6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Existing facility identity linked

EdgeConneX New Orleans (EDCSLI01)

Slidell, LA · EdgeConneX Inc.

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Review note: EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus.

Read 2 source findings (2026-10-31)

EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus. Evidence

New Orleans is the market label; the physical SLI01 site is in Slidell. Evidence

Existing project record

research-final:LA:74ea9c692cfc25a3ed20
Existing facility identity linked

EdgeConneX SLI01 (Slidell)

Slidell, LA · EdgeConneX

Reported status: operational

Source reference: address match (exact): 2070 GAUSE BLVD, SLIDELL, LA, 70461. Census Geocoder; not a verified facility pin.

Original source · 2026-09-10

Review note: EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus.

Read 2 source findings (2026-10-31)

EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus. Evidence

Same physical Slidell SLI01 site, not a separate New Orleans building. Evidence

Existing project record

research-final:LA:51c8ced935a01db55a5a
Existing facility identity linked

EdgeConneX Slidell Edge Data Center

Slidell, LA · EdgeConneX

Reported status: operational

Reported capacity: 1.5 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Slidell. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Review note: EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus.

Read 2 source findings (2026-10-31)

EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus. Evidence

Same physical Slidell SLI01 site, not a third map location. Evidence

Existing project record

research-final:LA:ca6900053f0e63dccb4a
Existing facility identity linked

Hut 8 River Bend Campus

St. Francisville, LA · Hut 8

Reported status: under construction

Reported capacity: 330 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-22

Review note: One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027.

Read 2 source findings (2026-10-31)

One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027. Evidence

Hut 8 confirms one River Bend AI development in West Feliciana Parish; contracted or potential capacity is not verified current operating IT load. Evidence

Existing project record

research-final:LA:d9a06616c0704d509f96
Existing facility identity linked

Hut 8 West Feliciana AI Data Center

St. Francisville, LA · Hut 8 Corp.; Fluidstack; Google

Reported status: under construction

Reported capacity: 330 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for St. Francisville. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-19

Review note: One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027.

Read 2 source findings (2026-10-31)

One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027. Evidence

Hut 8 confirms one River Bend AI development in West Feliciana Parish; contracted or potential capacity is not verified current operating IT load. Evidence

Existing project record

research-final:LA:9d9a0506be08abd2f985
Existing facility identity linked

River Bend Data Center Campus

St. Francisville, LA · Fluidstack, Anthropic, Google

Reported status: proposed

Reported capacity: 245.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027.

Read 2 source findings (2026-10-31)

One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027. Evidence

Hut 8 confirms one River Bend AI development in West Feliciana Parish; contracted or potential capacity is not verified current operating IT load. Evidence

Existing project record

research-final:LA:60e04dca3c8eafc7e383
Review notes available

Vidalia Data Center (former Fruit of the Loom building)

Vidalia, LA · Fortalis Vidalia, LLC

Reported status: proposed

Reported capacity: 50 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-17

Review note: Former factory conversion proposal lacks first-party status and sponsor verification.

research-final:LA:8f162038b0a7cae3001c
Review notes available

Buddy Ellis Road Data Center Site (Walker)

Walker, LA · Undisclosed (tract rezoned at the request of Juban Land Holdings, LLC)

Reported status: proposed

Exact location not published.

Original source · 2026-09-15

Review note: Buddy Ellis Road site lead is not established as built or operating.

research-final:LA:676477fd20e6c4276bca
Existing facility identity linked

Meta Richland Parish Current Development

, LA

Reported status: under construction

Exact location not published.

Original source · 2026-07-16

Review note: One Richland Parish Hyperion campus; CSV2049 OSM feature in Georgia and CSV2064 vendor operational status cannot be promoted.

Read 2 source findings (2026-10-31)

One Richland Parish Hyperion campus; CSV2049 OSM feature in Georgia and CSV2064 vendor operational status cannot be promoted. Evidence

Meta confirms one Richland Parish Hyperion physical campus; supplied Georgia ODbL point on CSV2049 and supplier operating claim CSV2064 are not promoted. Evidence

Existing project record

research-final:LA:a0293ebea806a908a487
Existing facility identity linked

Meta Richland Parish Data Center

, LA · Meta

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10-28

Review note: One Richland Parish Hyperion campus; CSV2049 OSM feature in Georgia and CSV2064 vendor operational status cannot be promoted.

Read 2 source findings (2026-10-31)

One Richland Parish Hyperion campus; CSV2049 OSM feature in Georgia and CSV2064 vendor operational status cannot be promoted. Evidence

Meta confirms one Richland Parish Hyperion physical campus; supplied Georgia ODbL point on CSV2049 and supplier operating claim CSV2064 are not promoted. Evidence

Existing project record

research-final:LA:f0dcffaf14349b038c5c
Review notes available

Navisite Andover

Andover, MA · NaviSite LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Navisite's current Andover resource establishes an actual operating data center; original registry geometry and PeeringDB status are not authoritative.

Read 1 source findings (2026-10-31)

Navisite's current Andover resource establishes an actual operating data center; original registry geometry and PeeringDB status are not authoritative. Evidence

research-final:MA:afa06025f3d8dd1add64
Review notes available

Schneider Electric Global R&D Center (Andover)

Andover, MA · Schneider Electric

Reported status: operational

Reported capacity: 1 MW (scope and operation unverified)

Approximate locality: address match (exact): 800 FEDERAL ST, ANDOVER, MA, 01810. Census Geocoder; not a verified facility pin.

Original source · 2026-06-15

Review note: Schneider Global R&D center is not proof that a separately marketable production data-center building exists.

research-final:MA:3d08303371217944d45e
Review notes available

TierPoint Boston-Andover

Andover, MA · TierPoint

Reported status: operational

Reported capacity: 5 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

Review note: TierPoint current Greater Boston Andover colocation is distinct from Navisite; operator lists 15 Shattuck Road and no measured IT load.

Read 2 source findings (2026-10-31)

TierPoint current Greater Boston Andover colocation is distinct from Navisite; operator lists 15 Shattuck Road and no measured IT load. Evidence

TierPoint current Greater Boston Andover colocation is distinct from Navisite; operator lists 15 Shattuck Road and no measured IT load. Evidence

research-final:MA:3e3c7cf498152c2dffc2
Review notes available

Digital Realty Boston BOS13 (closed)

Bedford, MA · Digital Realty Trust, Inc.

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-17

Review note: Supplier marks BOS13 closed but PeeringDB ok does not prove current operation or closure; verify exact operator and successor, do not revive.

research-final:MA:2a24c3a719ca49b345c2
Review notes available

EdgeConneX Boston (EDCBOS01)

Billerica, MA · EdgeConneX

Reported status: operational

Reported capacity: 4.5 MW planned; 1.5 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-24

Review note: EDCBOS01 Billerica versus BOS01 Suffolk County may be inconsistent descriptions of a single metro site, not separate facilities; operator building proof needed.

research-final:MA:a752ce7813b0343d1b10
Accepted facility identity linked

Equinix BO2 - Boston, Billerica

Billerica, MA · Equinix

Reported status: operational

Exact location not published.

Original source · 2026-09-15

Review note: Equinix's own BO2 page establishes a Billerica operational colocation site, not Boston proper; avoid generic market-city or competitor alias.

Read 2 source findings (2026-10-31)

Equinix's own BO2 page establishes a Billerica operational colocation site, not Boston proper; avoid generic market-city or competitor alias. Evidence

Current operator BO2 page identifies the operating Billerica facility at this exact street address. Boston is the market label; the physical municipality is Billerica. Evidence

Existing project record

research-final:MA:15f567110e099accaf7a
Review notes available

230 Congress

Boston, MA · RTE Group, Inc.

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Review note: PeeringDB facility label is a street address rather than verified owner/operator physical data-center identity.

research-final:MA:d01a0a4858d15180f720
Review notes available

Crown Castle Boston (1 Summer)

Boston, MA · Crown Castle Inc.

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Crown Castle 1 Summer listing identifies network presence in Markley's carrier hotel; do not add a separate Crown Castle physical campus solely from peering.

Read 1 source findings (2026-10-31)

Crown Castle 1 Summer listing identifies network presence in Markley's carrier hotel; do not add a separate Crown Castle physical campus solely from peering. Evidence

research-final:MA:27d778afdfe62062bdaf
Review notes available

DataBank Downtown Boston Data Center BOS1

Boston, MA · DataBank

Reported status: operational

Reported capacity: 0.5 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: DataBank Downtown Boston BOS1 requires exact independent operator building/campus check against multi-tenant One Summer and 230 Congress.

research-final:MA:7afb2843efeeb32a395a
Review notes available

Markley Group - One Summer Street (Boston)

Boston, MA · Markley Group

Reported status: operational

Reported capacity: 30 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Markley first-party confirms operating One Summer Street Boston carrier hotel distinct from its Lowell center; Crown Castle tenant 2087 is not extra site.

Read 2 source findings (2026-10-31)

Markley first-party confirms operating One Summer Street Boston carrier hotel distinct from its Lowell center; Crown Castle tenant 2087 is not extra site. Evidence

Markley first-party confirms operating One Summer Street Boston carrier hotel distinct from its Lowell center; Crown Castle tenant 2087 is not extra site. Evidence

research-final:MA:9456044cbcf826c4b569
Review notes available

Lumen Boston (300 Bent Street)

Cambridge, MA · Lumen Technologies

Reported status: operational

Exact location not published.

Original source · 2026-09-15

Review note: Supplier Cambridge 300 Bent label lacks currently verified provider physical data-center use, tenant/campus boundaries.

research-final:MA:153badf6be716b79decb
Review notes available

Prov.net CHF1 (Boston North)

Chelmsford, MA · Prov.net

Reported status: operational

Exact location not published.

Original source · 2026-09-15

Review note: Prov.net CHF1 Chelmsford supplier entry needs current operator physical-center confirmation.

research-final:MA:88e54e8291c7b0caa589
Review notes available

Everett Data Center

Everett, MA

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Review note: Municipal debate/proposed Everett facility is not an operating site; require planning outcome and exact applicant/parcel.

research-final:MA:3a8ef40b0b527681a8ee
Review notes available

Congruity 360 Llc

Fall River, MA

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: EPA air permit identifies environmental source only, not operating data center; facility type and physical identity open.

research-final:MA:fd18b604b8e11565c754
Review notes available

Amazon Data Services Grafton

Grafton, MA · Amazon Data Services

Reported status: proposed

Exact location not published.

Original source · 2026-10-24

Review note: AWS Grafton proposal distinct locality from Westborough; supplier project not proof operating campus.

research-final:MA:0a4b9ee4a852b532beb1
Review notes available

Ssb Realty Grafton Data Center

Grafton, MA

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: SSB Realty Grafton EPA permit may describe property applicant for AWS Grafton but does not prove separate campus or operation.

research-final:MA:5b8ac5f5b49caae9c1ca
Review notes available

AMAZON COM SERVICES LLC DTB9

Haverhill, MA

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-12

Review note: Amazon DTB9 EPA record could be logistics/distribution facility; not a proven data center without building-specific primary evidence.

research-final:MA:317bc76fc9fbfe9db148
Review notes available

Chestnut River Holyoke Data Center (former Hampden Papers complex)

Holyoke, MA · Chestnut River Power and Infrastructure

Reported status: proposed

Reported capacity: 20 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-21

Review note: Chestnut River Holyoke proposal vs reported cancelled Water Street project may be versioned/related; cancellation of one iteration cannot automatically cancel all successors.

research-final:MA:e46779d3db41207e8163
Review notes available

Chestnut River Power Data Center Water Street Holyoke

Holyoke, MA · Chestnut River Power Data Center

Reported status: cancelled

Reported capacity: 20 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Holyoke. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-17

Review note: Chestnut River Holyoke proposal vs reported cancelled Water Street project may be versioned/related; cancellation of one iteration cannot automatically cancel all successors.

research-final:MA:3b7da119f98ea2f575b6
Accepted facility identity linked

Massachusetts Green High Performance Computing Center

Holyoke, MA · MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale)

Reported status: operational

Reported capacity: 15 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-24

Review note: University consortium confirms operating Massachusetts Green High Performance Computing Center at 100 Bigelow Street; no unmeasured operating MW.

Read 3 source findings (2026-10-31)

University consortium confirms operating Massachusetts Green High Performance Computing Center at 100 Bigelow Street; no unmeasured operating MW. Evidence

University consortium confirms operating Massachusetts Green High Performance Computing Center at 100 Bigelow Street; no unmeasured operating MW. Evidence

Current university consortium identifies the operating research computing facility. Its visiting page confirms the exact Holyoke street address; no estimated IT load is published. Evidence

Existing project record

research-final:MA:fbd5f022d9101d2877db