

Original source · 2025-09-26

research-final:TX:cef0e4b8fd1063508e12
Accepted facility identity linked

Centersquare Dallas (DFW3)

Dallas, TX · CenterSquare (formerly Cyxtera)

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings (2026-10-30)

Current operator portfolio and specification sheet identify operating DFW3 at the full street address. Separate from Csquare Fort Worth already in the baseline. Utility nameplate is not treated as operating IT load. Evidence

Existing project record

research-final:TX:691c96fa4467f00cf5af
Awaiting source review

Colo4Dallas

Dallas, TX · Colo4Dallas

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:TX:5a44eb34bf293b1ab67c
Awaiting source review

ColoCrossing DFW1

Dallas, TX · ColoCrossing

Reported status: operational

Exact location not published.

Original source · 2025-09-26

research-final:TX:40df6121757e25864027
Accepted facility identity linked

Cologix - Dallas Infomart (DAL1, DAL2, DAL3)

Dallas, TX · Cologix

Reported status: operational

Reported capacity: 2.25 MW (scope and operation unverified)

Approximate locality: address match (exact): 1950 N STEMMONS FWY, DALLAS, TX, 75207. Census Geocoder; not a verified facility pin.

Original source · 2026-06-15

Read 1 source findings (2026-10-30)

One explicitly grouped operator location for DAL1, DAL2 and DAL3 within the same Infomart building. Archive rows 4614 through 4616 are component aliases and not additional admissions. Distinct operator premises from DataBank DFW5 and Equinix in the shared carrier hotel. Census point does not identify individual suites. Evidence

Existing project record

research-final:TX:14e1ba1488c65b8275cd
Awaiting source review

Cologix DAL1

Dallas, TX · Cologix, Inc.

Reported status: operational

Exact location not published.

Original source · 2025-09-26

research-final:TX:3f2270c15f24127e5df4
Awaiting source review

Cologix DAL2

Dallas, TX · Cologix, Inc.

Reported status: operational

Exact location not published.

Original source · 2025-09-26

research-final:TX:14f6ed4da1fee8d54221
Awaiting source review

Cologix DAL3

Dallas, TX · Cologix, Inc.

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:TX:0532ef7b0b3efc3bd752
Awaiting source review

CoreSpace Dallas

Dallas, TX · CoreSpace

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:TX:a42a198c708abb22e17d
Awaiting source review

Crow Holdings / CleanArc Central Dallas Campus

Dallas, TX · Crow Holdings; CleanArc Data Centers

Reported status: proposed

Reported capacity: 245 MW (scope and operation unverified)

Approximate locality: address match (exact): 2323 BRYAN ST, DALLAS, TX, 75201. Census Geocoder; not a verified facility pin.

Original source · 2026-07-17

research-final:TX:b68f3233ba3ab50e6735
Research database | Compute Equity Atlas