Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Awaiting source review

Lee County Data Center

Sanford, NC

Reported status: proposed

Exact location not published.

Original source · 2026-06-17

research-final:NC:97ca7581ca00ed5e7896
Awaiting source review

PointOne Lower Moncure Road Data Center (Lee County)

Sanford, NC · PointOne

Reported status: proposed

Reported capacity: 90 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-10

research-final:NC:1497952e9a6ba45693c3
Awaiting source review

Long Ferry Road Data Center Campus (Rowan County)

Spencer, NC · Undisclosed developer

Reported status: proposed

Exact location not published.

Original source · 2026-09-21

research-final:NC:40dd2f3b3961d854eb91
Awaiting source review

Compass Datacenters CLT I — proposed greenfield data-center facility (NC DAQ air-permit application 4900350.26A)

Statesville, NC · Compass Datacenters CLT I, LLC

Reported status: proposed

Exact location not published.

Original source · 2026-10-26

research-final:NC:a8141a597488f972c978
Awaiting source review

Compass Datacenters Statesville Campus

Statesville, NC · Compass Datacenters

Reported status: proposed

Reported capacity: 500 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

research-final:NC:e908a508b3b5d4cf53f4
Awaiting source review

Bonnie Lane

Sylva, NC · BalsamWest FiberNET, LLC

Reported status: operational

Exact location not published.

Original source · 2025-09-26

research-final:NC:7b87e01488704c88c28f
Awaiting source review

Energy Storage Solutions Kingsboro Data Center

Tarboro, NC · Energy Storage Solutions LLC

Reported status: cancelled

Reported capacity: 300 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

research-final:NC:b0a25a8c04fe00b1ca76
Awaiting source review

PRSM Group Cumberland County AI Data Center (undisclosed industrial park)

Vander, NC · PRSM Group

Reported status: proposed

Reported capacity: 225 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-10

research-final:NC:e3e0f57d87383251681d
Awaiting source review

Project Delta Stokes County Data Center

Walnut Cove, NC · Engineered Land Solutions; Blue Ridge Companies

Reported status: proposed

Exact location not published.

Original source · 2026-06-15

research-final:NC:4af5648ddcfd2da8a27e
Awaiting source review

American Express Travel Related Services Co.,

Whitsett, NC

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 150 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:NC:36bdc96ec8631ec04f67
Awaiting source review

American Express Whitsett Data Center (IPC2)

Whitsett, NC · American Express

Reported status: operational

Reported capacity: 30 MW operational (scope and operation unverified)

Source reference: address match (exact): 5301 MCCONNELL RD, WHITSETT, NC, 27377. Census Geocoder; not a verified facility pin.

Original source · 2026-09-24

research-final:NC:890f06abf2d6cf50dee9
Awaiting source review

Hanes Group Data Center

Winston-Salem, NC

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:NC:0894c640ffa54f31971f
Accepted facility identity linked

Segra Winston-Salem Data Center

Winston-Salem, NC · Segra

Reported status: operational

Reported capacity: 8 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-21

Read 1 source findings (2026-10-30)

Current operator-linked sheet confirms active facility. Two independent data centers inside one physical facility are represented by one site record. Primary sheet supplies no ZIP. Evidence

Existing project record

research-final:NC:bf6877bd8c4fb14c944e
Awaiting source review

WhiteFiber NC-2 / NC-3 Data Center Campuses (Yadkinville)

Yadkinville, NC · WhiteFiber (Enovum Data Centers Corp.)

Reported status: proposed

Reported capacity: 60 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-15

research-final:NC:742b2bcc842a20960a25
Awaiting source review

BB&T Data Center

Zebulon, NC · Prime Data Centers

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:NC:b2068355bfadd5e5bff7
Awaiting source review

Microsoft Mega Park

, NC · Microsoft

Reported status: proposed

Exact location not published.

Original source · 2026-09-24

research-final:NC:1529168abdc71f759e5d
Awaiting source review

1 Aaa Windsor Test Site

Bismarck, ND

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:ND:ed491729c1e957973497
Accepted facility identity linked

Aurum Bismarck Campus

Bismarck, ND · Aurum Capital Ventures, Inc.

Reported status: proposed

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Bismarck. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Read 1 source findings (2026-10-30)

County June 2025 minutes record an Aurum land agent expressing interest in purchasing part of the Missouri Valley Complex for a potential data center. This verifies a historical land inquiry only; current sale, permit, construction and operation are unverified. The shared complex address is not a surveyed data-center location. Duplicate Aurum archive row 2869 is not another project. Evidence

Existing project record

research-final:ND:c7506099a5a38aa68dc9
Accepted facility identity linked

DCN Dakota Carrier Networks Bismarck

Bismarck, ND · Dakota Carrier Network

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings (2026-10-29)

Operator current service description identifies the Coleman data center in Bismarck; its network operations page binds the facility location to 4202 Coleman Street and describes current data-center operations. Evidence

Existing project record

research-final:ND:9121eb203f2f49d40f50
Existing facility identity linked

Rainbow Energy Bismarck Data Center

Bismarck, ND · Rainbow Energy Marketing Corp.

Reported status: operational

Reported capacity: 5 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Bismarck. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Existing project record

research-final:ND:b2ca01cceedada8e1bfc
Existing facility identity linked

Aurum Capital Ventures

Bismark, ND

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Existing project record

research-final:ND:3a19bd911da663cc16f7
Existing facility identity linked

Applied Digital Oliver County AI Factory

Center area, ND · Applied Digital Corporation; Montana-Dakota Utilities Co.

Reported status: proposed

Reported capacity: 430 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Center. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-17

Existing project record

research-final:ND:9059305b449d9c31b89b
Existing facility identity linked

Applied Digital Ellendale 180 MW data-center hosting facility — existing operations

Ellendale, ND · Applied Digital Corporation

Reported status: operational

Exact location not published.

Original source · 2026-08-31

Existing project record

research-final:ND:9de40afe6c2c0a52a1fc
Existing facility identity linked

Applied Digital Ellendale Hosting Facility

Ellendale, ND · Applied Digital Corporation

Reported status: operational

Reported capacity: 180 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-26

Existing project record

research-final:ND:43a7f72b72721548a7ee
Existing facility identity linked

Applied Digital Polaris Forge 1

Ellendale, ND · Applied Digital Corporation; CoreWeave

Reported status: operational (expansion)

Reported capacity: 400 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

Existing project record

research-final:ND:ccc72a3813e24ad64d99
Existing facility identity linked

Applied Digital Polaris Forge 1

Ellendale, ND

Reported status: operational

Exact location not published.

Original source · 2026-10-07

Existing project record

research-final:ND:2662d8a6373269afbc04
Existing facility identity linked

ELN02

Ellendale, ND · Applied Digital

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Read 1 source findings ()

Applied Digital identifies ELN-02 as its 100 MW facility within Polaris Forge 1 in Ellendale, distinct from the ELN-03 building. Evidence

Existing project record

research-final:ND:bd85b38256e1f1fe72a5
Existing facility identity linked

Polaris Forge 1 Current Expansion

Ellendale, ND

Reported status: under construction

Exact location not published.

Original source · 2026-10-07

Existing project record

research-final:ND:204fcc9616cb3fea6bb7
Accepted facility identity linked

702 Communications - Fargo, ND

Fargo, ND · 702 Communications

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings (2026-10-29)

Current operator offers its operating data-center services; Cogent current on-net carrier-neutral data-center listing explicitly binds 702 to the Fargo Fiechtner Drive address. The Moorhead corporate office is not used as the data-center location. Evidence

Existing project record

research-final:ND:5fffdc57b24259a1608a
Accepted facility identity linked

Midco Fargo

Fargo, ND · Midcontinent Communications

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings (2026-10-29)

Current operator page offers staffed Fargo colocation with on-site technical support. No verified facility street address was obtained; geometry remains held. Evidence

Existing project record

research-final:ND:90ed5dadec3de5476854
Research database | Compute Equity Atlas