Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Awaiting source reviewAmazon Data Services Creekside Campus
Cedar Creek area, TX · Amazon Data Services; Amazon Web Services
Reported status: proposed
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Cedar Creek. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
research-final:TX:eab29490cda4db484254Awaiting source reviewChildress Data Center
Childress, TX · IREN Limited
Reported status: operational
Reported capacity: 750.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:a8d5ada60bbb9399dc62Awaiting source reviewCrusoe and Lancium Childress AI data center campus
Childress, TX · Crusoe
Reported status: proposed
Exact location not published.
Original source · 2026-07-15
research-final:TX:44d5ca0f8a7293e53389Awaiting source reviewCrusoe Childress Data Center (Meta)
Childress, TX · Crusoe
Reported status: proposed
Exact location not published.
Original source · 2026-06-21
research-final:TX:0a80fcb05237439f5381Accepted facility identity linkedIREN Childress data center campus
Childress, TX · IREN
Reported status: operational
Exact location not published.
Original source · 2026-08-27
Read 1 source findings (2026-10-30)
August 2026 issuer update confirms Horizon 1 delivered to Microsoft at Childress, while Horizon 2 commissioning and Horizon 3-4 construction remain distinct future stages. One operating campus identity includes ongoing development; no claim all planned AI buildings are live. Archive row 4590 is the same campus. Exact facility address remains unresolved in this pass. Evidence
Existing project record
research-final:TX:5adaa13f5f645dce66f8Awaiting source reviewIREN Horizon — Childress, TX
Childress, TX · IREN (Iris Energy)
Reported status: under construction
Reported capacity: 750 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
research-final:TX:55612e6e4934819e342fAwaiting source reviewSoluna Project Fei
Childress, TX · Soluna Holdings
Reported status: proposed
Reported capacity: 100 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-03
research-final:TX:75d65c43640847a2d8ffAwaiting source reviewGoodnight Campus
Claude, TX · Crusoe
Reported status: under construction
Reported capacity: 1030 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-24
research-final:TX:5c4eb48097c53921c198Accepted facility identity linkedCrosspoint Data College Station
College Station, TX · Crosspoint Data, LLC
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Read 1 source findings (2026-10-30)
Current operator confirms active colocation in College Station and its street address. Carrier announcement independently confirms this former central office was converted into a data-center campus. Census returned no match, so no map point is admitted. Evidence
Existing project record
research-final:TX:6f4dba4133b4c0a7b79dAwaiting source reviewProject Aggie
College Station, TX · Priority Power Management (PPM Data LLC)
Reported status: rejected/denied
Reported capacity: 600 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-23
research-final:TX:ca06a92605bf176c70cfAwaiting source reviewCipher Barber Lake Campus
Colorado City, TX · Cipher Digital
Reported status: under construction
Reported capacity: 300 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
research-final:TX:a0aee82b1bb7bef6b83aAwaiting source reviewFluidstack
Colorado City, TX
Reported status: operational
Reported capacity: 300.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:484d91643aaa9058bc51Awaiting source reviewDigital Realty DFW44 — data hall 4 shell addition (Project Gold Phase 2)
Coppell, TX · Digital Realty
Reported status: proposed
Exact location not published.
Original source · 2026-09-24
research-final:TX:432a191c74da8d078712Awaiting source reviewForemost Corpus Christi
Corpus Christi, TX · Foremost Telecommunications Corporation
Reported status: operational
Exact location not published.
Original source · 2025-09-26
research-final:TX:9c22c80eb9fedfb2a2a1Awaiting source reviewPeak Mining Texas 1 (Saxet Energy Park)
Corpus Christi, TX · Peak Mining
Reported status: operational
Reported capacity: 300 MW planned; 100 MW operational (scope and operation unverified)
Source reference: address match (exact): 1102 MCKINZIE RD, CORPUS CHRISTI, TX, 78410. Census Geocoder; not a verified facility pin.
Original source · 2026-08-05
research-final:TX:e14e98ddefddfb915e2cAwaiting source reviewPeak Mining Texas 2
Corpus Christi, TX · Peak Mining
Reported status: under construction
Reported capacity: 300 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-05
research-final:TX:c1d35a3516354f8ad095Awaiting source reviewRIOT
Corsicana, TX
Reported status: operational
Exact location not published.
Original source · 2026-06-17
research-final:TX:2246216affafc8421bceAwaiting source reviewRiot Platforms Corsicana Facility
Corsicana, TX · Riot Platforms
Reported status: operational
Reported capacity: 1000 MW planned; 400 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-07-06
research-final:TX:d503e4e2cae3b803d98dAwaiting source reviewFort Hood data base
Coryell, TX
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
research-final:TX:a2d87c5bdf32b2790164Awaiting source reviewCipher Reveille HPC Data Center
Cotulla, TX · Cipher Digital
Reported status: proposed
Reported capacity: 70 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
research-final:TX:ffd4341db06903ae9073Awaiting source review3HCloud - DFW-1
Dallas, TX · 3HCLOUD LLC
Reported status: operational
Exact location not published.
Original source · 2025-09-26
research-final:TX:cef0e4b8fd1063508e12Accepted facility identity linkedCentersquare Dallas (DFW3)
Dallas, TX · CenterSquare (formerly Cyxtera)
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Read 1 source findings (2026-10-30)
Current operator portfolio and specification sheet identify operating DFW3 at the full street address. Separate from Csquare Fort Worth already in the baseline. Utility nameplate is not treated as operating IT load. Evidence
Existing project record
research-final:TX:691c96fa4467f00cf5afAwaiting source reviewColo4Dallas
Dallas, TX · Colo4Dallas
Reported status: operational
Exact location not published.
Original source · 2026-06-17
research-final:TX:5a44eb34bf293b1ab67cAwaiting source reviewColoCrossing DFW1
Dallas, TX · ColoCrossing
Reported status: operational
Exact location not published.
Original source · 2025-09-26
research-final:TX:40df6121757e25864027Accepted facility identity linkedCologix - Dallas Infomart (DAL1, DAL2, DAL3)
Dallas, TX · Cologix
Reported status: operational
Reported capacity: 2.25 MW (scope and operation unverified)
Approximate locality: address match (exact): 1950 N STEMMONS FWY, DALLAS, TX, 75207. Census Geocoder; not a verified facility pin.
Original source · 2026-06-15
Read 1 source findings (2026-10-30)
One explicitly grouped operator location for DAL1, DAL2 and DAL3 within the same Infomart building. Archive rows 4614 through 4616 are component aliases and not additional admissions. Distinct operator premises from DataBank DFW5 and Equinix in the shared carrier hotel. Census point does not identify individual suites. Evidence
Existing project record
research-final:TX:14e1ba1488c65b8275cdAwaiting source reviewCologix DAL1
Dallas, TX · Cologix, Inc.
Reported status: operational
Exact location not published.
Original source · 2025-09-26
research-final:TX:3f2270c15f24127e5df4Awaiting source reviewCologix DAL2
Dallas, TX · Cologix, Inc.
Reported status: operational
Exact location not published.
Original source · 2025-09-26
research-final:TX:14f6ed4da1fee8d54221Awaiting source reviewCologix DAL3
Dallas, TX · Cologix, Inc.
Reported status: operational
Exact location not published.
Original source · 2026-06-17
research-final:TX:0532ef7b0b3efc3bd752Awaiting source reviewCoreSpace Dallas
Dallas, TX · CoreSpace
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
research-final:TX:a42a198c708abb22e17dAwaiting source reviewCrow Holdings / CleanArc Central Dallas Campus
Dallas, TX · Crow Holdings; CleanArc Data Centers
Reported status: proposed
Reported capacity: 245 MW (scope and operation unverified)
Approximate locality: address match (exact): 2323 BRYAN ST, DALLAS, TX, 75201. Census Geocoder; not a verified facility pin.
Original source · 2026-07-17
research-final:TX:b68f3233ba3ab50e6735