Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Accepted facility identity linked

ValorC3 Boise Data Center (former Fiberpipe)

Boise, ID · ValorC3 Data Centers

Reported status: operational

Reported capacity: 2 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-04

Review note: First-party operating Boise BOI-1 at 10215 W Emerald St; already prior published follow-on root, not a new facility or new map point.

Read 2 source findings (2026-10-31)

First-party operating Boise BOI-1 at 10215 W Emerald St; already prior published follow-on root, not a new facility or new map point. Evidence

Operator confirms active BOI-1 colocation at 10215 W Emerald Street with existing DC2/DC3 halls. This is distinct from the existing Boise Facility 2 record and 10 MW new-build placeholder: BOI-2 facility page explicitly targets 2027 opening. Census removes the primary address W directional, so geometry remains held. Published power specifications are not measured operating consumption. Evidence

Existing project record

research-final:ID:5ec2284f6e4e20e080aa
Review notes available

ValorC3 Data Centers - Boise Facility 2

Boise, ID · ValorC3 Data Centers; CVC DIF; Apterra Infrastructure Capital

Reported status: under construction

Reported capacity: 10 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

Review note: First-party page says BOI-2 opens in 2027; BOI-1 operating claim must not imply BOI-2 operating, nor 10MW projected power become measured current IT MW.

Read 1 source findings (2026-10-31)

First-party page says BOI-2 opens in 2027; BOI-1 operating claim must not imply BOI-2 operating, nor 10MW projected power become measured current IT MW. Evidence

research-final:ID:52847a07c34ebd79216b
Review notes available

Iccu Campus Expansion And Data Center

Chubbuck, ID

Reported status: under construction (EPA site-work record)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Original ID1532 "Iccu Campus Expansion And Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:bd965e004a7d20f0d1f2
Review notes available

CRALIDXX - Coeur d'Alene Central Office

Coeur d'Alene, ID · Ziply Fiber

Reported status: operational

Exact location not published.

Original source · 2026-06-18

Review note: Original ID1533 "CRALIDXX - Coeur d'Alene Central Office" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:5fb03f3907760dd72251
Review notes available

Neutron Coeur d'Alene

Coeur d'Alene, ID · Neutron LLC

Reported status: operational

Exact location not published.

Original source · 2026-10-04

Review note: Original ID1534 "Neutron Coeur d'Alene" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:ccd825242c759d20a117
Review notes available

OrbitCom Coeur d'Alene Data Center

Coeur d'Alene, ID · OrbitCom

Reported status: operational

Exact location not published.

Original source · 2026-09-12

Review note: Original ID1535 "OrbitCom Coeur d'Alene Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:c88335c048148993fe25
Review notes available

U S Bank Coeur D'Alene Data Center

Coeur D'Alene, ID

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Original ID1536 "U S Bank Coeur D'Alene Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:1158b37b679f1316ff2f
Review notes available

Deep Atomic INL Data Center

Idaho Falls, ID · Deep Atomic; Parker Tide LLC; Clayco; Gleeds; Paragon Energy Solutions; EvapCo Dry Cooling; Bedrock Labs; Azimuth Renewables; Future-Tech; MoonliteAI

Reported status: proposed

Reported capacity: 60 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-19

Review note: Original ID1537 "Deep Atomic INL Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:6dcbb8788a0d8f9076fe
Accepted facility identity linked

Idaho National Laboratory Collaborative Computing Center (C3)

Idaho Falls, ID · Idaho National Laboratory (U.S. Department of Energy)

Reported status: operational

Reported capacity: 4 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-21

Review note: INL opened the C3 facility in 2019; site already published as prior exact canonical root. No new street pin from generic INL address.

Read 2 source findings (2026-10-31)

INL opened the C3 facility in 2019; site already published as prior exact canonical root. No new street pin from generic INL address. Evidence

INL identifies active scientific computing and visualization at C3. Its architect and builder identify the completed Idaho Falls building. No facility-specific street point was verified, so this identity stays unmapped; the general INL mailing address is not used. Evidence

Existing project record

research-final:ID:e469a7128daba6a4aa38
Review notes available

Brisbie Llc

Kuna, ID

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Original ID1539 "Brisbie Llc" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:52d8362c8120cdac4859
Review notes available

Diode Ventures Gemstone Technology Park

Kuna, ID · Diode Ventures; Black & Veatch; Gemstone Technology Park LLC

Reported status: proposed

Reported capacity: 700 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Kuna. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Review note: Original ID1540 "Diode Ventures Gemstone Technology Park" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:e8e5567bae560c467a88
Review notes available

Meta Kuna Data Center

Kuna, ID · Meta Platforms Inc.

Reported status: under construction

Reported capacity: 60 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

Review note: Meta says Kuna data center online September 3, 2026; reconcile existing campus canonical rather than invent phase or new site.

Read 1 source findings (2026-10-31)

Meta says Kuna data center online September 3, 2026; reconcile existing campus canonical rather than invent phase or new site. Evidence

research-final:ID:3d9d29da64bf28c30f57
Review notes available

Family History Center

Montpelier, ID · The Church of Jesus Christ of Latter-day Saints

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Original ID1542 "Family History Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:06eaebdb7b68b1b7ec3e
Review notes available

T5 Data Centers - Nampa

Nampa, ID · T5 Data Centers

Reported status: under construction

Reported capacity: 8.25 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

Review note: Original ID1543 "T5 Data Centers - Nampa" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:e8dcf8912739f4b312e3
Review notes available

Peak Digital Solutions – Orofino Facility

Orofino, ID · T-REX Acquisition Corp (Peak Digital Solutions LLC)

Reported status: operational

Exact location not published.

Original source · 2026-08-05

Review note: Original ID1544 "Peak Digital Solutions – Orofino Facility" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:b8da4e7da2774619e1f3
Review notes available

FBI Grey Wolf Data Center

Pocatello, ID · Federal Bureau of Investigation; U.S. Department of Justice

Reported status: operational

Reported capacity: 5.4 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

Review note: Original ID1545 "FBI Grey Wolf Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:ab678f92e7e92671ba48
Review notes available

Lex Developments Pocatello AI Data Center

Pocatello, ID · Lex Developments LLC; Portneuf Capital LLC

Reported status: cancelled

Reported capacity: 100 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Pocatello. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-17

Review note: Original ID1546 "Lex Developments Pocatello AI Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:48bf72f8e2ef804803af
Review notes available

VentureData

Rexburg, ID

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Original ID1547 "VentureData" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:f19e4da16489fd0063fb
Review notes available

Unnamed research feature in ID

, ID

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10 (QLever osm-planet)

Review note: Original ID1548 "" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:317f621772e18f235cf0
Review notes available

Aalo Project Ascension On-Site Data Center

, ID · Aalo Atomics; Idaho National Laboratory; U.S. Department of Energy

Reported status: under construction

Reported capacity: 10 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

Review note: Original ID1549 "Aalo Project Ascension On-Site Data Center" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:65ef780c3fc2601856f9
Review notes available

Deep Atomic MK60 Nuclear-Powered AI Data Center Campus (Idaho National Laboratory)

, ID · Deep Atomic

Reported status: proposed

Exact location not published.

Original source · 2026-10-21

Review note: Original ID1550 "Deep Atomic MK60 Nuclear-Powered AI Data Center Campus (Idaho National Laboratory)" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:27bd3a9fbefcc71b555b
Review notes available

Rhea Data Blacks Creek Campus

, ID · Rhea Data (subsidiary of Arevia Power)

Reported status: proposed

Reported capacity: 600 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-04

Review note: Original ID1551 "Rhea Data Blacks Creek Campus" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:076ad744e807abd2f2d5
Review notes available

TerraVolt Southeast Idaho Data Center Campus (Raft River)

, ID · TerraVolt Infrastructure, Inc. (subsidiary of CalEthos, Inc.)

Reported status: proposed

Exact location not published.

Original source · 2026-10-04

Review note: Original ID1552 "TerraVolt Southeast Idaho Data Center Campus (Raft River)" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:1ab1d0bc8ce883509952
Review notes available

Unnamed source-mapped location

, ID

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

Review note: Original ID1553 "Unnamed source-mapped location" retains independent operator, exact-building/campus and rights checks before any canonical publication; generic source name, supplier status and coordinates do not establish operating facility.

research-final:ID:f6c565f43eda83c6489d
Review notes available

NETRIX - ALSIP

Alsip, IL · Netrix, LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Original source record inspected; current independent site/operator evidence and exact campus/tenant/collision mapping remain unresolved. Neither archive operating status nor supplied coordinates are adopted.

research-final:IL:4e914cd95f9d218c4851
Accepted facility identity linked

GigeNET CHI3

Arlington Heights, IL · GigeNET

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Current GigeNET operator confirms operating Chicago facility; source is the exact root of a prior accepted admission.

Read 2 source findings (2026-10-31)

Current GigeNET operator confirms operating Chicago facility; source is the exact root of a prior accepted admission. Evidence

Current operator identifies Chicago as its active flagship facility housing headquarters and onsite NOC. Its contact page gives the headquarters street address; Suite D is not parcel geometry. Current colocation offering confirms active service. No cabinet pricing or facility specification is treated as measured power. Evidence

Existing project record

research-final:IL:6f33133e76ef95dfbd82
Existing facility identity linked

Agile Aurora

Aurora, IL · Agile Data Sites

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Review note: Original Agile site at 4267 Meridian Parkway resolves to the same building currently operated as US Signal IL02. Historic predecessor lineage merits a source-only link, not a new facility.

Read 2 source findings (2026-10-31)

Original Agile site at 4267 Meridian Parkway resolves to the same building currently operated as US Signal IL02. Historic predecessor lineage merits a source-only link, not a new facility. Evidence

Original Agile site at 4267 Meridian Parkway resolves to the same building currently operated as US Signal IL02. Historic predecessor lineage merits a source-only link, not a new facility. Evidence

Existing project record

research-final:IL:89f79f5013646daf4863
Review notes available

CyrusOne Aurora Campus

Aurora, IL · CyrusOne

Reported status: under construction

Reported capacity: 40 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Source 2024 two-building 446k sq ft development may match CyrusOne CHI9 second Aurora campus, explicitly separate from first CHI1-CHI3 campus. Do not apply first campus 114 MW.

Read 2 source findings (2026-10-31)

Source 2024 two-building 446k sq ft development may match CyrusOne CHI9 second Aurora campus, explicitly separate from first CHI1-CHI3 campus. Do not apply first campus 114 MW. Evidence

Source 2024 two-building 446k sq ft development may match CyrusOne CHI9 second Aurora campus, explicitly separate from first CHI1-CHI3 campus. Do not apply first campus 114 MW. Evidence

research-final:IL:f0cc1ece78b8cf323b44
Review notes available

CyrusOne CHI1-CHI3 (Aurora)

Aurora, IL · CyrusOne

Reported status: operational

Reported capacity: 109 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-15

Review note: CyrusOne first-party confirms operating CHI1/CHI2/CHI3 on its original Aurora campus; campus total cannot be assigned to a constituent building.

Read 2 source findings (2026-10-31)

CyrusOne first-party confirms operating CHI1/CHI2/CHI3 on its original Aurora campus; campus total cannot be assigned to a constituent building. Evidence

CyrusOne first-party confirms operating CHI1/CHI2/CHI3 on its original Aurora campus; campus total cannot be assigned to a constituent building. Evidence

research-final:IL:c49d7c904ecd889c1ce5
Review notes available

CyrusOne Chicago Aurora CME

Aurora, IL · CyrusOne LLC

Reported status: operational

Reported capacity: 58.40 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: CME sold and leased back its Aurora data center to CyrusOne in 2016; CME colocation tenant is not a second campus building.

Read 1 source findings (2026-10-31)

CME sold and leased back its Aurora data center to CyrusOne in 2016; CME colocation tenant is not a second campus building. Evidence

research-final:IL:44c595c14271e3c34e3f
Research database | Compute Equity Atlas