Soluna Project Ellen
Rio Hondo, TX · Soluna Holdings
Reported status: proposed
Reported capacity: 100 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-03
research-final:TX:64a3634a601f65eeb2cd6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.
Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Rio Hondo, TX · Soluna Holdings
Reported status: proposed
Reported capacity: 100 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-03
research-final:TX:64a3634a601f65eeb2cdRoanoke, TX
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
research-final:TX:4be0af2afda7f2fe4177Roanoke, TX
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
research-final:TX:513ba5ee3ec77d641a9aRoanoke, TX
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:70be4dddc19ae3242fa3Roanoke, TX
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:3225b86587c3ddd30005Roanoke, TX · Oncor
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:1c2e1d27173c3a620189Roanoke, TX
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:fbcca84380fbb638c132Roanoke, TX · Meta
Reported status: operational
Exact location not published.
Original source · 2026-08-12
research-final:TX:5328d7884afb814999abRoanoke, TX · Prime Data Centers
Reported status: existing (mapped + EPA facility record)
Exact location not published.
Original source · 2026-06-16
research-final:TX:8a788dd20e8594badb9eRoanoke, TX
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:5f66da42ad1f8bad9c50Robstown, TX
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:f08ebf97b14c1585e3c6Robstown, TX · Hut 8
Reported status: under construction
Reported capacity: 352 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
research-final:TX:cbf1951dbd82785b2265Rockdale, TX · Bitdeer
Reported status: operational
Reported capacity: 170 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-09-21
August 2026 issuer infrastructure table lists Rockdale electrical capacity online while potential AI conversion remains under active evaluation. This is an operating mining facility, not a claim of commissioned AI capacity. Distinct from Riot Whinstone; no shared municipal centroid or aggregate power is assigned. Evidence
Rockdale, TX · Riot Platforms
Reported status: operational
Reported capacity: 750 MW planned; 450 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
Current operator page confirms operating Rockdale campus. August 2026 results distinguish delivered initial AMD deployment from future AMD expansion and a new frontier-AI lease. These future phases are not separately admitted as operating. Submitted facility address returned no Census match, so no map point is published. Evidence
Rollingwood, TX · CyrusOne LLC
Reported status: operational
Reported capacity: 24.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:f93092fcf6d81bad799dRollingwood, TX · LightEdge Solutions
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Current operator lists operating Austin 1 at 2916 Montopolis Drive, Suite 300. Correct locality is Austin, not the source archive Rollingwood label. No separate tenant-suite point is created. Evidence
Rollingwood, TX
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-02-09
research-final:TX:e3893d37955c4da5911bRound Rock, TX · Amazon Web Services
Reported status: proposed
Reported capacity: 50 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Round Rock. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
research-final:TX:e7e92247abd277d736b3Round Rock, TX · Sabey Data Centers
Reported status: operational
Reported capacity: 84 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-14
research-final:TX:41493d5456e8cdfebd15Round Rock, TX · Skybox Datacenters
Reported status: under construction
Reported capacity: 40.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:9bc3b3a1b70c0631e2c8Round Rock, TX · Switch
Reported status: under construction
Reported capacity: 185 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-16
research-final:TX:477aad16303c748a82b1Royse City, TX · BT Gateway Data Center LLC; Belltown Power-linked affiliate
Reported status: proposed
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Royse City. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-17
research-final:TX:0c68e87881bf1f19c5aeRoyse City, TX
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:c7ec6f1a96e12471d1f0Saginaw, TX · Coravel
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:3e3539ac54bd762bf64bSaginaw, TX · CyrusOne
Reported status: proposed
Exact location not published.
Original source · 2026-09-24
research-final:TX:8f427cce59e09b006fdaSan Angelo, TX · Cipher Digital
Reported status: proposed
Reported capacity: 1000 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-21
research-final:TX:6d1e689588e8d93a1cabSan Angelo, TX
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
research-final:TX:bb7a870e9e75854a55e3San Angelo (Tankersley area, unincorporated), TX · Beacon Data Centers (via Westline TX Holdings)
Reported status: proposed
Exact location not published.
Original source · 2026-09-21
research-final:TX:738326b32c73b436cdc0San Antonio, TX
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:d0d6b0c5850184e42200San Antonio, TX · Amazon Web Services
Reported status: operational
Reported capacity: 12 MW (scope and operation unverified)
Approximate locality: address match (exact): 7400 POTRANCO RD, SAN ANTONIO, TX, 78251. Census Geocoder; not a verified facility pin.
Original source · 2026-06-15
research-final:TX:7a8a21d7d412da13f3ac