Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Awaiting source review

Novva Apex Industrial Park Data Center

North Las Vegas, NV · Novva Data Centers

Reported status: proposed

Exact location not published.

Original source · 2026-08-14

research-final:NV:b96b8e1cfc01e6226fa5
Awaiting source review

Novva Las Vegas Data Center

North Las Vegas, NV · Novva Data Centers

Reported status: operational

Reported capacity: 100 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

research-final:NV:cefbff6c2df9601b1bb0
Awaiting source review

Switch Apex Industrial Park Land Position

North Las Vegas, NV · Switch

Reported status: proposed

Exact location not published.

Original source · 2026-09-10

research-final:NV:49848f0de95d8868bef5
Awaiting source review

Switch Core 2.0 Phase 1 Campus

North Las Vegas, NV · Switch

Reported status: proposed

Exact location not published.

Original source · 2026-09-27

research-final:NV:428794dd5a3ff2242442
Awaiting source review

Blackjack Data Center

Pahrump, NV

Reported status: proposed

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Pahrump. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-17

research-final:NV:92bd30e83d19e84d4779
Awaiting source review

Manse Technology Campus

Pahrump, NV · Manse Technology Campus LLC

Reported status: proposed

Exact location not published.

Original source · 2026-09-21

research-final:NV:47c66971e51f0b7ade07
Awaiting source review

Osprey Data Center

Pahrump, NV

Reported status: proposed

Reported capacity: 1.6 GW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Pahrump. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-17

research-final:NV:fc3bbed6d406032a8b1c
Awaiting source review

Oppidan Post Road Data Center (Paradise)

Paradise, NV · Oppidan Investment Company

Reported status: approved/permitted

Reported capacity: 5 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-14

research-final:NV:f1a352719a33d5dcb940
Awaiting source review

Apple Reno Data Center

Reno, NV · Apple

Reported status: operational

Reported capacity: 50 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Reno. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

research-final:NV:75ce05ea0ff2f62c721a
Accepted facility identity linked

CENTRA RNO01 - Reno Nevada (200 S. Virginia)

Reno, NV · CENTRA Digital Interconnect

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings (2026-10-30)

Current operator-linked RNO2 technical sheet explicitly identifies the separately operating CENTRA carrier hotel at 200 South Virginia Street. TahoeIX supplies the same street and ZIP and current colocation interconnection presence. RNO1 alias row 3279 is not an additional admission. Evidence

Existing project record

research-final:NV:93768aa779e6288928cd
Existing facility identity linked

CENTRA RNO1 (200 South Virginia)

Reno, NV · CENTRA Digital Interconnect

Reported status: operational

Exact location not published.

Original source · 2026-09-24

Existing project record

research-final:NV:6ce3fc2147a708f095b2
Accepted facility identity linked

Centra RNO2 Reno Data Center

Reno, NV · Centra Digital Interconnect; Columbia Capital

Reported status: under construction

Reported capacity: 12 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Read 1 source findings (2026-10-30)

Current operator site and linked technical sheet establish the distinct RNO2 development at 265 Keystone, with capacity still described as to be delivered in Q4 2026. Completion is not inferred from the calendar. The abbreviated address lacks a fully verified street binding, so no map point is admitted; area and power figures are not imported. Evidence

Existing project record

research-final:NV:449dafa289764d398a6b
Existing facility identity linked

Colovore RNO01 Reno Data Center

Reno, NV · Colovore; King Street Capital Management

Reported status: under construction

Reported capacity: 16 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Reno. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-17

Existing project record

research-final:NV:74c715727a2f68ff6844
Awaiting source review

Lumen Reno 1

Reno, NV · Lumen Technologies

Reported status: operational

Exact location not published.

Original source · 2026-10-14

research-final:NV:417b0503484c105acf86
Awaiting source review

Lumen Technologies mini Data Center

Reno, NV

Reported status: operational

Reported capacity: 2.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:NV:5df213b23d3cf6a21ba7
Awaiting source review

Oppidan North Valleys Data Center

Reno, NV · Oppidan Investment Company; Connect Data Centers

Reported status: proposed

Reported capacity: 5 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-19

research-final:NV:1b33e10bcef9352c0266
Accepted facility identity linked

Roller Network Reno Data Center

Reno, NV · Roller Network LLC

Reported status: operational

Exact location not published.

Original source · 2026-09-24

Read 1 source findings (2026-10-30)

Current operator confirms active Reno colocation; TahoeIX explicitly locates its core exchange and eligible colocation at Roller Network 3545 Airway Drive. The operator contact page corroborates street, Suite 114 and ZIP. Census matches the building street and ZIP, not a rooftop or suite. Evidence

Existing project record

research-final:NV:12b3350cac7da7bd3eb8
Awaiting source review

Webb Data Center

Reno, NV

Reported status: under construction

Reported capacity: 28.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:NV:3b0d90871288f654600d
Awaiting source review

Fleet Reno / Storey County Hyperscale Campus

Reno-Sparks area, NV · Fleet Data Centers; Tract Capital Management

Reported status: under construction

Reported capacity: 400 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer county centroid for Storey County. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-17

research-final:NV:bfb07e9748d33a2c7cd5
Existing facility identity linked

EdgeCore Reno Campus

Reno/Sparks, NV · EdgeCore Digital Infrastructure; Partners Group

Reported status: under construction

Reported capacity: 216 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Reno. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Existing project record

research-final:NV:f2a9f649d6eca76b7f01
Accepted facility identity linked

Google Storey County Data Center

Reno/Sparks, NV · Google

Reported status: operational

Reported capacity: 86 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Reno. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Read 1 source findings (2026-10-29)

Current operator verifies existing Storey County campus and its continuing operations. Distinct from already canonical Henderson; precise street geometry remains held. Evidence

Existing project record

research-final:NV:a6a4fbcb45fc38279442
Existing facility identity linked

Novva Tahoe Reno Data Center

Reno/Sparks, NV · Novva Data Centers

Reported status: operational

Reported capacity: 60 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Reno. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Existing project record

research-final:NV:f493bf3c6474fb1458e4
Awaiting source review

PowerHouse Reno Data Center

Reno/Sparks, NV · PowerHouse Data Centers; Harrison Street

Reported status: under construction

Reported capacity: 200 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Reno. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-18

research-final:NV:eac94e34fb756840dae1
Awaiting source review

Switch Citadel Campus (Tahoe Reno)

Reno/Sparks, NV · Switch; DigitalBridge; IFM Investors

Reported status: operational (expansion)

Reported capacity: 2.0 GW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Reno. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

research-final:NV:df4700cd262b7e7fb9f1
Awaiting source review

Tract Peru Shelf Technology Park

Reno/Sparks, NV · Tract

Reported status: under construction

Reported capacity: 810 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Reno. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

research-final:NV:123879a52036c0f6ab72
Awaiting source review

Tract South Valley Technology Park

Reno/Sparks, NV · Tract

Reported status: under construction

Reported capacity: 1.2 GW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Reno. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-18

research-final:NV:1eca7f2da6cb1d860e64
Existing facility identity linked

Vantage Data Centers NV1 Campus

Reno/Sparks, NV · Vantage Data Centers

Reported status: under construction

Reported capacity: 224 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Reno. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-19

Existing project record

research-final:NV:3933c936c0fa375afd1d
Awaiting source review

Sarcobatus Solar Project (off-grid bitcoin mining)

Scotty's Junction, NV · Tesla Solar LLC

Reported status: approved/permitted

Exact location not published.

Original source · 2026-09-24

research-final:NV:02ba494461132c89915b
Accepted facility identity linked

Microsoft Silver Springs Data Center

Silver Springs, NV · Microsoft Corporation

Reported status: proposed

Exact location not published.

Original source · 2026-07-17

Read 1 source findings (2026-10-29)

Operator September 2026 update confirms early construction, earthwork and utility relocation at Silver Springs. Under construction at site-preparation phase, not operating or completed vertical buildings. Evidence

Existing project record

research-final:NV:eec8a657c4acd36f38e2
Existing facility identity linked

Microsoft Silver Springs Datacenter — current campus build

Silver Springs, NV · Microsoft

Reported status: under construction

Exact location not published.

Original source · 2026-09-29

Existing project record

research-final:NV:76404fc239774924d216
Research database | Compute Equity Atlas