CyrusOne Data Center

Yorkville, IL

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Review note: CyrusOne Yorkville Technology Campus: operator confirms site work started early 2026, first building target late 2027 and operations 2028. CSV1739 misclassified city Plano by nearest Census, this is Yorkville; four source rows one campus, not 4 operating buildings.

Read 1 source findings (2026-10-31)

CyrusOne Yorkville Technology Campus: operator confirms site work started early 2026, first building target late 2027 and operations 2028. CSV1739 misclassified city Plano by nearest Census, this is Yorkville; four source rows one campus, not 4 operating buildings. Evidence

research-final:IL:d2e356f473205c5d7111
Review notes available

Pioneer Development - Yorkville Project Cardinal

Yorkville, IL · Pioneer Development, LLC

Reported status: proposed

Reported capacity: 1.8 GW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

Review note: Pioneer/Project Cardinal 1,037 acre Yorkville proposal is not CyrusOne Yorkville and not Prologis Project Steel; developer, phase and current entitlements must remain separate.

research-final:IL:5b6723c5ec8c9c5aadbc
Review notes available

Prologis - Yorkville Project Steel

Yorkville, IL · Prologis, L.P.

Reported status: proposed

Reported capacity: 680 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

Review note: Prologis Yorkville Project Steel 540 acres is not Pioneer Project Cardinal and not CyrusOne Yorkville Technology Campus; no operating buildings inferred from approval.

research-final:IL:0fb4f4ddfaf0a90e5df5
Review notes available

Yorkville Nexus V - Meyer Data Center

Yorkville, IL · Yorkville Nexus V LLC; Green Door Capital

Reported status: cancelled

Reported capacity: 400 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Yorkville. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-17

Review note: Yorkville Nexus V/Meyer supplier labels canceled; retain rights-checked research source but independently confirm cancellation before issuing final project nonpromotion.

research-final:IL:2e7e15576be525b2bbae
Review notes available

Decennial Group Akron Data Center

Akron, IN · Decennial Group

Reported status: proposed

Exact location not published.

Original source · 2026-09-13

Review note: Decennial Group Akron/Fulton County 300-acre plan is a proposed site, not a confirmed operating building; project proponent entitlement, site ownership, municipality and timeline required.

research-final:IN:0ba5cf63a2924f32c2e8
Review notes available

Google Franklin Township data center proposal (Project Flo)

Beech Grove, IN

Reported status: cancelled

Exact location not published.

Original source · 2025-09-22

Review note: Four original names are one 468-acre Google-affiliate Deep Meadow Ventures Project Flo proposal along I-74/Post Road in Franklin Township, **Indianapolis**, not Beech Grove. Filed formal withdrawal of rezoning in September/October 2025, no constructed center. Do not conflate with Google's Fort Wayne campus or count buildings.

research-final:IN:36bffb301882cbe99ba1
Accepted facility identity linked

Indiana University Data Center

Bloomington, IN · Indiana University

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Review note: Indiana University Bloomington facility original CSV1776 is accepted canonical root reviewed:iu-bloomington-in-20261029. CSV1777 OSM 'IU Data Center' is not independent company 'Prime Data Centers' ownership nor transferable geometry. Reconcile same building vs other university site before linking.

Read 1 source findings (2026-10-31)

Current university data-center services page confirms operation and the Discovery Parkway address. Exact Census query has no match; the older 10th Street archive address and supplier point are not substituted. Evidence

Existing project record

research-final:IN:66820e731808861d02e5
Review notes available

IU Data Center

Bloomington, IN · Prime Data Centers

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Indiana University Bloomington facility original CSV1776 is accepted canonical root reviewed:iu-bloomington-in-20261029. CSV1777 OSM 'IU Data Center' is not independent company 'Prime Data Centers' ownership nor transferable geometry. Reconcile same building vs other university site before linking.

research-final:IN:ebe3d944159c9eed4e86
Review notes available

Bristol Innovation Park

Bristol, IN · The Province Group

Reported status: cancelled

Exact location not published.

Original source · 2026-09-13

Review note: Province Group 247-acre farmland Bristol Innovation Park proposal includes multiple planned halls; require Elkhart County disposition and unique campus/phase; no operation or parcel point assumed.

research-final:IN:38ba0cb10272ff016efb
Review notes available

Provident Burns Harbor Data Center Campus (Worthington Steel property)

Burns Harbor, IN · Provident Realty Advisors

Reported status: proposed

Exact location not published.

Original source · 2026-10-16

Review note: Provident Burns Harbor site on Worthington Steel property is a separate project from the **withdrawn Chesterton Brassie** plan. Do not propagate Chesterton withdrawal to distinct Burns Harbor without land permit and primary rights evidence.

research-final:IN:93c29d5e87ee0358e1c3
Accepted facility identity linked

Expedient Indianapolis

Carmel, IN · Expedient, LLC

Reported status: operational

Reported capacity: 4.40 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: Expedient first-party lists its Indianapolis IND1 data center at 701 Congressional Blvd, Carmel, and data hall/support. Existing accepted canonical reviewed:expedient-ind1-in-20261029; no second building. Current address independently confirmed.

Read 2 source findings (2026-10-31)

Expedient first-party lists its Indianapolis IND1 data center at 701 Congressional Blvd, Carmel, and data hall/support. Existing accepted canonical reviewed:expedient-ind1-in-20261029; no second building. Current address independently confirmed. Evidence

Current operator lists the Indianapolis-market data center in Carmel with round-the-clock operations support. Physical building address is verified; suite 100 is the operator suite. Evidence

Existing project record

research-final:IN:051f17340c60bf56ac95
Review notes available

Charlestown Data Center

Charlestown, IN

Reported status: proposed

Exact location not published.

Original source · 2026-06-17

Review note: Generic Charlestown proposal/news with no operator does not independently prove unique physical site, ownership or phase. Keep separate from QLEVR and Meta Jeffersonville pending exact parcel.

research-final:IN:8678eb839b6c7307d0ee
Review notes available

Meta Jeffersonville (proposed)

Charlestown, IN · Facebook USA, Inc.

Reported status: proposed

Reported capacity: 407.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-21

Review note: Meta Jeffersonville proposal source nearest-Census city Charlestown is not primary Meta site evidence; need current first-party exact project identity; do not merge into Meta Lebanon.

research-final:IN:1d26fcd71bc190609751
Review notes available

QLEVR Charlestown Data Center

Charlestown, IN · QLEVR LLC

Reported status: approved/permitted

Reported capacity: 3 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-16

Review note: QLEVR Shadow Lake Industrial Park 55k sqft/3MW supply is projected design not confirmed 2026 operating draw; hold phased site and source location.

research-final:IN:d937a0982e07f4d29e74
Review notes available

Provident Realty Advisors

Chesteron, IN

Reported status: cancelled

Exact location not published.

Original source · 2026-06-18

Review note: Provident withdrew the town application for proposed Chesterton former Brassie Golf Club ~200-acre eight-building campus. Two supplier rows one withdrawn project, not Burns Harbor and not 8 operating sites.

research-final:IN:df2c6fb3ba4c3a6cfd8a
Review notes available

Provident Chesterton Data Center Campus (former Brassie Golf Club)

Chesterton, IN · Provident Realty Advisors

Reported status: cancelled

Source reference: address match (exact): 1110 PEARSON RD, CHESTERTON, IN, 46304. Census Geocoder; not a verified facility pin.

Original source · 2026-09-13

Review note: Provident withdrew the town application for proposed Chesterton former Brassie Golf Club ~200-acre eight-building campus. Two supplier rows one withdrawn project, not Burns Harbor and not 8 operating sites.

research-final:IN:89ed7006f326e328e7c8
Review notes available

Unnamed research feature in Columbus

Columbus, IN

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10-28

Review note: Unnamed OSM facility in Columbus cannot prove separate physical operator and geometry is not licensed for user public reference layer.

research-final:IN:1b5280fb797530fa7f14
Accepted facility identity linked

DartPoints Columbus, IN - CLU1

Columbus, IN · DartPoints, LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-18

Review note: DartPoints first-party verifies CLU01 at 2425 Technology Blvd Columbus and 735 kW critical IT **rated capacity**. Root already accepted as reviewed:dartpoints-clu01-in-20261029; no second facility or actual measured consumption.

Read 2 source findings (2026-10-31)

DartPoints first-party verifies CLU01 at 2425 Technology Blvd Columbus and 735 kW critical IT **rated capacity**. Root already accepted as reviewed:dartpoints-clu01-in-20261029; no second facility or actual measured consumption. Evidence

Operator identifies its current Columbus colocation facility, customer services and staffed operations at this address. Future sold or committed power and utility capacity are not measured operating IT load. Evidence

Existing project record

research-final:IN:e8b93c7d8b736b6312d8
Review notes available

Data Cave, Inc.

Columbus, IN

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: EPA Data Cave Inc 2425 Technology Blvd exact **same physical address** as DartPoints CLU01, likely historical operator/legal entity; do not count new site nor imply operating status from EPA. Seek legal successor source.

Read 1 source findings (2026-10-31)

EPA Data Cave Inc 2425 Technology Blvd exact **same physical address** as DartPoints CLU01, likely historical operator/legal entity; do not count new site nor imply operating status from EPA. Seek legal successor source. Evidence

research-final:IN:ce65c5d4f3ceee424ff6
Review notes available

Rural Lake County Data Center

Crown Point, IN

Reported status: proposed

Exact location not published.

Original source · 2026-06-17

Review note: Rural Lake County proposal lacks unique village, owner and first-party parcel, cannot infer Crown Point physical location from nearest Census city.

research-final:IN:2d649e7fcb5f6c4b8c9b
Review notes available

Hancock County MegaSite

Cumberland, IN · Surge Development LLC

Reported status: cancelled

Exact location not published.

Original source · 2026-09-10

Review note: Surge Hancock County 775-acre Buck Creek Township MegaSite withdrew its rezoning petition amid opposition in May 2025; CSV1790 Cumberland nearest-Census versus CSV1809 Greenfield same developer/site. No operation; permit resubmission remains separate future question.

research-final:IN:c9ca834e9477d120f6af
Review notes available

Google Fort Wayne

Danville, IN · Google LLC

Reported status: operational

Reported capacity: 480.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count.

Read 1 source findings (2026-10-31)

Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count. Evidence

research-final:IN:e39d0bc242ac0d5d5ff2
Review notes available

Sabey Decatur Technology Park

Decatur Township, IN · Sabey Data Centers

Reported status: approved/permitted

Reported capacity: 250 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

Review note: Sabey Decatur Township south Indianapolis 1m+ sqft, 250MW **future plan** over years, requires owner/municipal approval and exact parcel before facility count; not Google Franklin withdrawal.

research-final:IN:4b202170a16a71976465
Review notes available

Sentinel Data Centers Project Shirley Eagle Creek Township Campus

Hebron, IN · Sentinel Data Centers; Johnson Sunnybrook Farm LLC; Foundry Works Energy Storage LLC

Reported status: proposed

Reported capacity: 500 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Hebron. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Review note: Sentinel Project Shirley Lake County/Eagle Creek Township source uses Hebron nearest-place; proposed campus cannot be counted operating; do not confuse with rural Lake County or Hobart sites.

research-final:IN:1fb9ccf9285fc8a771ed
Review notes available

SITCO Evansville

Evansville, IN · Sitco Business Solutions, LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: PeeringDB SITCO Evansville networks listing insufficient to prove distinct building, owner operations or public coordinates.

research-final:IN:ed97ce0d45e59657a0b6
Review notes available

Frontier Communications Data Center Fw

Fort Wayne, IN

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: EPA Frontier FW 6430 Oakbrook Pkwy legal regulated address cannot establish stand-alone active data hall; needs network operator first-party.

research-final:IN:d94e70028e9c7db4a017
Review notes available

Google Fort Wayne Data Center

Fort Wayne, IN · Google

Reported status: operational

Reported capacity: 285 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count.

Read 1 source findings (2026-10-31)

Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count. Evidence

research-final:IN:4826cf149c1140c0b3a5
Review notes available

Google Fort Wayne Data Center (Project Zodiac)

Fort Wayne, IN · Google

Reported status: operational

Reported capacity: 200.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

Review note: Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count.

Read 1 source findings (2026-10-31)

Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count. Evidence

research-final:IN:22d4d1611c08ee632e9e
Review notes available

Hatchworks Llc

Fort Wayne, IN

Reported status: approved/permitted (EPA air-permit record)

Exact location not published.

Original source · 2026-10-28

Review note: EPA Hatchworks 7510 Zodiac Way may relate to Google Fort Wayne campus but no operator ownership or phase confirmation; cannot count as separate building or claim operation.

Read 1 source findings (2026-10-31)

EPA Hatchworks 7510 Zodiac Way may relate to Google Fort Wayne campus but no operator ownership or phase confirmation; cannot count as separate building or claim operation. Evidence

research-final:IN:5e8efb01cf08b069bd68
Review notes available

INdigital

Fort Wayne, IN · INdigital Telecom

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: INdigital Fort Wayne PeeringDB record lacks first-party street and physical data hall; don't assume independent.

research-final:IN:fb588ddbfd326b754cc4
Research database | Compute Equity Atlas