Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Accepted facility identity linkedValorC3 Boise Data Center (former Fiberpipe)
Boise, ID · ValorC3 Data Centers
Reported status: operational
Reported capacity: 2 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-10-04
Review note: First-party operating Boise BOI-1 at 10215 W Emerald St; already prior published follow-on root, not a new facility or new map point.
Read 2 source findings (2026-10-31)
First-party operating Boise BOI-1 at 10215 W Emerald St; already prior published follow-on root, not a new facility or new map point. Evidence
Operator confirms active BOI-1 colocation at 10215 W Emerald Street with existing DC2/DC3 halls. This is distinct from the existing Boise Facility 2 record and 10 MW new-build placeholder: BOI-2 facility page explicitly targets 2027 opening. Census removes the primary address W directional, so geometry remains held. Published power specifications are not measured operating consumption. Evidence
Existing project record
research-final:ID:5ec2284f6e4e20e080aaReview notes availableValorC3 Data Centers - Boise Facility 2
Boise, ID · ValorC3 Data Centers; CVC DIF; Apterra Infrastructure Capital
Reported status: under construction
Reported capacity: 10 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Review note: First-party page says BOI-2 opens in 2027; BOI-1 operating claim must not imply BOI-2 operating, nor 10MW projected power become measured current IT MW.
Read 1 source findings (2026-10-31)
First-party page says BOI-2 opens in 2027; BOI-1 operating claim must not imply BOI-2 operating, nor 10MW projected power become measured current IT MW. Evidence
research-final:ID:52847a07c34ebd79216bReview notes availableIccu Campus Expansion And Data Center
Chubbuck, ID
Reported status: under construction (EPA site-work record)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Original ID1532 "Iccu Campus Expansion And Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:bd965e004a7d20f0d1f2Review notes availableCRALIDXX - Coeur d'Alene Central Office
Coeur d'Alene, ID · Ziply Fiber
Reported status: operational
Exact location not published.
Original source · 2026-06-18
Review note: Original ID1533 "CRALIDXX - Coeur d'Alene Central Office" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:5fb03f3907760dd72251Review notes availableNeutron Coeur d'Alene
Coeur d'Alene, ID · Neutron LLC
Reported status: operational
Exact location not published.
Original source · 2026-10-04
Review note: Original ID1534 "Neutron Coeur d'Alene" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:ccd825242c759d20a117Review notes availableOrbitCom Coeur d'Alene Data Center
Coeur d'Alene, ID · OrbitCom
Reported status: operational
Exact location not published.
Original source · 2026-09-12
Review note: Original ID1535 "OrbitCom Coeur d'Alene Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:c88335c048148993fe25Review notes availableU S Bank Coeur D'Alene Data Center
Coeur D'Alene, ID
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Original ID1536 "U S Bank Coeur D'Alene Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:1158b37b679f1316ff2fReview notes availableDeep Atomic INL Data Center
Idaho Falls, ID · Deep Atomic; Parker Tide LLC; Clayco; Gleeds; Paragon Energy Solutions; EvapCo Dry Cooling; Bedrock Labs; Azimuth Renewables; Future-Tech; MoonliteAI
Reported status: proposed
Reported capacity: 60 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-19
Review note: Original ID1537 "Deep Atomic INL Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:6dcbb8788a0d8f9076feAccepted facility identity linkedIdaho National Laboratory Collaborative Computing Center (C3)
Idaho Falls, ID · Idaho National Laboratory (U.S. Department of Energy)
Reported status: operational
Reported capacity: 4 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-09-21
Review note: INL opened the C3 facility in 2019; site already published as prior exact canonical root. No new street pin from generic INL address.
Read 2 source findings (2026-10-31)
INL opened the C3 facility in 2019; site already published as prior exact canonical root. No new street pin from generic INL address. Evidence
INL identifies active scientific computing and visualization at C3. Its architect and builder identify the completed Idaho Falls building. No facility-specific street point was verified, so this identity stays unmapped; the general INL mailing address is not used. Evidence
Existing project record
research-final:ID:e469a7128daba6a4aa38Review notes availableBrisbie Llc
Kuna, ID
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Original ID1539 "Brisbie Llc" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:52d8362c8120cdac4859Review notes availableDiode Ventures Gemstone Technology Park
Kuna, ID · Diode Ventures; Black & Veatch; Gemstone Technology Park LLC
Reported status: proposed
Reported capacity: 700 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Kuna. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
Review note: Original ID1540 "Diode Ventures Gemstone Technology Park" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:e8e5567bae560c467a88Review notes availableMeta Kuna Data Center
Kuna, ID · Meta Platforms Inc.
Reported status: under construction
Reported capacity: 60 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
Review note: Meta says Kuna data center online September 3, 2026; reconcile existing campus canonical rather than invent phase or new site.
Read 1 source findings (2026-10-31)
Meta says Kuna data center online September 3, 2026; reconcile existing campus canonical rather than invent phase or new site. Evidence
research-final:ID:3d9d29da64bf28c30f57Review notes availableFamily History Center
Montpelier, ID · The Church of Jesus Christ of Latter-day Saints
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Original ID1542 "Family History Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:06eaebdb7b68b1b7ec3eReview notes availableT5 Data Centers - Nampa
Nampa, ID · T5 Data Centers
Reported status: under construction
Reported capacity: 8.25 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
Review note: Original ID1543 "T5 Data Centers - Nampa" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:e8dcf8912739f4b312e3Review notes availablePeak Digital Solutions – Orofino Facility
Orofino, ID · T-REX Acquisition Corp (Peak Digital Solutions LLC)
Reported status: operational
Exact location not published.
Original source · 2026-08-05
Review note: Original ID1544 "Peak Digital Solutions – Orofino Facility" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:b8da4e7da2774619e1f3Review notes availableFBI Grey Wolf Data Center
Pocatello, ID · Federal Bureau of Investigation; U.S. Department of Justice
Reported status: operational
Reported capacity: 5.4 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
Review note: Original ID1545 "FBI Grey Wolf Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:ab678f92e7e92671ba48Review notes availableLex Developments Pocatello AI Data Center
Pocatello, ID · Lex Developments LLC; Portneuf Capital LLC
Reported status: cancelled
Reported capacity: 100 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Pocatello. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-17
Review note: Original ID1546 "Lex Developments Pocatello AI Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:48bf72f8e2ef804803afReview notes availableVentureData
Rexburg, ID
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Original ID1547 "VentureData" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:f19e4da16489fd0063fbReview notes availableUnnamed research feature in ID
, ID
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
Review note: Original ID1548 "" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:317f621772e18f235cf0Review notes availableAalo Project Ascension On-Site Data Center
, ID · Aalo Atomics; Idaho National Laboratory; U.S. Department of Energy
Reported status: under construction
Reported capacity: 10 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Review note: Original ID1549 "Aalo Project Ascension On-Site Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:65ef780c3fc2601856f9Review notes availableDeep Atomic MK60 Nuclear-Powered AI Data Center Campus (Idaho National Laboratory)
, ID · Deep Atomic
Reported status: proposed
Exact location not published.
Original source · 2026-10-21
Review note: Original ID1550 "Deep Atomic MK60 Nuclear-Powered AI Data Center Campus (Idaho National Laboratory)" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:27bd3a9fbefcc71b555bReview notes availableRhea Data Blacks Creek Campus
, ID · Rhea Data (subsidiary of Arevia Power)
Reported status: proposed
Reported capacity: 600 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-04
Review note: Original ID1551 "Rhea Data Blacks Creek Campus" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:076ad744e807abd2f2d5Review notes availableTerraVolt Southeast Idaho Data Center Campus (Raft River)
, ID · TerraVolt Infrastructure, Inc. (subsidiary of CalEthos, Inc.)
Reported status: proposed
Exact location not published.
Original source · 2026-10-04
Review note: Original ID1552 "TerraVolt Southeast Idaho Data Center Campus (Raft River)" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:1ab1d0bc8ce883509952Review notes availableUnnamed source-mapped location
, ID
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-02-09
Review note: Original ID1553 "Unnamed source-mapped location" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.
research-final:ID:f6c565f43eda83c6489dReview notes availableNETRIX - ALSIP
Alsip, IL · Netrix, LLC
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: Original source record inspected; current independent site/operator evidence and exact campus/tenant/collision mapping remain unresolved. Neither archive operating status nor supplied coordinates are adopted.
research-final:IL:4e914cd95f9d218c4851Accepted facility identity linkedGigeNET CHI3
Arlington Heights, IL · GigeNET
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: Current GigeNET operator confirms operating Chicago facility; source is the exact root of a prior accepted admission.
Read 2 source findings (2026-10-31)
Current GigeNET operator confirms operating Chicago facility; source is the exact root of a prior accepted admission. Evidence
Current operator identifies Chicago as its active flagship facility housing headquarters and onsite NOC. Its contact page gives the headquarters street address; Suite D is not parcel geometry. Current colocation offering confirms active service. No cabinet pricing or facility specification is treated as measured power. Evidence
Existing project record
research-final:IL:6f33133e76ef95dfbd82Existing facility identity linkedAgile Aurora
Aurora, IL · Agile Data Sites
Reported status: operational
Exact location not published.
Original source · 2025-09-26
Review note: Original Agile site at 4267 Meridian Parkway resolves to the same building currently operated as US Signal IL02. Historic predecessor lineage merits a source-only link, not a new facility.
Read 2 source findings (2026-10-31)
Original Agile site at 4267 Meridian Parkway resolves to the same building currently operated as US Signal IL02. Historic predecessor lineage merits a source-only link, not a new facility. Evidence
Original Agile site at 4267 Meridian Parkway resolves to the same building currently operated as US Signal IL02. Historic predecessor lineage merits a source-only link, not a new facility. Evidence
Existing project record
research-final:IL:89f79f5013646daf4863Review notes availableCyrusOne Aurora Campus
Aurora, IL · CyrusOne
Reported status: under construction
Reported capacity: 40 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Source 2024 two-building 446k sq ft development may match CyrusOne CHI9 second Aurora campus, explicitly separate from first CHI1-CHI3 campus. Do not apply first campus 114 MW.
Read 2 source findings (2026-10-31)
Source 2024 two-building 446k sq ft development may match CyrusOne CHI9 second Aurora campus, explicitly separate from first CHI1-CHI3 campus. Do not apply first campus 114 MW. Evidence
Source 2024 two-building 446k sq ft development may match CyrusOne CHI9 second Aurora campus, explicitly separate from first CHI1-CHI3 campus. Do not apply first campus 114 MW. Evidence
research-final:IL:f0cc1ece78b8cf323b44Review notes availableCyrusOne CHI1-CHI3 (Aurora)
Aurora, IL · CyrusOne
Reported status: operational
Reported capacity: 109 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-10-15
Review note: CyrusOne first-party confirms operating CHI1/CHI2/CHI3 on its original Aurora campus; campus total cannot be assigned to a constituent building.
Read 2 source findings (2026-10-31)
CyrusOne first-party confirms operating CHI1/CHI2/CHI3 on its original Aurora campus; campus total cannot be assigned to a constituent building. Evidence
CyrusOne first-party confirms operating CHI1/CHI2/CHI3 on its original Aurora campus; campus total cannot be assigned to a constituent building. Evidence
research-final:IL:c49d7c904ecd889c1ce5Review notes availableCyrusOne Chicago Aurora CME
Aurora, IL · CyrusOne LLC
Reported status: operational
Reported capacity: 58.40 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: CME sold and leased back its Aurora data center to CyrusOne in 2016; CME colocation tenant is not a second campus building.
Read 1 source findings (2026-10-31)
CME sold and leased back its Aurora data center to CyrusOne in 2016; CME colocation tenant is not a second campus building. Evidence
research-final:IL:44c595c14271e3c34e3f