Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Review notes availableCyrusOne Data Center
Yorkville, IL
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
Review note: CyrusOne Yorkville Technology Campus: operator confirms site work started early 2026, first building target late 2027 and operations 2028. CSV1739 misclassified city Plano by nearest Census, this is Yorkville; four source rows one campus, not 4 operating buildings.
Read 1 source findings (2026-10-31)
CyrusOne Yorkville Technology Campus: operator confirms site work started early 2026, first building target late 2027 and operations 2028. CSV1739 misclassified city Plano by nearest Census, this is Yorkville; four source rows one campus, not 4 operating buildings. Evidence
research-final:IL:d2e356f473205c5d7111Review notes availablePioneer Development - Yorkville Project Cardinal
Yorkville, IL · Pioneer Development, LLC
Reported status: proposed
Reported capacity: 1.8 GW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
Review note: Pioneer/Project Cardinal 1,037 acre Yorkville proposal is not CyrusOne Yorkville and not Prologis Project Steel; developer, phase and current entitlements must remain separate.
research-final:IL:5b6723c5ec8c9c5aadbcReview notes availablePrologis - Yorkville Project Steel
Yorkville, IL · Prologis, L.P.
Reported status: proposed
Reported capacity: 680 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Review note: Prologis Yorkville Project Steel 540 acres is not Pioneer Project Cardinal and not CyrusOne Yorkville Technology Campus; no operating buildings inferred from approval.
research-final:IL:0fb4f4ddfaf0a90e5df5Review notes availableYorkville Nexus V - Meyer Data Center
Yorkville, IL · Yorkville Nexus V LLC; Green Door Capital
Reported status: cancelled
Reported capacity: 400 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Yorkville. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-17
Review note: Yorkville Nexus V/Meyer supplier labels canceled; retain rights-checked research source but independently confirm cancellation before issuing final project nonpromotion.
research-final:IL:2e7e15576be525b2bbaeReview notes availableDecennial Group Akron Data Center
Akron, IN · Decennial Group
Reported status: proposed
Exact location not published.
Original source · 2026-09-13
Review note: Decennial Group Akron/Fulton County 300-acre plan is a proposed site, not a confirmed operating building; project proponent entitlement, site ownership, municipality and timeline required.
research-final:IN:0ba5cf63a2924f32c2e8Review notes availableGoogle Franklin Township data center proposal (Project Flo)
Beech Grove, IN
Reported status: cancelled
Exact location not published.
Original source · 2025-09-22
Review note: Four original names are one 468-acre Google-affiliate Deep Meadow Ventures Project Flo proposal along I-74/Post Road in Franklin Township, **Indianapolis**, not Beech Grove. Filed formal withdrawal of rezoning in September/October 2025, no constructed center. Do not conflate with Google's Fort Wayne campus or count buildings.
research-final:IN:36bffb301882cbe99ba1Accepted facility identity linkedIndiana University Data Center
Bloomington, IN · Indiana University
Reported status: operational
Exact location not published.
Original source · 2025-09-26
Review note: Indiana University Bloomington facility original CSV1776 is accepted canonical root reviewed:iu-bloomington-in-20261029. CSV1777 OSM 'IU Data Center' is not independent company 'Prime Data Centers' ownership nor transferable geometry. Reconcile same building vs other university site before linking.
Read 1 source findings (2026-10-31)
Current university data-center services page confirms operation and the Discovery Parkway address. Exact Census query has no match; the older 10th Street archive address and supplier point are not substituted. Evidence
Existing project record
research-final:IN:66820e731808861d02e5Review notes availableIU Data Center
Bloomington, IN · Prime Data Centers
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Indiana University Bloomington facility original CSV1776 is accepted canonical root reviewed:iu-bloomington-in-20261029. CSV1777 OSM 'IU Data Center' is not independent company 'Prime Data Centers' ownership nor transferable geometry. Reconcile same building vs other university site before linking.
research-final:IN:ebe3d944159c9eed4e86Review notes availableBristol Innovation Park
Bristol, IN · The Province Group
Reported status: cancelled
Exact location not published.
Original source · 2026-09-13
Review note: Province Group 247-acre farmland Bristol Innovation Park proposal includes multiple planned halls; require Elkhart County disposition and unique campus/phase; no operation or parcel point assumed.
research-final:IN:38ba0cb10272ff016efbReview notes availableProvident Burns Harbor Data Center Campus (Worthington Steel property)
Burns Harbor, IN · Provident Realty Advisors
Reported status: proposed
Exact location not published.
Original source · 2026-10-16
Review note: Provident Burns Harbor site on Worthington Steel property is a separate project from the **withdrawn Chesterton Brassie** plan. Do not propagate Chesterton withdrawal to distinct Burns Harbor without land permit and primary rights evidence.
research-final:IN:93c29d5e87ee0358e1c3Accepted facility identity linkedExpedient Indianapolis
Carmel, IN · Expedient, LLC
Reported status: operational
Reported capacity: 4.40 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: Expedient first-party lists its Indianapolis IND1 data center at 701 Congressional Blvd, Carmel, and data hall/support. Existing accepted canonical reviewed:expedient-ind1-in-20261029; no second building. Current address independently confirmed.
Read 2 source findings (2026-10-31)
Expedient first-party lists its Indianapolis IND1 data center at 701 Congressional Blvd, Carmel, and data hall/support. Existing accepted canonical reviewed:expedient-ind1-in-20261029; no second building. Current address independently confirmed. Evidence
Current operator lists the Indianapolis-market data center in Carmel with round-the-clock operations support. Physical building address is verified; suite 100 is the operator suite. Evidence
Existing project record
research-final:IN:051f17340c60bf56ac95Review notes availableCharlestown Data Center
Charlestown, IN
Reported status: proposed
Exact location not published.
Original source · 2026-06-17
Review note: Generic Charlestown proposal/news with no operator does not independently prove unique physical site, ownership or phase. Keep separate from QLEVR and Meta Jeffersonville pending exact parcel.
research-final:IN:8678eb839b6c7307d0eeReview notes availableMeta Jeffersonville (proposed)
Charlestown, IN · Facebook USA, Inc.
Reported status: proposed
Reported capacity: 407.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-21
Review note: Meta Jeffersonville proposal source nearest-Census city Charlestown is not primary Meta site evidence; need current first-party exact project identity; do not merge into Meta Lebanon.
research-final:IN:1d26fcd71bc190609751Review notes availableQLEVR Charlestown Data Center
Charlestown, IN · QLEVR LLC
Reported status: approved/permitted
Reported capacity: 3 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-16
Review note: QLEVR Shadow Lake Industrial Park 55k sqft/3MW supply is projected design not confirmed 2026 operating draw; hold phased site and source location.
research-final:IN:d937a0982e07f4d29e74Review notes availableProvident Realty Advisors
Chesteron, IN
Reported status: cancelled
Exact location not published.
Original source · 2026-06-18
Review note: Provident withdrew the town application for proposed Chesterton former Brassie Golf Club ~200-acre eight-building campus. Two supplier rows one withdrawn project, not Burns Harbor and not 8 operating sites.
research-final:IN:df2c6fb3ba4c3a6cfd8aReview notes availableProvident Chesterton Data Center Campus (former Brassie Golf Club)
Chesterton, IN · Provident Realty Advisors
Reported status: cancelled
Source reference: address match (exact): 1110 PEARSON RD, CHESTERTON, IN, 46304. Census Geocoder; not a verified facility pin.
Original source · 2026-09-13
Review note: Provident withdrew the town application for proposed Chesterton former Brassie Golf Club ~200-acre eight-building campus. Two supplier rows one withdrawn project, not Burns Harbor and not 8 operating sites.
research-final:IN:89ed7006f326e328e7c8Review notes availableUnnamed research feature in Columbus
Columbus, IN
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10-28
Review note: Unnamed OSM facility in Columbus cannot prove separate physical operator and geometry is not licensed for user public reference layer.
research-final:IN:1b5280fb797530fa7f14Accepted facility identity linkedDartPoints Columbus, IN - CLU1
Columbus, IN · DartPoints, LLC
Reported status: operational
Exact location not published.
Original source · 2026-06-18
Review note: DartPoints first-party verifies CLU01 at 2425 Technology Blvd Columbus and 735 kW critical IT **rated capacity**. Root already accepted as reviewed:dartpoints-clu01-in-20261029; no second facility or actual measured consumption.
Read 2 source findings (2026-10-31)
DartPoints first-party verifies CLU01 at 2425 Technology Blvd Columbus and 735 kW critical IT **rated capacity**. Root already accepted as reviewed:dartpoints-clu01-in-20261029; no second facility or actual measured consumption. Evidence
Operator identifies its current Columbus colocation facility, customer services and staffed operations at this address. Future sold or committed power and utility capacity are not measured operating IT load. Evidence
Existing project record
research-final:IN:e8b93c7d8b736b6312d8Review notes availableData Cave, Inc.
Columbus, IN
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: EPA Data Cave Inc 2425 Technology Blvd exact **same physical address** as DartPoints CLU01, likely historical operator/legal entity; do not count new site nor imply operating status from EPA. Seek legal successor source.
Read 1 source findings (2026-10-31)
EPA Data Cave Inc 2425 Technology Blvd exact **same physical address** as DartPoints CLU01, likely historical operator/legal entity; do not count new site nor imply operating status from EPA. Seek legal successor source. Evidence
research-final:IN:ce65c5d4f3ceee424ff6Review notes availableRural Lake County Data Center
Crown Point, IN
Reported status: proposed
Exact location not published.
Original source · 2026-06-17
Review note: Rural Lake County proposal lacks unique village, owner and first-party parcel, cannot infer Crown Point physical location from nearest Census city.
research-final:IN:2d649e7fcb5f6c4b8c9bReview notes availableHancock County MegaSite
Cumberland, IN · Surge Development LLC
Reported status: cancelled
Exact location not published.
Original source · 2026-09-10
Review note: Surge Hancock County 775-acre Buck Creek Township MegaSite withdrew its rezoning petition amid opposition in May 2025; CSV1790 Cumberland nearest-Census versus CSV1809 Greenfield same developer/site. No operation; permit resubmission remains separate future question.
research-final:IN:c9ca834e9477d120f6afReview notes availableGoogle Fort Wayne
Danville, IN · Google LLC
Reported status: operational
Reported capacity: 480.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count.
Read 1 source findings (2026-10-31)
Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count. Evidence
research-final:IN:e39d0bc242ac0d5d5ff2Review notes availableSabey Decatur Technology Park
Decatur Township, IN · Sabey Data Centers
Reported status: approved/permitted
Reported capacity: 250 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
Review note: Sabey Decatur Township south Indianapolis 1m+ sqft, 250MW **future plan** over years, requires owner/municipal approval and exact parcel before facility count; not Google Franklin withdrawal.
research-final:IN:4b202170a16a71976465Review notes availableSentinel Data Centers Project Shirley Eagle Creek Township Campus
Hebron, IN · Sentinel Data Centers; Johnson Sunnybrook Farm LLC; Foundry Works Energy Storage LLC
Reported status: proposed
Reported capacity: 500 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Hebron. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
Review note: Sentinel Project Shirley Lake County/Eagle Creek Township source uses Hebron nearest-place; proposed campus cannot be counted operating; do not confuse with rural Lake County or Hobart sites.
research-final:IN:1fb9ccf9285fc8a771edReview notes availableSITCO Evansville
Evansville, IN · Sitco Business Solutions, LLC
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: PeeringDB SITCO Evansville networks listing insufficient to prove distinct building, owner operations or public coordinates.
research-final:IN:ed97ce0d45e59657a0b6Review notes availableFrontier Communications Data Center Fw
Fort Wayne, IN
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: EPA Frontier FW 6430 Oakbrook Pkwy legal regulated address cannot establish stand-alone active data hall; needs network operator first-party.
research-final:IN:d94e70028e9c7db4a017Review notes availableGoogle Fort Wayne Data Center
Fort Wayne, IN · Google
Reported status: operational
Reported capacity: 285 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count.
Read 1 source findings (2026-10-31)
Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count. Evidence
research-final:IN:4826cf149c1140c0b3a5Review notes availableGoogle Fort Wayne Data Center (Project Zodiac)
Fort Wayne, IN · Google
Reported status: operational
Reported capacity: 200.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
Review note: Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count.
Read 1 source findings (2026-10-31)
Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count. Evidence
research-final:IN:22d4d1611c08ee632e9eReview notes availableHatchworks Llc
Fort Wayne, IN
Reported status: approved/permitted (EPA air-permit record)
Exact location not published.
Original source · 2026-10-28
Review note: EPA Hatchworks 7510 Zodiac Way may relate to Google Fort Wayne campus but no operator ownership or phase confirmation; cannot count as separate building or claim operation.
Read 1 source findings (2026-10-31)
EPA Hatchworks 7510 Zodiac Way may relate to Google Fort Wayne campus but no operator ownership or phase confirmation; cannot count as separate building or claim operation. Evidence
research-final:IN:5e8efb01cf08b069bd68Review notes availableINdigital
Fort Wayne, IN · INdigital Telecom
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: INdigital Fort Wayne PeeringDB record lacks first-party street and physical data hall; don't assume independent.
research-final:IN:fb588ddbfd326b754cc4