Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Existing facility identity linkedEdgeConneX New Orleans (EDCSLI01)
Slidell, LA · EdgeConneX Inc.
Reported status: operational
Exact location not published.
Original source · 2025-09-26
Review note: EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus.
Read 2 source findings (2026-10-31)
EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus. Evidence
New Orleans is the market label; the physical SLI01 site is in Slidell. Evidence
Existing project record
research-final:LA:74ea9c692cfc25a3ed20Existing facility identity linkedEdgeConneX SLI01 (Slidell)
Slidell, LA · EdgeConneX
Reported status: operational
Source reference: address match (exact): 2070 GAUSE BLVD, SLIDELL, LA, 70461. Census Geocoder; not a verified facility pin.
Original source · 2026-09-10
Review note: EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus.
Read 2 source findings (2026-10-31)
EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus. Evidence
Same physical Slidell SLI01 site, not a separate New Orleans building. Evidence
Existing project record
research-final:LA:51c8ced935a01db55a5aExisting facility identity linkedEdgeConneX Slidell Edge Data Center
Slidell, LA · EdgeConneX
Reported status: operational
Reported capacity: 1.5 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Slidell. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
Review note: EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus.
Read 2 source findings (2026-10-31)
EDCSLI01, SLI01 and Slidell Edge are one physical site, not extra New Orleans campus. Evidence
Same physical Slidell SLI01 site, not a third map location. Evidence
Existing project record
research-final:LA:ca6900053f0e63dccb4aExisting facility identity linkedHut 8 River Bend Campus
St. Francisville, LA · Hut 8
Reported status: under construction
Reported capacity: 330 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-22
Review note: One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027.
Read 2 source findings (2026-10-31)
One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027. Evidence
Hut 8 confirms one River Bend AI development in West Feliciana Parish; contracted or potential capacity is not verified current operating IT load. Evidence
Existing project record
research-final:LA:d9a06616c0704d509f96Existing facility identity linkedHut 8 West Feliciana AI Data Center
St. Francisville, LA · Hut 8 Corp.; Fluidstack; Google
Reported status: under construction
Reported capacity: 330 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for St. Francisville. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-19
Review note: One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027.
Read 2 source findings (2026-10-31)
One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027. Evidence
Hut 8 confirms one River Bend AI development in West Feliciana Parish; contracted or potential capacity is not verified current operating IT load. Evidence
Existing project record
research-final:LA:9d9a0506be08abd2f985Existing facility identity linkedRiver Bend Data Center Campus
St. Francisville, LA · Fluidstack, Anthropic, Google
Reported status: proposed
Reported capacity: 245.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027.
Read 2 source findings (2026-10-31)
One River Bend St Francisville Hut 8 campus, not three; current construction with first phase forecast 2027. Evidence
Hut 8 confirms one River Bend AI development in West Feliciana Parish; contracted or potential capacity is not verified current operating IT load. Evidence
Existing project record
research-final:LA:60e04dca3c8eafc7e383Review notes availableVidalia Data Center (former Fruit of the Loom building)
Vidalia, LA · Fortalis Vidalia, LLC
Reported status: proposed
Reported capacity: 50 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-17
Review note: Former factory conversion proposal lacks first-party status and sponsor verification.
research-final:LA:8f162038b0a7cae3001cReview notes availableBuddy Ellis Road Data Center Site (Walker)
Walker, LA · Undisclosed (tract rezoned at the request of Juban Land Holdings, LLC)
Reported status: proposed
Exact location not published.
Original source · 2026-09-15
Review note: Buddy Ellis Road site lead is not established as built or operating.
research-final:LA:676477fd20e6c4276bcaExisting facility identity linkedMeta Richland Parish Current Development
, LA
Reported status: under construction
Exact location not published.
Original source · 2026-07-16
Review note: One Richland Parish Hyperion campus; CSV2049 OSM feature in Georgia and CSV2064 vendor operational status cannot be promoted.
Read 2 source findings (2026-10-31)
One Richland Parish Hyperion campus; CSV2049 OSM feature in Georgia and CSV2064 vendor operational status cannot be promoted. Evidence
Meta confirms one Richland Parish Hyperion physical campus; supplied Georgia ODbL point on CSV2049 and supplier operating claim CSV2064 are not promoted. Evidence
Existing project record
research-final:LA:a0293ebea806a908a487Existing facility identity linkedMeta Richland Parish Data Center
, LA · Meta
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10-28
Review note: One Richland Parish Hyperion campus; CSV2049 OSM feature in Georgia and CSV2064 vendor operational status cannot be promoted.
Read 2 source findings (2026-10-31)
One Richland Parish Hyperion campus; CSV2049 OSM feature in Georgia and CSV2064 vendor operational status cannot be promoted. Evidence
Meta confirms one Richland Parish Hyperion physical campus; supplied Georgia ODbL point on CSV2049 and supplier operating claim CSV2064 are not promoted. Evidence
Existing project record
research-final:LA:f0dcffaf14349b038c5cReview notes availableNavisite Andover
Andover, MA · NaviSite LLC
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: Navisite's current Andover resource establishes an actual operating data center; original registry geometry and PeeringDB status are not authoritative.
Read 1 source findings (2026-10-31)
Navisite's current Andover resource establishes an actual operating data center; original registry geometry and PeeringDB status are not authoritative. Evidence
research-final:MA:afa06025f3d8dd1add64Review notes availableSchneider Electric Global R&D Center (Andover)
Andover, MA · Schneider Electric
Reported status: operational
Reported capacity: 1 MW (scope and operation unverified)
Approximate locality: address match (exact): 800 FEDERAL ST, ANDOVER, MA, 01810. Census Geocoder; not a verified facility pin.
Original source · 2026-06-15
Review note: Schneider Global R&D center is not proof that a separately marketable production data-center building exists.
research-final:MA:3d08303371217944d45eReview notes availableTierPoint Boston-Andover
Andover, MA · TierPoint
Reported status: operational
Reported capacity: 5 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
Review note: TierPoint current Greater Boston Andover colocation is distinct from Navisite; operator lists 15 Shattuck Road and no measured IT load.
Read 2 source findings (2026-10-31)
TierPoint current Greater Boston Andover colocation is distinct from Navisite; operator lists 15 Shattuck Road and no measured IT load. Evidence
TierPoint current Greater Boston Andover colocation is distinct from Navisite; operator lists 15 Shattuck Road and no measured IT load. Evidence
research-final:MA:3e3c7cf498152c2dffc2Review notes availableDigital Realty Boston BOS13 (closed)
Bedford, MA · Digital Realty Trust, Inc.
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-17
Review note: Supplier marks BOS13 closed but PeeringDB ok does not prove current operation or closure; verify exact operator and successor, do not revive.
research-final:MA:2a24c3a719ca49b345c2Review notes availableEdgeConneX Boston (EDCBOS01)
Billerica, MA · EdgeConneX
Reported status: operational
Reported capacity: 4.5 MW planned; 1.5 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-10-24
Review note: EDCBOS01 Billerica versus BOS01 Suffolk County may be inconsistent descriptions of a single metro site, not separate facilities; operator building proof needed.
research-final:MA:a752ce7813b0343d1b10Accepted facility identity linkedEquinix BO2 - Boston, Billerica
Billerica, MA · Equinix
Reported status: operational
Exact location not published.
Original source · 2026-09-15
Review note: Equinix's own BO2 page establishes a Billerica operational colocation site, not Boston proper; avoid generic market-city or competitor alias.
Read 2 source findings (2026-10-31)
Equinix's own BO2 page establishes a Billerica operational colocation site, not Boston proper; avoid generic market-city or competitor alias. Evidence
Current operator BO2 page identifies the operating Billerica facility at this exact street address. Boston is the market label; the physical municipality is Billerica. Evidence
Existing project record
research-final:MA:15f567110e099accaf7aReview notes available230 Congress
Boston, MA · RTE Group, Inc.
Reported status: operational
Exact location not published.
Original source · 2025-09-26
Review note: PeeringDB facility label is a street address rather than verified owner/operator physical data-center identity.
research-final:MA:d01a0a4858d15180f720Review notes availableCrown Castle Boston (1 Summer)
Boston, MA · Crown Castle Inc.
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: Crown Castle 1 Summer listing identifies network presence in Markley's carrier hotel; do not add a separate Crown Castle physical campus solely from peering.
Read 1 source findings (2026-10-31)
Crown Castle 1 Summer listing identifies network presence in Markley's carrier hotel; do not add a separate Crown Castle physical campus solely from peering. Evidence
research-final:MA:27d778afdfe62062bdafReview notes availableDataBank Downtown Boston Data Center BOS1
Boston, MA · DataBank
Reported status: operational
Reported capacity: 0.5 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: DataBank Downtown Boston BOS1 requires exact independent operator building/campus check against multi-tenant One Summer and 230 Congress.
research-final:MA:7afb2843efeeb32a395aReview notes availableMarkley Group - One Summer Street (Boston)
Boston, MA · Markley Group
Reported status: operational
Reported capacity: 30 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Markley first-party confirms operating One Summer Street Boston carrier hotel distinct from its Lowell center; Crown Castle tenant 2087 is not extra site.
Read 2 source findings (2026-10-31)
Markley first-party confirms operating One Summer Street Boston carrier hotel distinct from its Lowell center; Crown Castle tenant 2087 is not extra site. Evidence
Markley first-party confirms operating One Summer Street Boston carrier hotel distinct from its Lowell center; Crown Castle tenant 2087 is not extra site. Evidence
research-final:MA:9456044cbcf826c4b569Review notes availableLumen Boston (300 Bent Street)
Cambridge, MA · Lumen Technologies
Reported status: operational
Exact location not published.
Original source · 2026-09-15
Review note: Supplier Cambridge 300 Bent label lacks currently verified provider physical data-center use, tenant/campus boundaries.
research-final:MA:153badf6be716b79decbReview notes availableProv.net CHF1 (Boston North)
Chelmsford, MA · Prov.net
Reported status: operational
Exact location not published.
Original source · 2026-09-15
Review note: Prov.net CHF1 Chelmsford supplier entry needs current operator physical-center confirmation.
research-final:MA:88e54e8291c7b0caa589Review notes availableEverett Data Center
Everett, MA
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
Review note: Municipal debate/proposed Everett facility is not an operating site; require planning outcome and exact applicant/parcel.
research-final:MA:3a8ef40b0b527681a8eeReview notes availableCongruity 360 Llc
Fall River, MA
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: EPA air permit identifies environmental source only, not operating data center; facility type and physical identity open.
research-final:MA:fd18b604b8e11565c754Review notes availableAmazon Data Services Grafton
Grafton, MA · Amazon Data Services
Reported status: proposed
Exact location not published.
Original source · 2026-10-24
Review note: AWS Grafton proposal distinct locality from Westborough; supplier project not proof operating campus.
research-final:MA:0a4b9ee4a852b532beb1Review notes availableSsb Realty Grafton Data Center
Grafton, MA
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: SSB Realty Grafton EPA permit may describe property applicant for AWS Grafton but does not prove separate campus or operation.
research-final:MA:5b8ac5f5b49caae9c1caReview notes availableAMAZON COM SERVICES LLC DTB9
Haverhill, MA
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-12
Review note: Amazon DTB9 EPA record could be logistics/distribution facility; not a proven data center without building-specific primary evidence.
research-final:MA:317bc76fc9fbfe9db148Review notes availableChestnut River Holyoke Data Center (former Hampden Papers complex)
Holyoke, MA · Chestnut River Power and Infrastructure
Reported status: proposed
Reported capacity: 20 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-21
Review note: Chestnut River Holyoke proposal vs reported cancelled Water Street project may be versioned/related; cancellation of one iteration cannot automatically cancel all successors.
research-final:MA:e46779d3db41207e8163Review notes availableChestnut River Power Data Center Water Street Holyoke
Holyoke, MA · Chestnut River Power Data Center
Reported status: cancelled
Reported capacity: 20 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Holyoke. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-17
Review note: Chestnut River Holyoke proposal vs reported cancelled Water Street project may be versioned/related; cancellation of one iteration cannot automatically cancel all successors.
research-final:MA:3b7da119f98ea2f575b6Accepted facility identity linkedMassachusetts Green High Performance Computing Center
Holyoke, MA · MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale)
Reported status: operational
Reported capacity: 15 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-10-24
Review note: University consortium confirms operating Massachusetts Green High Performance Computing Center at 100 Bigelow Street; no unmeasured operating MW.
Read 3 source findings (2026-10-31)
University consortium confirms operating Massachusetts Green High Performance Computing Center at 100 Bigelow Street; no unmeasured operating MW. Evidence
University consortium confirms operating Massachusetts Green High Performance Computing Center at 100 Bigelow Street; no unmeasured operating MW. Evidence
Current university consortium identifies the operating research computing facility. Its visiting page confirms the exact Holyoke street address; no estimated IT load is published. Evidence
Existing project record
research-final:MA:fbd5f022d9101d2877db