Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Existing facility identity linkedCore Scientific Grand Forks Data Center
Grand Forks, ND · Core Scientific
Reported status: operational
Reported capacity: 100 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Existing project record
research-final:ND:da768bacedd8a7f560b4Accepted facility identity linkedMidco Grand Forks
Grand Forks, ND · Midcontinent Communications
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Read 1 source findings (2026-10-29)
Current operator directory explicitly identifies its Grand Forks data center and available cabinets/private cages. No verified facility street address was obtained; geometry remains held. Evidence
Existing project record
research-final:ND:c646556a1900734ec7a0Existing facility identity linkedApplied Digital Polaris Forge 3
Hanover, ND · Applied Digital Corporation
Reported status: under construction
Reported capacity: 430 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-26
Existing project record
research-final:ND:2d4bbd3d5621d508c607Awaiting source reviewApplied Digital
Harwood, ND
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-12
research-final:ND:0b7a2c4ce2351390a1d4Existing facility identity linkedApplied Digital Polaris Forge 2
Harwood, ND · Applied Digital Corporation
Reported status: under construction
Reported capacity: 300 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-19
Existing project record
research-final:ND:dd6dcba364bede076cbcExisting facility identity linkedPolaris Forge 2 Current Construction
Harwood, ND
Reported status: under construction
Exact location not published.
Original source · 2026-10-07
Existing project record
research-final:ND:ae0fca08dcff4745db71Existing facility identity linkedApplied Digital JMS01
Jamestown, ND · Applied Digital Corporation
Reported status: operational
Reported capacity: 106 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
Existing project record
research-final:ND:ce798f5ab4f09dc2ba72Accepted facility identity linkedHarmony Energy Park (Geronimo Power data center)
Mapleton, ND · Geronimo Power
Reported status: proposed
Reported capacity: 540 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-26
Read 1 source findings (2026-10-30)
Developer current project page confirms proposed data-center campus in Harmony Township, Cass County, and September 15, 2026 CUP application. The developer explicitly states nothing has been approved; October 22 update confirms continuing community process. This is not an operating facility, and the nearby solar project is not counted as another data center. Evidence
Existing project record
research-final:ND:0d865a479271d0949361Existing facility identity linkedBitzero Nekoma Data Center (Stanley R. Mickelsen Safeguard Complex)
Nekoma, ND · Bitzero
Reported status: operational
Reported capacity: 300 MW planned; 2.5 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-10-10
Read 1 source findings ()
Bitzero's MD&A locates its North Dakota property on 81st Street in Nekoma and says the property contains the currently non-operational Nekoma Pyramid data center; its Norway operating data center is a separate physical location. Evidence
Existing project record
research-final:ND:f918e8d09d81bad03413Existing facility identity linkedBitzero Nekoma Pyramid Data Center
Nekoma, ND · Bitzero Blockchain Inc.; Cavalier County Job Development Authority
Reported status: proposed
Reported capacity: 300 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Nekoma. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-19
Existing project record
research-final:ND:3733b319b3bcf3b38cb8Accepted facility identity linkedDakota Carrier Network
Prairie Rose, ND · Dakota Carrier Network
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Read 1 source findings (2026-10-29)
Operator identifies the Great Plains data center in Fargo, with 3901 Great Plains Drive South on its network operations page. Source row city Prairie Rose is a nearest-place label, corrected to the operator city. Census omitted the South suffix, so geometry remains held. Original registry coordinates are not copied. Evidence
Existing project record
research-final:ND:08b120f253cec2a06f5dExisting facility identity linkedApplied Digital Jamestown — 106 MW data-center hosting facility, existing operations (APLD Hosting LLC)
Spiritwood Lake, ND · Applied Digital Corporation
Reported status: operational
Reported capacity: 100.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-08-31
Existing project record
research-final:ND:eb7989f170460ef156acExisting facility identity linkedNakota AI Data Campus
Springbrook, ND · Tachyon9 Corp. / Nixxy Inc.
Reported status: proposed
Reported capacity: 1000 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-26
Existing project record
research-final:ND:09e32d024500b3bbf649Existing facility identity linkedRiver Run Energy Center Data Center Campus
Stanton area, ND · Basin Electric Power Cooperative; NextEra Energy Resources; Roughrider Electric Cooperative; Upper Missouri Power Cooperative
Reported status: proposed
Reported capacity: 1.4 GW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Stanton. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
Existing project record
research-final:ND:d15802c094f15f0ad808Existing facility identity linkedEnerfore Digital Pleasant Valley Data Center
Tioga area, ND · Enerfore Digital Valley, LLC; Enerfore Digital
Reported status: under construction
Reported capacity: 30 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Tioga. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-08-05
Existing project record
research-final:ND:55f8529d61afdedc43f9Existing facility identity linkedProject Trinity
Tioga area, ND · Teton Digital
Reported status: proposed
Reported capacity: 100 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Tioga. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
Existing project record
research-final:ND:f438ff6ca9d9322065adAccepted facility identity linkedJDE Holdings Towner Data Center
Towner, ND · JDE Holdings
Reported status: under construction
Reported capacity: 5 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-26
Read 1 source findings (2026-10-30)
County November 7, 2024 proceedings identify JDE Holdings data-center facility and approve exterior air-cooler CUP. The primary minutes do not establish current construction or operation, or an exact Towner address. Publish county-level identity with unknown current lifecycle, no imported archive centroid or planned power. Evidence
Existing project record
research-final:ND:45c2f57a18fb9c5f1d93Awaiting source reviewGreenidge Underwood (North Dakota)
Underwood, ND · Greenidge Generation
Reported status: operational
Reported capacity: 7.5 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-08-05
Read 1 source findings ()
Greenidge operates a facility under lease in Underwood, North Dakota; the company reports 7.5 MW of self-mining capacity via a five-year lease, not measured critical IT load of a confirmed standalone site. Evidence
research-final:ND:6b887b525914932962d7Existing facility identity linkedRainbow Energy Coal Creek Data Center Park
Underwood, ND · Rainbow Energy Center, LLC
Reported status: proposed
Reported capacity: 415 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-02-05
Existing project record
research-final:ND:38f82e2731e4844f3a80Existing facility identity linkedAtlas Power Data Center
Williston, ND · FX Solutions Inc.; Atlas Power Holdings ND, LLC
Reported status: operational
Reported capacity: 700 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Existing project record
research-final:ND:71204aac2a6dc2783840Existing facility identity linkedProject Fighting Pike
Williston, ND · Critical Data House; Intermountain IG
Reported status: proposed
Reported capacity: 455 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
Existing project record
research-final:ND:a85651edc4eff5c4d4d7Existing facility identity linkedCathedra Bitcoin North Dakota Facility
, ND · Cathedra Bitcoin
Reported status: operational
Reported capacity: 60 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Existing project record
research-final:ND:d124b9dab88cd6db8469Existing facility identity linkedNakota AI Data Campus
, ND · Nixxy, Inc.; Tachyon9 Corporation
Reported status: proposed
Reported capacity: 1.0 GW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Existing project record
research-final:ND:48dab8db5a1e142b0d8bExisting facility identity linkedAAIM Nebraska 2 Data Center
Adams County, NE · AAIM Data Centers
Reported status: under construction
Reported capacity: 12.5 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Existing project record
research-final:NE:4969ea3ec778f9a8e533Existing facility identity linkedFortitude Aurora Nebraska Facility
Aurora, NE · Fortitude
Reported status: operational
Reported capacity: 15 MW planned; 5 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-08-08
Existing project record
research-final:NE:606e3829d0b63b5e9ad7Awaiting source reviewLevel(3) Bellevue
Bellevue, NE · Lumen Technologies
Reported status: operational
Exact location not published.
Original source · 2026-06-17
research-final:NE:233b15469d8da2fe81a6Existing facility identity linkedTierPoint Omaha - Bellevue (BEL) — existing data-centre and colocation operations
Bellevue, NE · TierPoint
Reported status: operational
Exact location not published.
Original source · 2026-09-03
Existing project record
research-final:NE:07668e26477cc17a690bExisting facility identity linkedTierPoint Omaha-Bellevue Data Center
Bellevue, NE · TierPoint, LLC
Reported status: operational
Reported capacity: 9 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Existing project record
research-final:NE:72596f09fbb736dc8b61Awaiting source reviewGoogle
Bennington, NE · Google LLC
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-21
research-final:NE:2f1b596df89696f3161aAwaiting source reviewUnnamed source-mapped location
Bennington, NE
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-02-09
research-final:NE:14e7dd43f070eb2949ce